Storage (Duration 1h)

317 unique locations (1239 components) - Page 3 of 13

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (6 components)
• 0.250MW Battery Energy Storage System (2)
• 0.25MW of Demand Reduction
DSR Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT003 YO25
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Clayhill Farm, Greenfield Rd, Westoning, Bedford, MK45 5JD (near MK45 5AD) (1 component)

44MW Storage consisting of 11 x 4MW units

Storage (Duration 1h) ENEL X UK LIMITED Existing Generating CMU MK45
Inactive • 2021-22 (T-4)
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (8 components)

A new build 49.5MW battery energy storage system (3)

Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF LIMITED New Build Generating CMU CLAY TYE FARM CLAY TYE FARM +4 more Not Prequalified RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Cleveland Potash ICL UK Boulby Mine Loftus Saltburn TS13 4UZ (2 components)

6MW BESS (2)

Storage Storage (Duration 1h) KIWI POWER LTD Existing Generating CMU Cleveland TS13
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Coity Road, Bridgend, CF31 1NN (1 component)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 1h) POWER INITIATIVES LIMITED New Build Generating CMU Bridgend Rejected CF31
Active • 2025-26 (T-4)
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 1h) PIVOTED POWER LLP New Build Generating CMU Pivot Power 1 OX44
Inactive • 2021-22 (T-1)
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (7 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Storage (Duration 1h) Storage (Duration 9h) PIVOTED POWER LLP Existing Generating CMU Pivot Power 1 Pivot Power 1 +4 more OX44
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Craigton Interchange, Linburn, Bishopton, Renfrewshire, Scotland, PA7 5NT, United Kingdom (3 components)

30MW/30MWh one hour battery (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.49 MW
Crossways, Greenhithe, DA9 9BB (3 components)
• A Battery Energy Storage System. (2)
• 7 x 1.2 mw Battery Storage units to be installed on designated land at Crossways
Storage (Duration 1h) ARL 002 Limited New Build Generating CMU Cotton Lane Not Prequalified DA9
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Dairy Lane Westhamnett Chichester PO20 2BG (7 components)

4MW battery co-located with a solar farm (3)

Storage (Duration 1h) E.ON UK PLC Existing Generating CMU NPCM-13 NPCM-13 +4 more PO20
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.10 MW
Danks Wy, Golds Hill, West Bromwich, Tipton, DY4 7BT (1 component)

99.4MW / 99.4MWh BESS

Storage (Duration 1h) OCKER HILL BESS LIMITED New Build Generating CMU OCKER HILL DY4
Active • 2026-27 (T-4)
11.74 MW
Darrington Landfill Site, Darrington Leys, Cridling Stubbs, Knottingley, West Yorkshire, WF11 0AH (2 components)

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Darrington Storage Darrington Storage Not Prequalified WF11
Active • 2025-26 (T-4)
Derehams Lane, Loudwater, High Wycombe, HP10 9RW (1 component)

40 MW/40MWh BESS located on an existing farm in Buckinghamshire, England

Storage (Duration 1h) LOUDWATER BESS LIMITED New Build Generating CMU LOUDWATER HP10
Active • 2025-26 (T-4)
Dersalloch Windfarm, Ayr, KA6 7JJ (1 component)

1 x 30MW Lithium-ion battery with duration of 1 hour

Active • 2026-27 (T-4)
3.54 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (60 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Doncaster Power 16MW Ltd, Balby Carr Bank, J3 Business Park, Doncaster, DN4 8DE (1 component)

Battery Storage system with a duration of 1 hour

Storage (Duration 1h) DONCASTER POWER 16MW LIMITED New Build Generating CMU Not Prequalified DN4
Active • 2027-28 (T-4)
1.24 MW
Dougliehill WWTW, Port Glasgow, Inverclyde, PA15 2PB (1 component)

49MW/49MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU DOUGLIEHILL Not Prequalified PA15
Active • 2026-27 (T-4)
5.79 MW
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (5 components)

Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS4 Ancala (2B) +1 more CV37
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Duncombe Road, Girlington, Bradford, BD8 9AL (2 components)

New build one-hour duration storage to replace diesel plant (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
1.18 MW
East to Sundon NG Substation Chalton Luton LU4 9UQ (1 component)

30.000 MW standalone battery energy storage project

Active • 2026-27 (T-4)
3.54 MW
Faraday Road, Plymouth, PL4 0SR (2 components)

New build one-hour duration storage to replace diesel plant (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
1.89 MW
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RA (1 component)

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).

Storage (Duration 1h) CAPBAL (BRACO) LIMITED New Build Generating CMU BRAC24 FK15
Active • 2027-28 (T-4)
0.77 MW
Feddal Battery Storage System, Feddal Estate, Dunblane, FK15 9RD (1 component)

9.999MW/9.999MWh greenfield BESS located approximately 3km West of Braco village, Dunblane, Scotland

Active • 2025-26 (T-4)
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (10 components)

Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 AGABS4 +2 more PR2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.40 MW
Ferrymuir Farm, Cupar, KY15 5RW (3 components)

49.900MW one-hour duration battery energy storage facility. (3)

Storage (Duration 1h) GSES 1 LIMITED New Build Generating CMU Ferrymuir Ferrymuir +1 more KY15
Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.94 MW