Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

227 unique locations (962 components) - Page 6 of 10

Active MW: 8174.73 MW
Inactive MW: 278.73 MW
LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR (11 components)

Battery Storage Plant (3)

Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 4h) ENDERBY STORAGE LIMITED ENDERBY STORAGE LIMITED New Build Generating CMU Enderby Storage 019 Enderby Storage 042 +6 more LE19
Active • 2025-26 (T-4), 2024-25 (T-1) ...
18.76 MW
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (6 components)

Battery Storage Plant (3)

Storage (Duration 1h) Storage (Duration 2h) WEST DIDSBURY STORAGE LIMITED New Build Generating CMU West Didsbury Storage West Didsbury Storage +3 more M33
Active • 2025-26 (T-4), 2024-25 (T-1) ...
18.98 MW
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (Nearest postcode to grid reference: M33 2JT). (5 components)

Battery Storage Plant (3)

Storage Storage (Duration 1h) Storage (Duration 2h) WEST DIDSBURY STORAGE LIMITED WEST DIDSBURY STORAGE LIMITED New Build Generating CMU West Didsbury Storage West Didsbury Storage 017 +1 more M33
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land South of National Grid Electricity Substation, Capenhurst Lane, Capenhurst, Chester, CH66 2HD (4 components)

Standalone Battery Storage Asset (3)

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) NATIVE RIVER LTD New Build Generating CMU Native River Native River +1 more CH66
Active • 2026-27 (T-4), 2025-26 (T-1) ...
38.53 MW
Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE (16 components)

4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs (3)

Storage (Duration 1h) Zenobe Capenhurst Limited New Build Generating CMU Capenhurst Capenhurst +1 more CH1
Active • 2025-26 (T-4), 2024-25 (T-1) ...
29.94 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (5 components)
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Storage (Duration 1h) Storage (Duration 9h) PIVOTED POWER LLP Existing Generating CMU Pivot Power 1 Pivot Power 1 +3 more ME10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.22 MW
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (4 components)

Battery Project on Greenfield Site (3)

Storage (Duration 1h) Storage (Duration 1.5h) SIZING JOHN LIMITED New Build Generating CMU Sizing John Sizing John +2 more WA9
Active • 2027-28 (T-4), 2026-27 (T-4) ...
41.74 MW
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (13 components)
• 17.315 MW installed capacity Battery Storage facility (2)
• 17.615 MW installed capacity Battery Storage facility
DSR Storage (Duration 1h) SUSI EELPOWER ROCK FARM LIMITED Existing Generating CMU ROCK18 ROCK18 +7 more SY8
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.33 MW
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) EQUINOR WELKIN MILL LIMITED New Build Generating CMU Welkin Mill 1 Welkin Mill 1 +5 more SK6
Active • 2025-26 (T-4), 2024-25 (T-1) ...
18.93 MW
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET NEAREST (4 components)

Battery storage 40.000MW/40.000MWh one duration battery new build (3)

Storage (Duration 1h) CARE POWER (BARNSLEY) LIMITED New Build Generating CMU BARNB1 S70
Active • 2025-26 (T-4), 2024-25 (T-1) ...
11.87 MW
Land West Of Mossbank Cottages, Drumcross, Bathgate, EH48 1JX (4 components)
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. (2)
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; equipment, metering room, SCADA room and 33kV switching room.
Storage (Duration 1h) DRUMCROSS ENERGY STORAGE LIMITED New Build Generating CMU Drumcross Drumcross Energy Storage EH48
Active • 2025-26 (T-4), 2022-23 (T-1) ...
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (6 components)

Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGLAR2 AGLAR2 +1 more HR1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.94 MW
Lascar Works, Tanpits Road, Bury, BL9 5BY (8 components)

Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating … (3)

Storage Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU ADSLS2 ADSLS2 +2 more BL9
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.10 MW
Leafield Battery Site, Monks Lane, Corsham SN13 9PH (4 components)

electricity storage site comprising brand new batteries, inverters and associated connection plant (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
7.09 MW
Lebanon Farm, Lower Dunton Road, Dunton, Brentwood, RM14 3TD (1 component)

40MW/40MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU LEBANON FARM Not Prequalified RM14
Active • 2026-27 (T-4)
4.72 MW
Levitt Hagg Landfill Site, Warmsworth, Doncaster, South Yorkshire, DN4 9RS (2 components)

Battery Storage Station

Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Levitt Hagg Storage Levitt Hagg Storage Not Prequalified DN4
Active • 2025-26 (T-4)
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG (6 components)

Battery Storage Plant (3)

Storage (Duration 1h) Storage (Duration 2h) MELKSHAM EAST STORAGE LIMITED New Build Generating CMU Melksham East Storage1 Melksham East Storage1 +3 more SN12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
18.76 MW
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG. (6 components)

Battery Storage Plant (3)

Storage (Duration 1h) Storage (Duration 2h) MELKSHAM WEST STORAGE LIMITED New Build Generating CMU Melksham West Storage1 Melksham West Storage1 +3 more SN12
Active • 2025-26 (T-4), 2024-25 (T-1) ...
18.98 MW
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (5 components)

Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 Ancala (2B) +1 more TS22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Lower Dunton Road, Upminster, RM14 3TD (1 component)

New battery storage project

Storage (Duration 1h) BASILDON BESS LIMITED New Build Generating CMU KILWINNING RM14
Active • 2025-26 (T-4)
Maes Mawr Farm, Pound Farm Lane, Llantwit Fardre, Tonteg, CF38 1SU (6 components)
• New build 1.5 hour duration battery storage
• New build one-hour duration storage
Active • 2026-27 (T-4), 2025-26 (T-4)
4.27 MW
Maidenhead Road, Windsor, SL4 5GD (8 components)
• Battery storage (2)
• Battery strorage unit
Storage (Duration 1h) CENTRICA BUSINESS SOLUTIONS UK LIMITED Existing Generating CMU JPSBDV Rejected SL4
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (4 components)
• New build one-hour duration storage to replace diesel plant (2)
• New build two-hour duration storage to replace diesel plant
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.62 MW
Meadowcroft Farm, Gretton Fields, Gretton, GL54 5HJ (5 components)

The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 … (3)

Storage Storage (Duration 1h) GHEB2 C1 Limited New Build Generating CMU Meadowcroft Farm Meadowcroft Farm +1 more Not Prequalified GL54
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Middleton Road, Middleton, Lancashire, Near LA3 2SD (1 component)

49.900 Storage unit

Storage (Duration 1h) LANCASTER POWER LIMITED New Build Generating CMU Not Prequalified LA3
Active • 2024-25 (T-4)
Loading map...
Showing 25 locations