FORDTOWN ENERGY STORAGE, KINTORE, INVERURIE, AB51 0XJ (5 components)

49.99MW Lithium-ion Energy Storage System

Inactive •
Forest Lane, Alne, York, YO61 1TU (1 component)

1x 2.000MW 1 hour Energy Storage System

Inactive •
Gateshead Electric Forecourt Park Road Felling by-pass Gateshead NE10 0EA (5 components)

6.000MW Battery Energy Storage System to be installed at Gateshead Electric Forecourt

Inactive •
Gateway Crescent, Oldham Broadway Park, Oldham, Lancashire OL9 9XB (4 components)

The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system …

Inactive •
Gatwick Electric Forecourt Buckingham Gate Gatwick RH6 0NT (13 components)

A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt

Active • 2022-23 (T-1), 2023-24 (T-1) ...
7.93 MW
Gipsy Lane, A664, Rochdale, OL11 3AE (4 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for 18mw which is split between CMUs - further detail in covering letter
• 8 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for 18mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System
Inactive •
Gipsy Lane, A664, Rochdale, OL11 3HA (8 components)

A Battery Energy Storage System

Inactive •
Goosehall Farm, Factory Road, Burwell, CB25 0BN (5 components)

A 5MW/5MWh Storage: minimum 1.0 hour duration battery facility sharing an existing connection with an existing solar farm but electrically separate with its own independent Import and Export metering system …

Inactive •
Great Field Lane, Somerden Road, Hull, HU9 5QJ (1 component)

New build one-hour duration storage to replace diesel plant

Inactive •
Greenfield Road, Westoning, Bedford, MK45 5JD (10 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System.
Inactive •
Green Ln, Thurcroft, Wickersley, Rotherham, UK, S66 9JD (18 components)
• A new Build Generating Storage CMU
• Existing Generating Storage CMU
Inactive •
Heatherywood Road, Kirkcaldy KY1 3NW (5 components)

1hr duration battery storage project.

Inactive •
Heatherywood Road, Kirkcaldy, KY1 3NW (1 component)

1hr Duration battery storage project.

Inactive •
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (4 components)

Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU …

Active • 2026-27 (T-4), 2027-28 (T-4) ...
0.20 MW
High Flatworth, North Shields, Tyne and Wear, NE29 7SW (4 components)

New build one-hour duration storage to replace diesel plant

Inactive •
Hulley Road Macclesfield Cheshire SK10 2LP (1 component)

20.000 MW of battery storage located at Macclesfield

Inactive •
Hungerford Farm, Winchfield, Hook, RG27 8SW (3 components)

Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU …

Active • 2028-29 (T-4)
0.11 MW
Indian Queens Substation, St Dennis, St Austell, PL26 8BY (1 component)

49.9 MW of Lithium Ion battery storage and power conversion system on a compound at Indian Queens Substation.

Inactive •
Ipswich Road, Cardiff, CF23 9AQ (10 components)
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2025-26 (T-4), 2026-27 (T-4) ...
41.79 MW
Loading map...