Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

317 unique locations (1239 components) - Page 10 of 13

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Great Wheatley Road Rayleigh SS6 7AR (1 component)

4 x 2.5MW and 1 x 0.8MW BESS units installed on the site

Storage (Duration 1h) WEIRS DROVE DEVELOPMENT LIMITED New Build Generating CMU Not Prequalified SS6
Active • 2024-25 (T-4)
Great Field Lane, Somerden Road, Hull, HU9 5QJ (2 components)

New build one-hour duration storage to replace diesel plant (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
1.77 MW
Goosehall Farm, Factory Road, Burwell, CB25 0BN (2 components)

A 5MW/5MWh Storage: minimum 1.0 hour duration battery facility sharing an existing connection with an existing solar farm but electrically separate with its own independent Import and Export metering system … (2)

Storage (Duration 1h) LIGHTSOURCE SPV 115 LIMITED New Build Generating CMU Burwell Storage Facility CB25
Active • 2025-26 (T-4), 2022-23 (T-1)
Gipsy Lane, A664, Rochdale, OL11 3HA (3 components)

A Battery Energy Storage System (3)

Storage (Duration 1h) ARL 001 LIMITED New Build Generating CMU Gipsy Lane Gipsy Lane +1 more OL11
Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.35 MW
Gipsy Lane, A664, Rochdale, OL11 3AE (4 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for 18mw which is split between CMUs - further detail in covering letter
• 8 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for 18mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System
Storage (Duration 1h) ARL 001 Limited New Build Generating CMU Gipsy Lane A Not Prequalified OL11
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Gerard Hall Battery Site, Mill Lane, Nursling SO16 0YE (2 components)

New Battery Storage Site comprising brand new batteries & inverters

Active • 2025-26 (T-4)
Gatwick Electric Forecourt Buckingham Gate Gatwick RH6 0NT (1 component)

A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt

Storage (Duration 1h) GATWICK ELECTRIC FORECOURT LTD New Build Generating CMU Gatwick Electric Forecourt RH6
Active • 2026-27 (T-4)
0.71 MW
Gatwick Electric Forecourt Buckingham Gate Gatwick RH6 0NT (4 components)

A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt (3)

Storage (Duration 1h) GATWICK ELECTRIC FORECOURT LTD New Build Generating CMU Gatwick Electric Forecourt Gatwick Electric Forecourt +1 more RH6
Active • 2025-26 (T-1), 2024-25 (T-1) ...
2.61 MW
Gateway Crescent, Oldham Broadway Park, Oldham, Lancashire OL9 9XB (1 component)

The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system …

Storage (Duration 1h) FIELD OLDHAM LTD New Build Generating CMU Field Oldham OL9
Inactive • 2023-24 (T-1)
3.72 MW
Gateshead Local Environmental Services, Park Road, Gateshead, NE8 3HN (3 components)

Battery storage (3)

Storage Storage (Duration 1h) BRITISH GAS TRADING LIMITED New Build Generating CMU Gateshead Battery Storage NE8
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Gateshead Electric Forecourt Park Road Felling by-pass Gateshead NE10 0EA (1 component)

6.000MW Battery Energy Storage System to be installed at Gateshead Electric Forecourt

Storage (Duration 1h) GATESHEAD ELECTRIC FORECOURT LTD New Build Generating CMU Gateshead Electric Forecourt Rejected NE10
Active • 2026-27 (T-4)
0.71 MW
Gateshead Electric Forecourt Park Road Felling by-pass Gateshead NE10 0EA (1 component)

6.000MW Battery Energy Storage System to be installed at Gateshead Electric Forecourt

Storage (Duration 1h) GATESHEAD ELECTRIC FORECOURT LTD New Build Generating CMU Gateshead Electric Forecourt Rejected NE10
Inactive • 2023-24 (T-1)
1.12 MW
Galaxy Business Park Blaydon-on-Tyne NE21 4NT (1 component)

A 99.8MW battery storage system comprising approx 13 battery skid units at Galaxy Business Park

Storage (Duration 1h) Capella Bess Ltd New Build Generating CMU NewcastleBS50 Not Prequalified NE21
Active • 2025-26 (T-4)
Forkers Yard, Off Shaw Street, West Bromwich, B70 0TX (1 component)

99.4MW/99.4MWh brownfield BESS located off Shaw Street on a plot of land called Forkers Yard in West Bromwich, England

Storage (Duration 1h) JRB GENERATION LTD New Build Generating CMU OCKER HILL Not Prequalified B70
Active • 2025-26 (T-4)
Forest Lane, Alne, York, YO61 1TU (1 component)

1x 2.000MW 1 hour Energy Storage System

Storage (Duration 1h) LIMEJUMP LTD New Build Generating CMU Not Prequalified YO61
Active • 2024-25 (T-4)
FORDTOWN ENERGY STORAGE, KINTORE, INVERURIE, AB51 0XJ (3 components)

49.99MW Lithium-ion Energy Storage System (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.97 MW
Field At Grid Reference 504139 456454, Back Lane, Skerne, East Riding Of Yorkshire, YO25 8NQ (Address in planning application) Land Adjacent Driffield Supply Point, Wansford Road, Driffield (Address of grid connection) (2 components)
• CMU is a 28MW/56MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV system and shares a grid connection. The solar PV and the BESS will be separately metered and registered as separate BMUs. The BESS will connect to the grid via the 20/66 kV substation of the Facility, connecting to additional panels on the 20kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 28 containers with Lithium Ion battery modules (LFP), containers further including HVAC, fire extinguishing system and controls; 7 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/20kV step up transformer and a 630A 20 kV Ring Main Unit (RMU);
• CMU is a 32MW 32MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV system and shares a grid connection. The solar PV and the BESS will be separately metered, and registered as separate BMUs. The BESS will connect to the grid via the 20/66 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 16 containers with Lithium Ion battery modules (LFP), containers further including HVAC, fire extinguishing system and controls; 8 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU);
Storage (Duration 1h) Storage (Duration 2h) DRIFFIELD SOLAR AND STORAGE LIMITED New Build Generating CMU Driffield Solar and Storage Driffield Solar and Storage YO25
Active • 2027-28 (T-4), 2026-27 (T-4)
6.32 MW
Ferrymuir Farm, Cupar, KY15 5RW (3 components)

49.900MW one-hour duration battery energy storage facility. (3)

Storage (Duration 1h) GSES 1 LIMITED New Build Generating CMU Ferrymuir Ferrymuir +1 more KY15
Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.94 MW
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (10 components)

Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 AGABS4 +2 more PR2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.40 MW
Feddal Battery Storage System, Feddal Estate, Dunblane, FK15 9RD (1 component)

9.999MW/9.999MWh greenfield BESS located approximately 3km West of Braco village, Dunblane, Scotland

Active • 2025-26 (T-4)
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RA (1 component)

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).

Storage (Duration 1h) CAPBAL (BRACO) LIMITED New Build Generating CMU BRAC24 FK15
Active • 2027-28 (T-4)
0.77 MW
Faraday Road, Plymouth, PL4 0SR (2 components)

New build one-hour duration storage to replace diesel plant (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
1.89 MW
East to Sundon NG Substation Chalton Luton LU4 9UQ (1 component)

30.000 MW standalone battery energy storage project

Active • 2026-27 (T-4)
3.54 MW
Duncombe Road, Girlington, Bradford, BD8 9AL (2 components)

New build one-hour duration storage to replace diesel plant (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
1.18 MW
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (5 components)

Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS4 Ancala (2B) +1 more CV37
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Loading map...
Showing 25 locations