Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

218 unique locations (1932 components) - Page 4 of 9

J3 Business Park Balby Carr End Doncaster DN4 8DE (8 components)
• 10 MW Storage facility
• 10 MW Storage facility located at Balby, Doncaster.
Inactive •
Johnson Street, Leigh, M46 0RB (5 components)

A Battery Energy Storage System

Inactive •
Junction 3 Business Park, Balby carr bank, Doncaster DN4 8DE (13 components)

10MW of Battery Energy Storage Systems to be built. (3)

Inactive •
Land Adjacent to Electricity Sub Station, Stonehill, Charlton, Malmesbury, Wiltshire, SN16 9DX (16 components)
• 49.900MW Battery Energy Storage System
• 49.9MW Battery Energy Storage System located in Malmesbury, Wiltshire
Inactive •
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (7 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive •
Land adjacent to electricity sub station, Stonehill, Charlton, Wiltshire, SN16 9RP (18 components)
• Battery Energy Storage System located at Minety
• Battery Energy Storge System located at Minety, providing Capacity Market alongside other grid and power services.
Inactive •
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (24 components)
• New build battery storage unit
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection
• battery storage unit
Active • 2023-24 (T-1), 2023-24 (T-4) ...
15.21 MW
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (18 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive •
Land Adj To Electricity Sub Station Hiillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (6 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive •
Land Adj To Electricity Sub Station Hillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (4 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive •
land adj West Melton Electricity substation Elsecar Road Brampton Bierlow, S63 6AG (6 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive •
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ (19 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive •
Land at Boscar Grange Farm, Thirsk Road, Easingwold, York, YO61 3NQ (6 components)
• A 20MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
• A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
Inactive •
Land at Burnley Road Simonstone BB12 7ND (16 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive •
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (19 components)

CMU comprising of battery storage and associated plant

Active • 2024-25 (T-1), 2025-26 (T-4) ...
50.46 MW
Land at Hall Farm, Northwold, Thetford, IP26 5LQ (6 components)

7.5MW, 1-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with.

Active • 2025-26 (T-1), 2028-29 (T-4)
3.62 MW
Land at Sterte Avenue West, Poole, BH15 2AL (24 components)
• A 7 MW Battery Energy Storage System
• A 7.5MW Tesla Battery Energy Storage System
• A 7MW Battery Energy Storage System
Inactive •
Land at Thames Water Treatment Works, Amersham Road, Denham SL9 7AW (5 components)
• CMU ID 22GER1, a new build battery storage CMU
• CMU ID 23GER1, a new build battery storage CMU
• Existing generating storage battery asset with CMU ID 24GER1
Inactive •
Loading map...
Showing 25 locations