Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

317 unique locations (1239 components) - Page 2 of 13

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Boscar Grange Farm York YO61 3NQ (4 components)

Battery Energy Storage system operating alongside solar farm (3)

Storage (Duration 1h) WARRINGTON RENEWABLES (YORK) LTD Existing Generating CMU BOSCAR GRANGE Rejected YO61
Active • 2025-26 (T-1), 2023-24 (T-1) ...
6.19 MW
Boscar Grange Farm York YO61 3NQ (1 component)

Battery Energy Storage system operating alongside solar farm

Storage (Duration 1h) WARRINGTON RENEWABLES (YORK) LTD Existing Generating CMU BOSCAR GRANGE Rejected YO61
Active • 2024-25 (T-4)
Boundary Street, Wigan WN1 3AP (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

Storage Storage (Duration 1h) SIGBAT D LIMITED New Build Generating CMU UKER31 UKER33 +2 more Not Prequalified WN1
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ (8 components)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (3)

Storage Storage (Duration 1h) GHEB2 B1 LIMITED New Build Generating CMU Breach Farm Breach Farm +3 more DE12
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Breck Road, Wallasey, Liverpool (2 components) Geocoding Needed

The Burbo Bank battery is a 2MW/2MWh Battery located near the Burbo Bank offshore wind farm, and near Scottish Power Energy Network's Wallasey substation. (2)

Storage Storage (Duration 1h) ORSTED BURBO (UK) LIMITED New Build Generating CMU Burbo Battery Burbo Battery
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Brindley Close, Cheney Manor, Swindon, SN2 2YW (1 component)

12MW Battery Storage located at Brindley Close in Swindon

Storage (Duration 1h) Zenobe Brindley Limited New Build Generating CMU Brindley IFM SN2
Active • 2024-25 (T-4)
Brinksway, Stockport, SK3 0BY (2 components)

A Battery Energy Storage System (2)

Storage (Duration 1h) AVE 011 Limited New Build Generating CMU Brinksway Not Prequalified SK3
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Bristol Avenue, Blackpool, FY2 0JF (7 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Battery Storage Storage (Duration 1h) Storage (Duration 2h) CONRAD (BLACKPOOL) LIMITED New Build Generating CMU Blackpool Blackpool +3 more FY2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
24.11 MW
BRLR, land east of Redhouse electricity substation, Heatherywood Road, Kirkcaldy, Fife, KY1 3NW. (1 component)

Battery energy storage system (1c rating, NMC lithium ion) comprising eight inverters with nominal power output rating of 2.0MW each (16.0MW total). The connection capacity of the BESS has been …

Storage (Duration 1h) BOLSHAN RENEWABLES LIMITED Existing Generating CMU BRLR Redhouse KY1
Active • 2028-29 (T-4)
1.05 MW
Brodsworth Energy Park, Long Lands Lane, Brodsworth, Doncaster, DN6 7FF (2 components)

Battery Storage Station (2)

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Brodsworth Storage Brodsworth Storage Not Prequalified DN6
Active • 2027-28 (T-4), 2026-27 (T-4)
3.51 MW
Bronze Cricket Club, Chapel Lane, Great Barr, Walsall, WS9 0QU (2 components)
• 2 hr duration Battery Energy Storage System located in England
• Energy Storage Facility
Storage (Duration 1h) Storage (Duration 2h) CHAPEL LANE ENERGY STORAGE LIMITED New Build Generating CMU Chapel Lane ES Chapel Lane ES WS9
Active • 2028-29 (T-4), 2026-27 (T-4)
14.62 MW
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT (5 components)

Battery storage located at Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT with a nameplate capacity of 0.800 MW. Connection capacity is calculated as the Average Output of the … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS4 Ancala (1B) +1 more BA14
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (3 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
DSR Storage Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU KnotKirkThry WF11
Inactive • 2021-22 (T-1), 2019-20 (T-1) ...
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (4 components)
• 1.200MW Battery Energy Storage System (2)
• 1.2 MW of demand reduction
DSR Storage Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT003 KnotKirkThry WF11
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Bullo Road, Fieldhouse, Awre, GL14 1EL (6 components)
• New build 1.5 hour duration battery storage
• New build one-hour duration storage
Active • 2026-27 (T-4), 2025-26 (T-4)
4.73 MW
Bulls Head Farm Eakley Lanes Goldington Newport Pagnell Buckinghamshire MK16 8LP (2 components)

0.800MW Battery Energy Storage System (2)

Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT002 MK16
Active • 2025-26 (T-4), 2024-25 (T-4)
Calow Green, Calow, S44 5XQ (3 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 005 LIMITED New Build Generating CMU Calow Green Calow Green +1 more Not Prequalified S44
Active • 2026-27 (T-4)
53.16 MW
Camilla Farm, Auchtertool, Kirkcaldy, Fife, KY2 5XW (4 components)

49.9MW Lithium-ion Energy Storage System (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
23.81 MW
Capenhurst Lane Cheshire CH66 2NT (1 component)

A 99.8MW battery storage system comprising approx 13 skids, to be installed at Capenhurst Lane

Storage (Duration 1h) AURA POWER BESS LTD New Build Generating CMU CapenhurstBS55 Not Prequalified CH66
Active • 2025-26 (T-4)
Carlton, Stockton-on-Tees, TS21 1EA (5 components)

Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 Ancala (1B) +1 more TS21
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Carnegie Road, Liverpool L13 7HY (1 component)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Storage (Duration 1h) Shaw-Energi Ltd New Build Generating CMU Carnegie Road Phase II Not Prequalified L13
Active • 2024-25 (T-4)
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (8 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (3)

Storage Storage (Duration 1h) GHEB2 C3 Limited CONRAD (SWINDON) LIMITED New Build Generating CMU Catsbrain Farm Catsbrain Farm +3 more SN3
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Cedar Cottages, Lower Dunton Road, Bulphan, Upminster, RM14 3TD (1 component)

28MW/28MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU CEDAR COTTAGES Not Prequalified RM14
Active • 2026-27 (T-4)
3.31 MW
Chickerell substation, Weymouth, Dorset, DT4 9WW (1 component)

49.9MW Lithium Ion Batteries and power conversion system installed in a compound at Chickerell Substation.

Storage (Duration 1h) IQ ENERGY CENTRE LIMITED New Build Generating CMU Not Prequalified DT4
Inactive • 2023-24 (T-4)
Church Bottom, Salisbury, SP4 6NN (3 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 20 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
Storage (Duration 1h) ARL 008 Limited New Build Generating CMU Conditional SP4
Inactive • 2022-23 (T-4)
Loading map...
Showing 25 locations