Storage (Duration 1h)

227 unique locations (962 components) - Page 2 of 10

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Thames Water Sewage Works Amersham Road Denham Buckinghamshire SL9 7AW (1 component)

A new battery storage plant, with associated civil works, switchgear and electrical connection.

Storage (Duration 1h) Field Gerrards Cross Ltd New Build Generating CMU Peak Gen Power 27 Not Prequalified SL9
Active • 2024-25 (T-4)
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (7 components)

Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Storage Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGHUL2 AGHUL2 +2 more SK10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.12 MW
Stroud Green Lane Add Cap - Battery, Fareham PO14 2HS (6 components)
• 40MW OF BATTERY ENERGY STORAGE SYSTEMS (2)
• BATTERY ENERGY STORAGE SYSTEM
Storage (Duration 1h) FAREHAM ENERGY RESERVE LIMITED Existing Generating CMU FAR123 FAR123 PO14
Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.84 MW
STOR Field 9, North Road, Inverkeithing, Fife, KY11 1HT (2 components)

49.9MW/49.9MWh BESS located on land east of North Road, Inverkeithing (2)

Storage (Duration 1h) EKU ENERGY PROJECTS (UK) LIMITED New Build Generating CMU INVERKEITHING INVERKEITHING KY11
Active • 2026-27 (T-4), 2025-26 (T-4)
5.89 MW
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (11 components)
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
• 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
DSR Storage (Duration 1h) SUSI EELPOWER WINCHESTER LIMITED Existing Generating CMU WINP18 WINP18 +7 more SO22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.78 MW
Stevenage Electric Forecourt Knebworth Stevenage SG1 2AX (1 component)

6.000MW Battery Energy Storage System to be installed at Stevenage Electric Forecourt

Storage (Duration 1h) STEVENAGE ELECTRIC FORECOURT LTD New Build Generating CMU Stevenage Electric Forecourt Rejected SG1
Active • 2026-27 (T-4)
0.71 MW
SNARLTON LANE, SNARLTON LANE, MELKSHAM, SN12 7QP (1 component)

1 hour Lithium-ion battery storage facility in Melksham, Wiltshire going to be connected to Sandridge 132/33 kV substation with a connection capacity of 49.9MW

Active • 2025-26 (T-1)
5.98 MW
Snarlton Farm Battery Snarlton Lane Melksham SN12 7QP (1 component)

30.000MW standalone battery energy storage project

Active • 2026-27 (T-4)
3.54 MW
Snarlton Farm Battery Snarlton Lane Melksham SN12 7QP (1 component)

47.000MW standalone battery energy storage project

Active • 2024-25 (T-1)
5.33 MW
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (3 components)
• 5MW, 1 hour/5MWh lithium-ion battery
• Slamseys is a 10MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO switch gear, Energy Management Systems and Monitoring systems.
Storage Storage (Duration 1h) BRAINTREE ELECTRIC FORECOURT LTD New Build Generating CMU Braintree Electric Forecourt Slamseys Energy Centre +1 more CM77
Active • 2024-25 (T-4), 2022-23 (T-4) ...
Site 300 metres South West of Shilton Cottage, Old Greenock Road, Bishopton, PA7 5NS (2 components)

Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; … (2)

Storage (Duration 1h) ERSKINE ENERGY STORAGE LIMITED New Build Generating CMU Erskine Erskine Energy Storage Rejected PA7
Active • 2025-26 (T-4), 2022-23 (T-4)
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (9 components)
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken. (2)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Storage (Duration 1h) Storage (Duration 1.5h) THRIVE RENEWABLES (WICKEN) LIMITED Existing Generating CMU Wicken Wicken +3 more Rejected MK19
Active • 2026-27 (T-4), 2024-25 (T-1) ...
2.01 MW
SEC, Stobcross Road, Scottish Event Campus, Stobcross, Glasgow, G3 8DG (2 components)

60MW / 60MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU SEC 1 SEC 2 Not Prequalified G3
Active • 2026-27 (T-4)
14.17 MW
Scotia Road Business Park, Tunstall, Stoke on Trent, ST6 4HG (1 component)

The CMU component will have a connection capacity of 2.5MW. BYD Battery

Storage (Duration 1h) THE ISLE OF WIGHT ENERGY COMPANY LIMITED New Build Generating CMU Not Prequalified ST6
Active • 2026-27 (T-4)
0.30 MW
Safran Landing Systems Services UK Ltd, Safran MRO UK, METEOR BUSINESS PARK, CHELTENHAM ROAD EAST, GLOUCESTER, GLOUCESTERSHIRE, GL2 9QL (4 components)

1.500MW Battery Energy Storage System (3)

Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT001 GL2
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (3)

Storage Storage (Duration 1h) GHEB2 C2 Limited CONRAD (WINCHESTER) LIMITED New Build Generating CMU Russell Farm Russell Farm +3 more SO21
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Royle Farm Burton upon Trent Derbyshire DE15 9TU (1 component)

A 90 MW battery storage system comprising approx 11 battery skid units units at Royle Farm Business Park

Storage (Duration 1h) ALUDRA BESS LTD New Build Generating CMU DrakelowBS52 Not Prequalified DE15
Active • 2025-26 (T-4)
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 003 LIMITED New Build Generating CMU Royle Barn Road Royle Barn Road +3 more Not Prequalified OL11
Active • 2026-27 (T-4), 2025-26 (T-1) ...
28.13 MW
Roundswell Business Park, Barnstaple, Devon EX31 3TD (4 components)

Front of the Meter battery storage asset located in Devon. (3)

Storage (Duration 1h) FLEXITRICITY LIMITED Existing Generating CMU FLEX158 EX31
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.38 MW
Rotherham Landfill Site, Meadowhall Road, Kimberworth, Rotherham, South Yorkshire, S61 2JN (2 components)

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Rotherham Storage Rotherham Storage Not Prequalified S61
Active • 2025-26 (T-4)
Richborough Energy Park Ramsgate Road Sandwich CT13 9NL (2 components)
• 35.000MW battery energy storage system
• 35.000MW battery energy storage system.
Active • 2026-27 (T-4)
8.27 MW
Richborough Energy Park Ramsgate Road Sandwich CT13 9NL (3 components)
• 49.990 MW battery energy storage system at Richborough Energy Park
• Battery Energy Storage System
• Battery energy storage system at Richborough Energy Park
Storage (Duration 1h) RICHBOROUGH ENERGY PARK LIMITED Existing Generating CMU PGREP1 PGREP1 CT13
Active • 2025-26 (T-1), 2024-25 (T-1) ...
20.03 MW
Richborough Energy Park Ramsgate road Sandwich CT13 9NL (3 components)
• 49.990 MW battery energy storage system
• Battery Energy Storage System
• battery energy storage system
Storage (Duration 1h) RICHBOROUGH ENERGY PARK LIMITED Existing Generating CMU PGREP2 PGREP2 CT13
Active • 2025-26 (T-1), 2024-25 (T-1) ...
20.03 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
• Gas reciprocating engines as the generating unit. (2)
• Open cycle gas turbine as the generating unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
68.21 MW
Redcoat Lane, Kirkstall, LS4 2AL (1 component)

100MW storage unit

Storage (Duration 1h) EUNITY SUPPORT SERVICES LTD New Build Generating CMU Not Prequalified LS4
Active • 2024-25 (T-4)
Loading map...
Showing 25 locations