Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 003 LIMITED New Build Generating CMU Royle Barn Road Royle Barn Road +3 more OL11
Active • 2026-27 (T-4), 2025-26 (T-4) ...
35.11 MW
Royle Farm Burton upon Trent Derbyshire DE15 9TU (1 component)

A 90 MW battery storage system comprising approx 11 battery skid units units at Royle Farm Business Park

Storage (Duration 1h) ALUDRA BESS LTD New Build Generating CMU DrakelowBS52 Not Prequalified DE15
Active • 2025-26 (T-4)
Royle Farm, Burton upon Trent, Derbyshire, DE15 9TU (2 components)
• A 90 MW battery storage system comprising approx 11 battery skid units units at Royle Farm Business Park
• Containerised battery storage asset, 2 hour duration
Storage (Duration 1h) Storage (Duration 2h) ALUDRA BESS LTD New Build Generating CMU ALUDRA BESS LTD (Drakelow) DE15
Active • 2026-27 (T-4), 2025-26 (T-4)
39.23 MW
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …

Storage Storage (Duration 1h) GHEB2 C2 Limited CONRAD (WINCHESTER) LIMITED New Build Generating CMU Russell Farm Russell Farm +3 more SO21
Active • 2025-26 (T-4), 2024-25 (T-4) ...
26.94 MW
Safran Landing Systems Services UK Ltd, Safran MRO UK, METEOR BUSINESS PARK, CHELTENHAM ROAD EAST, GLOUCESTER, GLOUCESTERSHIRE, GL2 9QL (4 components)

1.500MW Battery Energy Storage System

Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT001 GL2
Active • 2025-26 (T-4), 2024-25 (T-4) ...
0.72 MW
Scotia Road Business Park, Tunstall, Stoke on Trent, ST6 4HG (1 component)

The CMU component will have a connection capacity of 2.5MW. BYD Battery

Storage (Duration 1h) THE ISLE OF WIGHT ENERGY COMPANY LIMITED New Build Generating CMU Not Prequalified ST6
Active • 2026-27 (T-4)
0.30 MW
SEC, Stobcross Road, Scottish Event Campus, Stobcross, Glasgow, G3 8DG (2 components)

60MW / 60MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU SEC 1 SEC 2 Not Prequalified G3
Active • 2026-27 (T-4)
14.17 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (9 components)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
6.72 MW
Site 300 metres South West of Shilton Cottage, Old Greenock Road, Bishopton, PA7 5NS (2 components)

Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; …

Active • 2025-26 (T-4), 2022-23 (T-4)
14.76 MW
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (5 components)

5MW, 1 hour/5MWh lithium-ion battery (3)

Storage Storage (Duration 1h) BRAINTREE ELECTRIC FORECOURT LTD New Build Generating CMU Braintree Electric Forecourt Braintree Electric Forecourt +2 more CM77
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
0.93 MW
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (8 components)
• 5MW, 1 hour/5MWh lithium-ion battery
• Slamseys is a 10MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
8.17 MW
Snarlton Farm Battery Snarlton Lane Melksham SN12 7QP (1 component)

47.000MW standalone battery energy storage project

Active • 2024-25 (T-1)
5.33 MW
Snarlton Farm Battery, Snarlton Lane, Melksham, SN12 7QP (2 components)
• 30.000MW standalone battery energy storage project
• 47.000MW standalone battery energy storage project
Active • 2026-27 (T-4), 2024-25 (T-1)
8.87 MW
SNARLTON LANE, SNARLTON LANE, MELKSHAM, SN12 7QP (1 component)

1 hour Lithium-ion battery storage facility in Melksham, Wiltshire going to be connected to Sandridge 132/33 kV substation with a connection capacity of 49.9MW

Active • 2025-26 (T-1)
5.98 MW
Spitfire Way, Wholeflats, Grangemouth FK3 9UB, Note: This is the same location as SWGAS3. However, this site will be split, with independent connections, companies and planning permissions. We have uploaded a map to show exact location. (4 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
12.11 MW
Stevenage Electric Forecourt Knebworth Stevenage SG1 2AX (1 component)

6.000MW Battery Energy Storage System to be installed at Stevenage Electric Forecourt

Storage (Duration 1h) STEVENAGE ELECTRIC FORECOURT LTD New Build Generating CMU Stevenage Electric Forecourt Rejected SG1
Inactive • 2023-24 (T-1)
1.12 MW
Stevenage Electric Forecourt, Knebworth, Stevenage, SG1 2AX (2 components)

6.000MW Battery Energy Storage System to be installed at Stevenage Electric Forecourt

Active • 2026-27 (T-4), 2023-24 (T-1)
1.83 MW
Stevens Croft Power Station, Johnstonbridge Road, Lockerbie, Dumfries & Galloway. DG11 2SQ (2 components)

A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. …

Storage Storage (Duration 1h) E.ON UK CHP LIMITED New Build Generating CMU Stevens Croft Battery Stevens Croft Battery Conditional DG11
Inactive • 2022-23 (T-4), 2021-22 (T-4)
4.73 MW
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (11 components)
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
DSR Storage (Duration 1h) SUSI EELPOWER WINCHESTER LIMITED Existing Generating CMU WINP18 WINP18 +7 more SO22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
42.53 MW
STOR Field 9, North Road, Inverkeithing, Fife, KY11 1HT (2 components)

49.9MW/49.9MWh BESS located on land east of North Road, Inverkeithing

Storage (Duration 1h) EKU ENERGY PROJECTS (UK) LIMITED New Build Generating CMU INVERKEITHING INVERKEITHING KY11
Active • 2026-27 (T-4), 2025-26 (T-4)
15.85 MW
STOR no.1 site, Ernesettle Road, PLymouth PL2 5TT (4 components)

Storage facility

Storage Storage (Duration 1h) IRE 001 LIMITED New Build Generating CMU KEYDT1 2MW storage KEYDT2 18MW storage +1 more PL2
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
9.32 MW
STOR no.1 site, Ernesettle Road, PLymouth PL5 2TT (1 component)

Storage facility

Storage (Duration 1h) IRE 001 Limited New Build Generating CMU Ernesettle Lane PL5
Inactive • 2022-23 (T-1)
5.17 MW
Stroud Green Lane Add Cap - Battery, Fareham PO14 2HS (6 components)
• 30MW OF BATTERY ENERGY STORAGE SYSTEMS
• 40MW OF BATTERY ENERGY STORAGE SYSTEMS
• BATTERY ENERGY STORAGE SYSTEM
Storage (Duration 1h) FAREHAM ENERGY RESERVE LIMITED Existing Generating CMU FAR123 FAR123 PO14
Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.01 MW
Sub station Percival Lane Runcorn Cheshire WA7 4DS (4 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Storage (Duration 1h) SIGBAT F LIMITED New Build Generating CMU UKER75 UKER77 WA7
Inactive • 2020-21 (T-4), 2019-20 (T-1)
26.10 MW
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (11 components)
• 20.000 MW of battery storage located at Macclesfield.
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGHUL2 AGHUL2 +2 more SK10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
33.21 MW
Loading map...