Storage (Duration 1h)
90 unique locations (277 components) - Page 3 of 4
Land south of Halesfield 13, Telford, TF7 4PL (2 components)
5MW of Lithium Ion battery storage and power conversion systems. (2)
Land South of Main Road, Bilton, Hull, HU11 4DZ (1 component)
New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details.
Land South of Main Road, Bilton, Hull, HU11 4DZ (1 component)
New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details.
Land south of Westerton Road, Keith Moray, Scotland AB55 5NR (1 component)
Battery Storage
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (6 components)
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (3)
Land to the North of Bransholme Rd, Hull HU7 4YP, UK (2 components)
Land to the North of Great Wheatley Road, Rayleigh, SS6 7AR (3 components)
The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each. (3)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)
The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)
The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (2 components)
The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (3 components)
The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each. (3)
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET (1 component)
Frequency response 60 minute Battery Storage
Lascar Works, Tanpits Road, Bury BL9 5BY (1 component)
20.000 MW of battery storage located at Lascar Works
Leighton Hall Farm, Middlewich Road, Leighton, Crewe, CW1 4QH (2 components)
10 x 2MW/2MWh containerised Energy Storage System Units to be installed on designated land at Leighton Hall Farm. (2)
Low Dyke, Calthwaite, Penrith, CA11 9PS (4 components)
The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters (3)
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (4 components)
7 MW of Battery Storage located at Grantham. (3)
Milton Court Farm, Dorking, RH4 3LY (5 components)
Netherlands Way, Kiln Lane Industrial Estate, Starlingborough, UK, DN41 8DF (2 components)
NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (5 components)
Nunhide Lane Theale Berkshire RG31 7SD (3 components)
A new power plant, with associated civil works, switchgear and electrical connection. (3)
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (4 components)
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (6 components)
A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (3)
Perseverance Road, Hereford, UK, HR4 9SE (1 component)
A 8MW New Build Battery Storage Site
Petts Wood, Eynsford Close, Orpington, BR5 1DP (3 components)
Plot C Land at Severn Road Avonmouth BS10 7SE (4 components)
The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. … (2)