Storage (Duration 1h)

334 unique locations (1426 components) - Page 4 of 14

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Plot C Land at Severn Road Avonmouth BS10 7SE (4 components)

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. …

Storage (Duration 1h) Voltalia UK Ltd New Build Generating CMU Severn Road Severn Road 5 +2 more BS10
Inactive • 2023-24 (T-4), 2022-23 (T-4)
11.59 MW
Plot B at Severn Road, Avonmouth, BS10 7SE (10 components)
• 15.000MW of Battery Energy Storage Systems
• 15MW of Battery Energy Storage Systems
• Existing Generator Battery Energy Storage System
Active • 2025-26 (T-4), 2025-26 (T-1) ...
24.40 MW
Plot B at Severn Road Avonmouth BS10 7SE (4 components)
• 15.000MW of Battery Energy Storage Systems
• Existing Generator Battery Energy Storage System
• New Build Battery Energy Storage Systems
Storage (Duration 1h) Hallen Energy Ltd Existing Generating CMU New Build Generating CMU NB_308 NB_308 BS10
Active • 2025-26 (T-1), 2024-25 (T-1) ...
2.50 MW
Pleasance Road ? Battery, Coupar Site, Pleasance Road, Blairgowrie, PH13 9JB (5 components)

Battery storage plant

Storage (Duration 1h) Storage (Duration 2h) COUPAR LIMITED New Build Generating CMU Coupar 20MW 2 hour BESS Coupar 21MW 2 hour BESS +3 more PH13
Active • 2025-26 (T-4), 2024-25 (T-1) ...
33.51 MW
Philip Street Car Breakers, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components)

New Build CMU comprising of battery storage and associated plant

Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.55 MW
Petts Wood, Eynsford Close, Orpington, BR5 1DP (3 components)
• 7 x 1mw Battery Storage units to be installed on designated land at Petts Wood
• A Battery Energy Storage System
Storage (Duration 1h) ARL 016 LIMITED New Build Generating CMU Eynsford Close Conditional BR5
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
3.80 MW
Perseverance Road, Hereford, UK, HR4 9SE (1 component)

A 8MW New Build Battery Storage Site

Storage (Duration 1h) Noriker Perseverance Ltd New Build Generating CMU Noriker Perseverance 1 Conditional HR4
Inactive • 2022-23 (T-4)
2.35 MW
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (6 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling.

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
8.75 MW
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (6 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (3)

Storage Storage (Duration 1h) Storage (Duration 0.5h) VATTENFALL WIND POWER LTD Existing Generating CMU Battery@PyC Battery@PyC +1 more CF42
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1.30 MW
Parcel Of Land Within Norwich Road Industrial Estate West Of Halesworth Business Centre , Norwich Road, Halesworth, Suffolk, IP19 8QJ (4 components)

50MW Lithium-ion Energy Storage System (3)

Storage (Duration 1h) SUSI EELPOWER HALESWORTH LIMITED New Build Generating CMU HALE22 HALE22 +1 more IP19
Active • 2026-27 (T-4), 2025-26 (T-4) ...
19.69 MW
Ordsall Lane, Ordsall, Salford Quays, Salford, M5 3NB (2 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) WESSEX ENERGY STORAGE LTD New Build Generating CMU Not Prequalified M5
Active • 2025-26 (T-4)
2.99 MW
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (3 components)
• This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
• This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
Active • 2027-28 (T-4), 2025-26 (T-1) ...
4.51 MW
Orchardbank 1 Limited Battery Storage Site, Orchard Loan, Oilfield Machinery Ltd, Orchard Bank Industrial Estate, Forfar, DD8 1TD (1 component)

9.999MW/9.999MWh BESS located to the rear of Dean Park Orchard Loan in Orchardbank Industrial Estate

Storage (Duration 1h) EKU ENERGY PROJECTS (UK) LIMITED New Build Generating CMU ORCHARD BANK DD8
Active • 2025-26 (T-4)
2.00 MW
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (4 components)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network in WPD's West Midland region.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network in WPD's West Midland region.
Storage Storage (Duration 1h) Ecotricity Generation Limited New Build Generating CMU Alveston Battery Storage Alveston Battery Storage Conditional BS37
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
6.78 MW
Old Church Lane, Mountnessing, Hutton, Brentwood, Essex, England, CM13 1UN, United Kingdom (4 components)
• 50MW/50MWh one hour battery
• 50MW/50MWh one hour battery storage
Active • 2026-27 (T-4), 2025-26 (T-1) ...
27.52 MW
Off Luss Road, Helensburgh, G84 9EQ (1 component)

39.9MW/39.9MWh greenfield BESS located on land north east of Blackhill Amenity Site, just off Luss Road in Helensburgh

Storage (Duration 1h) EKU ENERGY PROJECTS (UK) LIMITED New Build Generating CMU HELENSBURGH G84
Active • 2025-26 (T-4)
7.96 MW
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (5 components)
• A 40MW New Build Battery Storage site
• A 45MWh New Build Battery Storage site
Storage (Duration 1h) Storage (Duration 1.5h) STAIRFOOT GENERATION LTD New Build Generating CMU Stairfoot 1 Stairfoot 1 +3 more S71
Active • 2025-26 (T-4), 2024-25 (T-4) ...
39.72 MW
Nunhide Lane, Theale, Berkshire, RG31 7SD (3 components)

A new power plant, with associated civil works, switchgear and electrical connection.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
32.00 MW
NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (5 components)
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export capacity of 40MW.
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of 40 MVA and export capacity of 40 MW.
Storage Storage (Duration 1h) RNA-Energy Ltd New Build Generating CMU Halesworth Battery Storage Facility Halesworth Battery Storage Facility +1 more Conditional IP19
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
35.66 MW
Norwich East Electric Forecourt, Broadland Gate, Norwich, NR13 5HB (6 components)

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt

Active • 2026-27 (T-4), 2025-26 (T-1) ...
5.49 MW
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (4 components)

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt (3)

Storage (Duration 1h) NORWICH EAST ELECTRIC FORECOURT LTD New Build Generating CMU Norwich East Electric Forecourt Norwich East Electric Forecourt +2 more NR13
Active • 2025-26 (T-1), 2024-25 (T-1) ...
2.57 MW
18.49 MW
Northmead Lane, Iron Acton, Rangeworthy, BS37 7LT (6 components)
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2026-27 (T-4), 2025-26 (T-4)
11.60 MW
Norrington Gate Farm, Norrington Gate, Broughton Gifford, Melksham, SN12 8LW (3 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 004 LIMITED New Build Generating CMU Norrington Gate Farm Norrington Gate Farm +1 more Rejected SN12
Active • 2026-27 (T-4)
79.82 MW