Storage (Duration 1h)

334 unique locations (1426 components) - Page 13 of 14

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (5 components) Geocoding Needed

2MW BESS

Storage Storage (Duration 1h) KIWI POWER LTD Existing Generating CMU KPB001 KPB001 PL6
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
1.94 MW
Thames Water Sewage Works Amersham Road Denham Buckinghamshire SL9 7AW (1 component)

A new battery storage plant, with associated civil works, switchgear and electrical connection.

Storage (Duration 1h) Field Gerrards Cross Ltd New Build Generating CMU Peak Gen Power 27 Not Prequalified SL9
Inactive • 2021-22 (T-1)
Thames Water Sewage Works, Amersham Road, Denham, Buckinghamshire, SL9 7AW (2 components) Geocoding Needed

A new battery storage plant, with associated civil works, switchgear and electrical connection.

Active • 2024-25 (T-4), 2021-22 (T-1)
5.01 MW
The Common, Malmesbury, SN16 9RJ (2 components) Geocoding Needed
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Storage (Duration 1h) Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Malmesbury Malmesbury Not Prequalified SN16
Active • 2026-27 (T-4), 2025-26 (T-4)
13.05 MW
The Common, Malmesbury, Wiltshire, SN16 9RJ (10 components) Geocoding Needed
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System.
Storage (Duration 1h) BRK 001 Limited New Build Generating CMU The Common The Common A +2 more Conditional SN16
Active • 2024-25 (T-4), 2023-24 (T-4) ...
37.19 MW
The Manorway, Stanford-le-Hope, SS17 9LL (3 components) Geocoding Needed
• A Battery Energy Storage System
• Reciprocating engines of 6 mW.
Storage (Duration 1h) Storage (Duration 2h) CORPOWER LIMITED CORRINGHAM POWER LIMITED New Build Generating CMU Corpower Battery Corringham SS17
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.74 MW
The Manorway, Stanford-leHope, SS17 9LL (5 components) Geocoding Needed
• A Battery Energy Storage System
• A gas fuelled generating station
Active • 2025-26 (T-4), 2024-25 (T-1)
26.37 MW
The Street, Hacheston, Woodbridge, Suffolk, UK, IP13 9ND (6 components) Geocoding Needed
• A 50MW New Build Battery Storage site
• Existing 50MW Battery Storage site
Storage (Duration 1h) HC ESS6 LIMITED New Build Generating CMU Wickham Market 3 Wickham Market 3 +1 more IP13
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
37.71 MW
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (4 components)
• 1.200MW Battery Energy Storage System (2)
• 1.200 MW of demand reduction
DSR Storage Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT003 KnotKirkThry S64
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Thrybergh Weir, Kilnhurst, Mexborough, South Yorkshire, S64 5TJ (7 components) Geocoding Needed
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.48 MW
Thrybergh Weir, Kilnhurt, Mexborough, South Yorkshire, S64 5TJ (3 components) Geocoding Needed

1.200MW BESS

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.45 MW
Tickhill Road, Maltby, S66 7QR (1 component) Geocoding Needed

New Build CMU comprising of battery storage and associated plant

Storage (Duration 1h) POWER INITIATIVES LIMITED New Build Generating CMU Maltby Rejected S66
Active • 2025-26 (T-4)
4.19 MW
Tiln Farm, Tiln Lane, Retford, Nottinghamshire, DN22 9JH (1 component) Geocoding Needed

A 25MW/25MWh Storage: minimum 1.0 hour duration battery facility which will share a future connection agreement with a future solar farm but electrically separate with its own independent Import and …

Storage (Duration 1h) TILN CONNECTIONS LTD New Build Generating CMU Tiln Storage Facility DN22
Active • 2025-26 (T-4)
4.99 MW
TIR John North Road, St Thomas, Swansea, SA1 7BG (2 components) Geocoding Needed
• New build one-hour duration storage to replace diesel plant
• One Hour Duration Battery Storage Plant
Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT02 SA1
Active • 2025-26 (T-4), 2024-25 (T-1)
5.97 MW
TIR John North Road, St Thomas, Swansea, SA1 7BG / SA1 8NZ (1 component) Geocoding Needed

New build one-hour duration storage to replace diesel plant

Storage (Duration 1h) PULSE CLEAN ENERGY UK LIMITED New Build Generating CMU BATT02 SA1
Inactive • 2023-24 (T-1)
3.35 MW
Traston Road, Newport, NP19 4PW (1 component) Geocoding Needed

A 18MW distribution connected energy storage plant comprising of batteries

Storage (Duration 1h) WP GRID STORAGE 1 LIMITED New Build Generating CMU WP BESS 1 Not Prequalified NP19
Active • 2025-26 (T-4)
3.59 MW
Unit 12, Gateway Crescent, Oldham, Lancashire, OL9 9XB. (1 component) Geocoding Needed

The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system …

Storage (Duration 1h) FIELD OLDHAM LTD New Build Generating CMU Gateway Crescent OL9
Active • 2024-25 (T-4)
4.95 MW
Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP (5 components) Geocoding Needed
• 3 x 2MW gas gen sets
• Battery Storage Station
Storage (Duration 1h) Storage (Duration 1.5h) Storage (Duration 2.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Union Road Storage Union Road Storage +2 more BL2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.03 MW
Unit 5, Bloxwich Lane Estate, Walsall, WS2 8DL (3 components) Geocoding Needed

BESS System made of 35x1.25 MVA Inverters connected to Batteries in a designated warehouse.

Active • 2025-26 (T-1), 2024-25 (T-1) ...
15.79 MW
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (2 components) Geocoding Needed

The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW.

Storage Storage (Duration 1h) Reliagen Electric Ltd New Build Generating CMU Staines Battery Storage Facility Staines Battery Storage Facility Conditional TW18
Inactive • 2022-23 (T-4), 2021-22 (T-4)
23.60 MW
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (12 components) Geocoding Needed
• 25 MW storage site using Lithium Ion Batteries
• Existing 25 MW storage site using Lithium Ion Batteries
Active • 2026-27 (T-4), 2025-26 (T-1) ...
17.73 MW
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (5 components) Geocoding Needed

10MW battery energy storage facility at Upton Lane, Rownhams

Storage Battery Storage Storage (Duration 1h) GBSL NURSLING LIMITED New Build Generating CMU GBSL Nursling GBSL Nursling +1 more Conditional SO16
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
16.41 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (9 components) Geocoding Needed
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Storage Storage (Duration 1h) Storage (Duration 2h) HARMONY CS LIMITED New Build Generating CMU CONTEGO CONTEGO +3 more BN6
Active • 2024-25 (T-4), 2023-24 (T-1) ...
74.30 MW
Welbeck Landfill Site, Boundary Lane, Normanton, Wakefield, WF6 2JA (2 components) Geocoding Needed

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Welbeck Storage Welbeck Storage Not Prequalified WF6
Active • 2025-26 (T-4)
2.25 MW
Welkin Road, Bredbury, SK6 2BH (6 components) Geocoding Needed
• A gas fuelled generating station.
• Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1) ...
35.07 MW
Loading map...
Showing 25 locations