Storage (Duration 1h)

334 unique locations (1426 components) - Page 5 of 14

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Newlands Farm, Tanners Lane, Fareham, PO14 2HT (5 components)
• 10MW Storage
• 15MW of Battery Energy Storage Systems
• 20MW of Battery Energy Storage Systems
DSR Storage (Duration 1h) FAREHAM ENERGY RESERVE 2 LIMITED LIMEJUMP LTD Unproven DSR CMU New Build Generating CMU FAR226 PO14
Active • 2025-26 (T-4), 2024-25 (T-1) ...
17.26 MW
Newchurch Road, Bacup, Lancashire, OL13 0BL (4 components)

Battery Storage

Storage (Duration 1h) BOOM BACUP STORAGE LIMITED New Build Generating CMU BACUP STORAGE BACUP STORAGE OL13
Active • 2026-27 (T-4), 2025-26 (T-1) ...
4.43 MW
Netherlands Way, Kiln Lane Industrial Estate, Starlingborough, UK, DN41 8DF (2 components)
• A 20MW New Build Battery Storage Site
• A 40MW New Build Battery Storage Site
Storage (Duration 1h) HC ESS8 Limited New Build Generating CMU Immingham 1 Immingham 2 Conditional DN41
Inactive • 2022-23 (T-4)
17.64 MW
3.54 MW
Near Clayfords Farm Strichen Buchan Aberdeenshire AB43 6RH (1 component)

30.000MW standalone battery energy storage project.

Active • 2026-27 (T-4)
3.54 MW
Near 10 Granny Barbours Road Nairn IV12 5HX (1 component)

30.000 MW standalone BESS

Active • 2026-27 (T-4)
3.54 MW
Milton Court Farm, Dorking, RH4 3LY (5 components)
• 5MW battery energy storage facility at Milton Court Farm, Dorking
• 6MW battery energy storage facility at Milton Court Farm, Dorking
Storage Battery Storage Storage (Duration 1h) GBSL DORKING LIMITED New Build Generating CMU GBSL Dorking GBSL Dorking +1 more RH4
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
9.17 MW
Millstream, Maidenhead Road, Windsor, SL45GD (2 components)

Battery storage unit (2)

Active • 2024-25 (T-4), 2021-22 (T-1)
Mill Farm, Caythorpe, Heath Ln, Grantham, NG32 3ER (13 components)
• 7 MW of Battery Storage loacated at Grantham.
• 7 MW of Battery Storage located at Grantham.
• Battery Storage located at Grantham.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.33 MW
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (4 components)

7 MW of Battery Storage located at Grantham. (3)

Storage Storage (Duration 1h) Limejump Virtual 1 Limited Existing Generating CMU Mill Farm MillFarm1 +2 more NG32
Inactive • 2021-22 (T-1), 2020-21 (T-1) ...
Middleton Road, Middleton, Lancashire, Near LA3 2SD (1 component)

49.900 Storage unit

Storage (Duration 1h) LANCASTER POWER LIMITED New Build Generating CMU Not Prequalified LA3
Active • 2024-25 (T-4)
Meadowcroft Farm, Gretton Fields, Gretton, GL54 5HJ (5 components)

The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 …

Storage Storage (Duration 1h) GHEB2 C1 Limited New Build Generating CMU Meadowcroft Farm Meadowcroft Farm +1 more Not Prequalified GL54
Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.19 MW
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (4 components)
• New build one-hour duration storage to replace diesel plant
• New build two-hour duration storage to replace diesel plant
Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.97 MW
Maidenhead Road, Windsor, SL4 5GD (8 components)
• Battery Storage
• Battery storage
• Battery strorage unit
Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.57 MW
Maes Mawr Farm, Pound Farm Lane, Llantwit Fardre, Tonteg, CF38 1SU (6 components)
• New build 1.5 hour duration battery storage
• New build one-hour duration storage
Active • 2026-27 (T-4), 2025-26 (T-4)
9.06 MW
Lower Dunton Road, Upminster, RM14 3TD (1 component)

New battery storage project

Storage (Duration 1h) BASILDON BESS LIMITED New Build Generating CMU KILWINNING RM14
Active • 2025-26 (T-4)
4.79 MW
Low Dyke, Calthwaite, Penrith, CA11 9PS (4 components)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

Storage Storage (Duration 1h) BALANCE POWER PROJECTS LIMITED New Build Generating CMU LOWDY1 LOWDY1 Conditional CA11
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
5.20 MW
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (8 components)
• 1.200MW of battery storage located at Durham.
• 1.200MW of storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD
• Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 Ancala (2B) +1 more TS22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.02 MW
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG. (6 components)

Battery Storage Plant

Storage (Duration 1h) Storage (Duration 2h) MELKSHAM WEST STORAGE LIMITED New Build Generating CMU Melksham West Storage1 Melksham West Storage1 +3 more SN12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
37.03 MW
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG (6 components)

Battery Storage Plant

Storage (Duration 1h) Storage (Duration 2h) MELKSHAM EAST STORAGE LIMITED New Build Generating CMU Melksham East Storage1 Melksham East Storage1 +3 more SN12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
36.80 MW
Levitt Hagg Landfill Site, Warmsworth, Doncaster, South Yorkshire, DN4 9RS (2 components)

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Levitt Hagg Storage Levitt Hagg Storage Not Prequalified DN4
Active • 2025-26 (T-4)
2.00 MW
Leighton Hall Farm, Middlewich Road, Leighton, Crewe, CW1 4QH (2 components)

10 x 2MW/2MWh containerised Energy Storage System Units to be installed on designated land at Leighton Hall Farm.

Storage (Duration 1h) ENERGY DEMAND & RESPONSE LIMITED New Build Generating CMU Leighton Hall BESS Not Prequalified CW1
Inactive • 2023-24 (T-4), 2022-23 (T-3)
4.05 MW
Loading map...
Showing 25 locations