Storage (Duration 1h)

227 unique locations (962 components) - Page 3 of 10

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (4 components)
• 0.500MW Battery Energy Storage System (2)
• 0.5MW of demand reduction
DSR Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU BAT002 NG2
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Potman's Lane, Battle, TN33 9BL (5 components)
• A Battery Energy Storage System (2)
• A Battery Energy Storage System, which has already PQ'd as POTM25
Storage (Duration 1h) Storage (Duration 1.5h) BRK 002 LIMITED BRK 002 LIMITED New Build Generating CMU Potmans Lane Potmans Lane +3 more TN33
Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.67 MW
Potash Farm, Nash Road, Beachampton, MK19 6EA (6 components)

49.900MW one-hour duration battery energy storage facility. (3)

Storage (Duration 1h) GSES 1 LIMITED New Build Generating CMU Stony A Stony A +4 more MK19
Active • 2025-26 (T-4), 2024-25 (T-1) ...
23.92 MW
Plot, Pengarnodu Est, Methyr Tydfil, CF48 2YE (2 components)

New build one-hour duration storage to replace diesel plant (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
1.42 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
• A New Build battery energy storage system. (2)
• An existing battery energy storage system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
42.89 MW
Plot B at Severn Road Avonmouth BS10 7SE (3 components)
• 15.000MW of Battery Energy Storage Systems
• 15MW of Battery Energy Storage Systems
• The CMU will be formed of multiple individual Batteries. This site is to include a 17MW Battery Energy Storage System (BESS) that can either operate as import or export at will. The 17MW connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Plot B at Severn Road Avonmouth BS10 7SE (4 components)
• 15.000MW of Battery Energy Storage Systems
• Existing Generator Battery Energy Storage System
• New Build Battery Energy Storage Systems
Storage (Duration 1h) Hallen Energy Ltd Existing Generating CMU New Build Generating CMU NB_308 NB_308 BS10
Active • 2025-26 (T-1), 2024-25 (T-1) ...
2.50 MW
Pleasance Road ? Battery, Coupar Site, Pleasance Road, Blairgowrie, PH13 9JB (5 components)

Battery storage plant (3)

Storage (Duration 1h) Storage (Duration 2h) COUPAR LIMITED New Build Generating CMU Coupar 20MW 2 hour BESS Coupar 21MW 2 hour BESS +3 more PH13
Active • 2025-26 (T-4), 2024-25 (T-1) ...
15.04 MW
Philip Street Car Breakers, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components)

New Build CMU comprising of battery storage and associated plant (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.69 MW
Parcel Of Land Within Norwich Road Industrial Estate West Of Halesworth Business Centre , Norwich Road, Halesworth, Suffolk, IP19 8QJ (4 components)

50MW Lithium-ion Energy Storage System (3)

Storage (Duration 1h) SUSI EELPOWER HALESWORTH LIMITED New Build Generating CMU HALE22 HALE22 +1 more IP19
Active • 2026-27 (T-4), 2025-26 (T-4) ...
19.69 MW
Ordsall Lane, Ordsall, Salford Quays, Salford, M5 3NB (2 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) WESSEX ENERGY STORAGE LTD New Build Generating CMU Not Prequalified M5
Active • 2025-26 (T-4)
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (3 components)
• This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS). (2)
• This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
Active • 2027-28 (T-4), 2025-26 (T-1) ...
4.51 MW
Orchardbank 1 Limited Battery Storage Site, Orchard Loan, Oilfield Machinery Ltd, Orchard Bank Industrial Estate, Forfar, DD8 1TD (1 component)

9.999MW/9.999MWh BESS located to the rear of Dean Park Orchard Loan in Orchardbank Industrial Estate

Storage (Duration 1h) EKU ENERGY PROJECTS (UK) LIMITED New Build Generating CMU ORCHARD BANK DD8
Active • 2025-26 (T-4)
Old Church Lane, Mountnessing, Hutton, Brentwood, Essex, England, CM13 1UN, United Kingdom (4 components)
• 50MW/50MWh one hour battery (2)
• 50MW/50MWh one hour battery storage
Active • 2026-27 (T-4), 2025-26 (T-1) ...
27.52 MW
Off Luss Road, Helensburgh, G84 9EQ (1 component)

39.9MW/39.9MWh greenfield BESS located on land north east of Blackhill Amenity Site, just off Luss Road in Helensburgh

Storage (Duration 1h) EKU ENERGY PROJECTS (UK) LIMITED New Build Generating CMU HELENSBURGH G84
Active • 2025-26 (T-4)
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (5 components)
• A 40MW New Build Battery Storage site (2)
• A 45MWh New Build Battery Storage site
Storage (Duration 1h) Storage (Duration 1.5h) STAIRFOOT GENERATION LTD New Build Generating CMU Stairfoot 1 Stairfoot 1 +3 more S71
Active • 2025-26 (T-4), 2024-25 (T-1) ...
10.78 MW
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (2 components)

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt (2)

Storage (Duration 1h) NORWICH EAST ELECTRIC FORECOURT LTD New Build Generating CMU Norwich East Electric Forecourt Norwich East Electric Forecourt NR13
Active • 2026-27 (T-4), 2024-25 (T-1)
1.37 MW
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (4 components)

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt (3)

Storage (Duration 1h) NORWICH EAST ELECTRIC FORECOURT LTD New Build Generating CMU Norwich East Electric Forecourt Norwich East Electric Forecourt +2 more NR13
Active • 2025-26 (T-1), 2024-25 (T-1) ...
2.57 MW
North Tawton, Sampford Courtenay, West Devon, Devon, England, EX20 2DA, United Kingdom (3 components)

30MW/30MWh one hour battery (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.49 MW
Northmead Lane, Iron Acton, Rangeworthy, BS37 7LT (6 components)
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2026-27 (T-4), 2025-26 (T-4)
6.29 MW
Norrington Gate Farm, Norrington Gate, Broughton Gifford, Melksham, SN12 8LW (3 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 004 LIMITED New Build Generating CMU Norrington Gate Farm Norrington Gate Farm +1 more Rejected SN12
Active • 2026-27 (T-4)
79.82 MW
Newlands Farm, Tanners Lane, Fareham, PO14 2HT (5 components)
• 10MW Storage
• 15MW of Battery Energy Storage Systems
• 20MW of Battery Energy Storage Systems
DSR Storage (Duration 1h) FAREHAM ENERGY RESERVE 2 LIMITED LIMEJUMP LTD Unproven DSR CMU New Build Generating CMU FAR226 PO14
Active • 2025-26 (T-4), 2024-25 (T-1) ...
5.42 MW
Newchurch Road, Bacup, Lancashire, OL13 0BL (4 components)

Battery Storage (3)

Storage (Duration 1h) BOOM BACUP STORAGE LIMITED New Build Generating CMU BACUP STORAGE BACUP STORAGE OL13
Active • 2026-27 (T-4), 2025-26 (T-1) ...
4.43 MW
Near Clayfords Farm Strichen Buchan Aberdeenshire AB43 6RH (1 component)

30.000MW standalone battery energy storage project.

Active • 2026-27 (T-4)
3.54 MW
Near 10 Granny Barbours Road Nairn IV12 5HX (1 component)

30.000 MW standalone BESS

Active • 2026-27 (T-4)
3.54 MW
Loading map...
Showing 25 locations