Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

227 unique locations (962 components) - Page 2 of 10

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Bronze Cricket Club, Chapel Lane, Great Barr, Walsall, WS9 0QU (2 components)
• 2 hr duration Battery Energy Storage System located in England
• Energy Storage Facility
Storage (Duration 1h) Storage (Duration 2h) CHAPEL LANE ENERGY STORAGE LIMITED New Build Generating CMU Chapel Lane ES Chapel Lane ES WS9
Active • 2028-29 (T-4), 2026-27 (T-4)
14.62 MW
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT (5 components)

Battery storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT with a nameplate capacity of 0.800 MW. Connection capacity is calculated as the Average Output of the … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS4 Ancala (1B) +1 more BA14
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (4 components)
• 1.200MW Battery Energy Storage System (2)
• 1.2 MW of demand reduction
DSR Storage Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT003 KnotKirkThry WF11
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Bullo Road, Fieldhouse, Awre, GL14 1EL (6 components)
• New build 1.5 hour duration battery storage
• New build one-hour duration storage
Active • 2026-27 (T-4), 2025-26 (T-4)
4.73 MW
Bulls Head Farm Eakley Lanes Goldington Newport Pagnell Buckinghamshire MK16 8LP (2 components)

0.800MW Battery Energy Storage System (2)

Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT002 MK16
Active • 2025-26 (T-4), 2024-25 (T-4)
Calow Green, Calow, S44 5XQ (3 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 005 LIMITED New Build Generating CMU Calow Green Calow Green +1 more Not Prequalified S44
Active • 2026-27 (T-4)
53.16 MW
Camilla Farm, Auchtertool, Kirkcaldy, Fife, KY2 5XW (4 components)

49.9MW Lithium-ion Energy Storage System (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
23.81 MW
Capenhurst Lane Cheshire CH66 2NT (1 component)

A 99.8MW battery storage system comprising approx 13 skids, to be installed at Capenhurst Lane

Storage (Duration 1h) AURA POWER BESS LTD New Build Generating CMU CapenhurstBS55 Not Prequalified CH66
Active • 2025-26 (T-4)
Carlton, Stockton-on-Tees, TS21 1EA (5 components)

Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 Ancala (1B) +1 more TS21
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Carnegie Road, Liverpool L13 7HY (1 component)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Storage (Duration 1h) Shaw-Energi Ltd New Build Generating CMU Carnegie Road Phase II Not Prequalified L13
Active • 2024-25 (T-4)
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (8 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (3)

Storage Storage (Duration 1h) GHEB2 C3 Limited CONRAD (SWINDON) LIMITED New Build Generating CMU Catsbrain Farm Catsbrain Farm +3 more SN3
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Cedar Cottages, Lower Dunton Road, Bulphan, Upminster, RM14 3TD (1 component)

28MW/28MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU CEDAR COTTAGES Not Prequalified RM14
Active • 2026-27 (T-4)
3.31 MW
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (6 components)
• 0.250MW Battery Energy Storage System (2)
• 0.25MW of Demand Reduction
DSR Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT003 YO25
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (8 components)

A new build 49.5MW battery energy storage system (3)

Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF LIMITED New Build Generating CMU CLAY TYE FARM CLAY TYE FARM +4 more Not Prequalified RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Coity Road, Bridgend, CF31 1NN (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 1h) POWER INITIATIVES LIMITED New Build Generating CMU Bridgend Rejected CF31
Active • 2025-26 (T-4)
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (7 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Storage (Duration 1h) Storage (Duration 9h) PIVOTED POWER LLP Existing Generating CMU Pivot Power 1 Pivot Power 1 +4 more OX44
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Craigton Interchange, Linburn, Bishopton, Renfrewshire, Scotland, PA7 5NT, United Kingdom (3 components)

30MW/30MWh one hour battery (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.49 MW
Dairy Lane Westhamnett Chichester PO20 2BG (7 components)

4MW battery co-located with a solar farm (3)

Storage (Duration 1h) E.ON UK PLC Existing Generating CMU NPCM-13 NPCM-13 +4 more PO20
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.10 MW
Danks Wy, Golds Hill, West Bromwich, Tipton, DY4 7BT (1 component)

99.4MW / 99.4MWh BESS

Storage (Duration 1h) OCKER HILL BESS LIMITED New Build Generating CMU OCKER HILL DY4
Active • 2026-27 (T-4)
11.74 MW
Darrington Landfill Site, Darrington Leys, Cridling Stubbs, Knottingley, West Yorkshire, WF11 0AH (2 components)

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Darrington Storage Darrington Storage Not Prequalified WF11
Active • 2025-26 (T-4)
Derehams Lane, Loudwater, High Wycombe, HP10 9RW (1 component)

40 MW/40MWh BESS located on an existing farm in Buckinghamshire, England

Storage (Duration 1h) LOUDWATER BESS LIMITED New Build Generating CMU LOUDWATER HP10
Active • 2025-26 (T-4)
Dersalloch Windfarm, Ayr, KA6 7JJ (1 component)

1 x 30MW Lithium-ion battery with duration of 1 hour

Active • 2026-27 (T-4)
3.54 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (60 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Doncaster Power 16MW Ltd, Balby Carr Bank, J3 Business Park, Doncaster, DN4 8DE (1 component)

Battery Storage system with a duration of 1 hour

Storage (Duration 1h) DONCASTER POWER 16MW LIMITED New Build Generating CMU Not Prequalified DN4
Active • 2027-28 (T-4)
1.24 MW
Dougliehill WWTW, Port Glasgow, Inverclyde, PA15 2PB (1 component)

49MW/49MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU DOUGLIEHILL Not Prequalified PA15
Active • 2026-27 (T-4)
5.79 MW
Loading map...
Showing 25 locations