Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

334 unique locations (1426 components) - Page 2 of 14

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Bonnybridge WWTW, Larbert Rd, Bonnybridge, Stirling, FK5 0NP (1 component) Geocoding Needed

60MW/60MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU BONNYBRIDGE Not Prequalified FK5
Active • 2026-27 (T-4)
7.09 MW
Boscar Grange Farm York YO61 3NQ (4 components)

Battery Energy Storage system operating alongside solar farm (3)

Storage (Duration 1h) WARRINGTON RENEWABLES (YORK) LTD Existing Generating CMU BOSCAR GRANGE Rejected YO61
Active • 2025-26 (T-1), 2023-24 (T-1) ...
6.19 MW
Boscar Grange Farm, York, YO61 3NQ (9 components) Geocoding Needed
• Battery Energy Storage system operating alongside solar farm
• Solar Farm consisting of solar PV modules and inverters
Active • 2025-26 (T-1), 2024-25 (T-4) ...
11.18 MW
Boundary Street, Wigan WN1 3AP (6 components) Geocoding Needed

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Storage Storage (Duration 1h) SIGBAT D LIMITED New Build Generating CMU UKER31 UKER33 +2 more WN1
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
22.61 MW
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ (8 components) Geocoding Needed

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …

Storage Storage (Duration 1h) GHEB2 B1 LIMITED New Build Generating CMU Breach Farm Breach Farm +3 more DE12
Active • 2025-26 (T-4), 2024-25 (T-4) ...
53.88 MW
Breck Road, Wallasey, Liverpool (2 components) Geocoding Needed

The Burbo Bank battery is a 2MW/2MWh Battery located near the Burbo Bank offshore wind farm, and near Scottish Power Energy Network's Wallasey substation.

Storage Storage (Duration 1h) ORSTED BURBO (UK) LIMITED New Build Generating CMU Burbo Battery Burbo Battery
Inactive • 2021-22 (T-4), 2019-20 (T-1)
1.41 MW
Brindley Close, Cheney Manor, Swindon, SN2 2YW (1 component) Geocoding Needed

12MW Battery Storage located at Brindley Close in Swindon

Storage (Duration 1h) Zenobe Brindley Limited New Build Generating CMU Brindley IFM SN2
Active • 2024-25 (T-4)
2.97 MW
Brinksway, Stockport, SK3 0BY (2 components) Geocoding Needed

A Battery Energy Storage System

Storage (Duration 1h) AVE 011 Limited New Build Generating CMU Brinksway Not Prequalified SK3
Inactive • 2023-24 (T-4), 2022-23 (T-3)
1.67 MW
Bristol Avenue, Blackpool, FY2 0JF (7 components) Geocoding Needed
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Battery Storage Storage (Duration 1h) Storage (Duration 2h) CONRAD (BLACKPOOL) LIMITED New Build Generating CMU Blackpool Blackpool +3 more FY2
Active • 2026-27 (T-4), 2025-26 (T-4) ...
31.14 MW
BRLR, land east of Redhouse electricity substation, Heatherywood Road, Kirkcaldy, Fife, KY1 3NW. (1 component) Geocoding Needed

Battery energy storage system (1c rating, NMC lithium ion) comprising eight inverters with nominal power output rating of 2.0MW each (16.0MW total). The connection capacity of the BESS has been …

Storage (Duration 1h) BOLSHAN RENEWABLES LIMITED Existing Generating CMU BRLR Redhouse KY1
Active • 2028-29 (T-4)
1.05 MW
Brodsworth Energy Park, Long Lands Lane, Brodsworth, Doncaster, DN6 7FF (2 components) Geocoding Needed

