Storage (Duration 1h)
90 unique locations (277 components) - Page 2 of 4
Low Dyke, Calthwaite, Penrith, CA11 9PS (4 components)
The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters (3)
Leighton Hall Farm, Middlewich Road, Leighton, Crewe, CW1 4QH (2 components)
10 x 2MW/2MWh containerised Energy Storage System Units to be installed on designated land at Leighton Hall Farm. (2)
Lascar Works, Tanpits Road, Bury BL9 5BY (1 component)
20.000 MW of battery storage located at Lascar Works
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET (1 component)
Frequency response 60 minute Battery Storage
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (3 components)
The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each. (3)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (2 components)
The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)
The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)
The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land to the North of Great Wheatley Road, Rayleigh, SS6 7AR (3 components)
The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each. (3)
Land to the North of Bransholme Rd, Hull HU7 4YP, UK (2 components)
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (6 components)
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (3)
Land south of Westerton Road, Keith Moray, Scotland AB55 5NR (1 component)
Battery Storage
Land South of Main Road, Bilton, Hull, HU11 4DZ (1 component)
New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details.
Land South of Main Road, Bilton, Hull, HU11 4DZ (1 component)
New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details.
Land south of Halesfield 13, Telford, TF7 4PL (2 components)
5MW of Lithium Ion battery storage and power conversion systems. (2)
Land on the West Side of Blandford Road, Poole, BH16 6AB (2 components)
A 25MW New Build Battery Storage site (2)
Land on the south east side of Lark's Lane, Latteridge, Iron Acton, BS37 9TX (2 components)
The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each. (2)
Land on Dalmarnock Road Trading Estate, Rutherglen, G73 1AN. See map uploaded. (3 components)
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV. (3)
Land off Tower House Lane, Saltend, Hull, UK, HU12 8EE (2 components)
The CMU component at the Saltend Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (2)
Land off Carseview Road, Forfar, DD8 3BS (7 components)
Land North of Oxford Road, Gerrards Cross, SL9 8DT (2 components)
20MW of Lithium Ion batteries and power conversion system installed on a compound on land north Oxford Road (2)
Land in the vicinity of Feeder Road, to the east of Phillip Street, Bristol BS2 0TB, UK (1 component)
The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Land at Traston Road, Newport NP19 4PW (1 component)
The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. …
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (5 components)
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (1 component)
3 MW battery to be installed on the same site as an existing CMU however with a new grid connection and metered separately