Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

232 unique locations (1971 components) - Page 3 of 10

Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RA (5 components)

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).

Active • 2024-25 (T-1), 2025-26 (T-1) ...
8.25 MW
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (7 components)
• 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD
• Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Inactive •
Ferrymuir Farm, Cupar, KY15 5RW (4 components)

49.900MW one-hour duration battery energy storage facility.

Inactive •
Field At Grid Reference 504139 456454, Back Lane, Skerne, East Riding Of Yorkshire, YO25 8NQ (Address in planning application) Land Adjacent Driffield Supply Point, Wansford Road, Driffield (Address of grid connection) (1 component)

CMU is a 32MW 32MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV system and shares a grid connection. The solar PV and the …

Inactive •
FORDTOWN ENERGY STORAGE, KINTORE, INVERURIE, AB51 0XJ (5 components)

49.99MW Lithium-ion Energy Storage System

Inactive •
Forest Lane, Alne, York, YO61 1TU (1 component)

1x 2.000MW 1 hour Energy Storage System

Inactive •
Gateshead Electric Forecourt Park Road Felling by-pass Gateshead NE10 0EA (5 components)

6.000MW Battery Energy Storage System to be installed at Gateshead Electric Forecourt

Inactive •
Gateway Crescent, Oldham Broadway Park, Oldham, Lancashire OL9 9XB (4 components)

The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system …

Inactive •
Gatwick Electric Forecourt Buckingham Gate Gatwick RH6 0NT (13 components)

A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt

Active • 2022-23 (T-1), 2023-24 (T-1) ...
7.93 MW
Gipsy Lane, A664, Rochdale, OL11 3AE (4 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for 18mw which is split between CMUs - further detail in covering letter
• 8 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for 18mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System
Inactive •
Gipsy Lane, A664, Rochdale, OL11 3HA (8 components)

A Battery Energy Storage System

Inactive •
Goosehall Farm, Factory Road, Burwell, CB25 0BN (5 components)

A 5MW/5MWh Storage: minimum 1.0 hour duration battery facility sharing an existing connection with an existing solar farm but electrically separate with its own independent Import and Export metering system …

Inactive •
Great Field Lane, Somerden Road, Hull, HU9 5QJ (1 component)

New build one-hour duration storage to replace diesel plant

Inactive •
Greenfield Road, Westoning, Bedford, MK45 5JD (10 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System.
Inactive •
Green Ln, Thurcroft, Wickersley, Rotherham, UK, S66 9JD (18 components)
• A new Build Generating Storage CMU
• Existing Generating Storage CMU
Inactive •
Heatherywood Road, Kirkcaldy KY1 3NW (5 components)

1hr duration battery storage project.

Inactive •
Heatherywood Road, Kirkcaldy, KY1 3NW (1 component)

1hr Duration battery storage project.

Inactive •
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (4 components)

Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU …

Active • 2026-27 (T-4), 2027-28 (T-4) ...
0.20 MW
High Flatworth, North Shields, Tyne and Wear, NE29 7SW (4 components)

New build one-hour duration storage to replace diesel plant

Inactive •
Loading map...
Showing 25 locations