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Brodsworth Storage Brodsworth Storage DN6
Active • 2027-28 (T-4), 2026-27 (T-4)
3.51 MW
Bronze Cricket Club, Chapel Lane, Great Barr, Walsall, WS9 0QU (2 components) Geocoding Needed
• 2 hr duration Battery Energy Storage System located in England
• Energy Storage Facility
Storage (Duration 1h) Storage (Duration 2h) CHAPEL LANE ENERGY STORAGE LIMITED New Build Generating CMU Chapel Lane ES Chapel Lane ES WS9
Active • 2028-29 (T-4), 2026-27 (T-4)
14.62 MW
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT (7 components) Geocoding Needed
• 0.800MW of storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT
• 1 x 0.8MW / 1.1 MWh BYD Lithium Ion Battery: at Brook Hall Farm,North Bradley,Trowbridge,Wiltshire,BA14 9PT
• Battery storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT with a nameplate capacity of 0.800 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Battery Storage Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS4 Ancala (1B) +1 more BA14
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.22 MW
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (3 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
DSR Storage Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU KnotKirkThry WF11
Inactive • 2021-22 (T-1), 2019-20 (T-1) ...
Brotherton Weir, Knottingley, West Yorkshire, WF11 8HR (7 components) Geocoding Needed
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.48 MW
Bullo Road, Fieldhouse, Awre, GL14 1EL (6 components) Geocoding Needed
• New build 1.5 hour duration battery storage
• New build one-hour duration storage
Active • 2026-27 (T-4), 2025-26 (T-4)
10.04 MW
Bulls Head Farm, Eakley Lanes, Goldington, Newport Pagnell, Buckinghamshire, MK16 8LP (2 components) Geocoding Needed

0.800MW Battery Energy Storage System

Active • 2025-26 (T-4), 2024-25 (T-4)
0.58 MW
Calow Green, Calow, S44 5XQ (3 components) Geocoding Needed

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 005 LIMITED New Build Generating CMU Calow Green Calow Green +1 more Not Prequalified S44
Active • 2026-27 (T-4)
53.16 MW
Camilla Farm, Auchtertool, Kirkcaldy, Fife, KY2 5XW (4 components) Geocoding Needed

49.9MW Lithium-ion Energy Storage System

Active • 2026-27 (T-4), 2025-26 (T-4) ...
33.77 MW
Capenhurst Lane, Cheshire, CH66 2NT (1 component) Geocoding Needed

A 99.8MW battery storage system comprising approx 13 skids, to be installed at Capenhurst Lane

Active • 2025-26 (T-4)
19.92 MW
Carlton, Stockton-on-Tees, TS21 1EA (8 components) Geocoding Needed
• 1.200MW of battery storage located at Stockton-on-Tees.
• 1.200MW of storage located at Carlton, Stockton-on-Tees, TS21 1EA
• Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 Ancala (1B) +1 more TS21
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.20 MW
Carnegie Road, Liverpool L13 7HY (1 component) Geocoding Needed

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Storage (Duration 1h) Shaw-Energi Ltd New Build Generating CMU Carnegie Road Phase II Not Prequalified L13
Active • 2024-25 (T-4)
12.39 MW
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (8 components) Geocoding Needed

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …

Storage Storage (Duration 1h) GHEB2 C3 Limited CONRAD (SWINDON) LIMITED New Build Generating CMU Catsbrain Farm Catsbrain Farm +3 more SN3
Active • 2025-26 (T-4), 2024-25 (T-4) ...
26.94 MW
Cedar Cottages, Lower Dunton Road, Bulphan, Upminster, RM14 3TD (1 component) Geocoding Needed

28MW/28MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU CEDAR COTTAGES Not Prequalified RM14
Active • 2026-27 (T-4)
3.31 MW
Chickerell substation, Weymouth, Dorset, DT4 9WW (1 component) Geocoding Needed

49.9MW Lithium Ion Batteries and power conversion system installed in a compound at Chickerell Substation.

Storage (Duration 1h) IQ ENERGY CENTRE LIMITED New Build Generating CMU Not Prequalified DT4
Inactive • 2023-24 (T-4)
10.20 MW
Loading map...
Showing 25 locations