Storage (Duration 1h)

90 unique locations (277 components) - Page 4 of 4

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
Cleveland Potash ICL UK Boulby Mine Loftus Saltburn TS13 4UZ (2 components)

6MW BESS (2)

Storage Storage (Duration 1h) KIWI POWER LTD Existing Generating CMU Cleveland TS13
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Clayhill Farm, Greenfield Rd, Westoning, Bedford, MK45 5JD (near MK45 5AD) (1 component)

44MW Storage consisting of 11 x 4MW units

Storage (Duration 1h) ENEL X UK LIMITED Existing Generating CMU MK45
Inactive • 2021-22 (T-4)
Church Bottom, Salisbury, SP4 6NN (3 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• 20 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
Storage (Duration 1h) ARL 008 Limited New Build Generating CMU Conditional SP4
Inactive • 2022-23 (T-4)
Chickerell substation, Weymouth, Dorset, DT4 9WW (1 component)

49.9MW Lithium Ion Batteries and power conversion system installed in a compound at Chickerell Substation.

Storage (Duration 1h) IQ ENERGY CENTRE LIMITED New Build Generating CMU Not Prequalified DT4
Inactive • 2023-24 (T-4)
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (3 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
DSR Storage Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU KnotKirkThry WF11
Inactive • 2021-22 (T-1), 2019-20 (T-1) ...
Brinksway, Stockport, SK3 0BY (2 components)

A Battery Energy Storage System (2)

Storage (Duration 1h) AVE 011 Limited New Build Generating CMU Brinksway Not Prequalified SK3
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Breck Road, Wallasey, Liverpool (2 components) Geocoding Needed

The Burbo Bank battery is a 2MW/2MWh Battery located near the Burbo Bank offshore wind farm, and near Scottish Power Energy Network's Wallasey substation. (2)

Storage Storage (Duration 1h) ORSTED BURBO (UK) LIMITED New Build Generating CMU Burbo Battery Burbo Battery
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Boundary Street, Wigan WN1 3AP (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

Storage Storage (Duration 1h) SIGBAT D LIMITED New Build Generating CMU UKER31 UKER33 +2 more Not Prequalified WN1
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Bolney Substation, Wineham Lane, Bolney, Haywards Heath, BN5 9AW (1 component)

49.9mw Lithium Ion batteries and power conversion system on a compound at Bolney Substation

Storage (Duration 1h) IQ ENERGY CENTRE LIMITED New Build Generating CMU Not Prequalified BN5
Inactive • 2023-24 (T-4)
Battery Storage, Keel Drive, Slough, SL1 2YA (4 components)
• A 20MW New Build Battery Storage site (2)
• A 29.5MW New Build Battery Storage site
Storage (Duration 1h) EQUINOR BLANDFORD ROAD LIMITED New Build Generating CMU Keel Drive 1 Keel Drive 1 Not Prequalified SL1
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (5 components)

Battery Energy Storage System (3)

Storage (Duration 1h) LIMEJUMP LTD New Build Generating CMU KPB004 Not Prequalified TA4
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Ardochrig Substation, off Ardochrig Road, Whitelee Windfarm, South Lanarkshire, G75 0QN (4 components)
• 1 x 50MW Lithium-ion batteryw with duration of 1 hour (2)
• 1 x 50MW Lithium-ion battery with duration of 1 hour
Storage (Duration 1h) SCOTTISHPOWER RENEWABLES (UK) LIMITED New Build Generating CMU Whitelee Battery Whitelee Battery +1 more G75
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Altcar Training Camp Grange Road Ince Blundell, L38 7JE (2 components)

Battery Energy Storage System (2)

Storage (Duration 1h) KIWI POWER LTD New Build Generating CMU Rejected L38
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Albion Road, Dartford, Kent, UK, DA1 5PZ (6 components)
• A 2.5MW New Build Battery Storage System (2)
• A New Build 2.5MW Generation Battery Site
Storage (Duration 1h) HC ESS2 LIMITED New Build Generating CMU Littlebrook C Littlebrook C Not Prequalified DA1
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
19 Howard Road, Park Farm Industrial Estate, Redditch, Worcestershire, B98 7SE (2 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have an import capacity of 4000kVa and an export capacity … (2)

Storage (Duration 1h) RNK Holding Ltd New Build Generating CMU Ipsley Battery Storage Facility Not Prequalified B98
Inactive • 2023-24 (T-4), 2022-23 (T-3)
Loading map...
Showing 15 locations