Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

3 unique locations (39 components)

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (29 components) Geocoding Needed
β€’ The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
β€’ The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
β€’ The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Diesel) UK POWER RESERVE LIMITED Existing Generating CMU Asfordby 1 Power Station Asfordby 1 Power Station +12 more LE14
Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
43.67 MW
Sub station Percival Lane Runcorn Cheshire WA7 4DS (4 components) Geocoding Needed

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Storage (Duration 1h) SIGBAT F LIMITED New Build Generating CMU UKER75 UKER77 WA7
Inactive β€’ 2020-21 (T-4), 2019-20 (T-1)
26.10 MW
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (6 components) Geocoding Needed

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Storage Storage (Duration 1h) SIGBAT A LIMITED New Build Generating CMU UKER28 UKER28 +2 more CH65
Inactive β€’ 2020-21 (T-4), 2019-20 (T-1) ...
34.18 MW
Loading map...
Showing 3 locations