Storage (Duration 1h)

240 unique locations (1122 components) - Page 6 of 10

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (3 components)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 8 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 2 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 36 kV Ring Main Unit (RMU) (2)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The solar and the BESS will be registered as separate BMUs. The Electricity Storage Facility will connect to the grid via the 132/33 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 26 containers with Lithium Ion battery modules (LFP), containers are furthermore including HVAC, fire extinguishing system and controls; 13 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU)
Storage (Duration 1h) Storage (Duration 2h) FP LUX SCURF DYKE SOLAR LIMITED New Build Generating CMU Scurf Dyke Solar Limited Scurf Dyke Solar Limited YO25
Active • 2025-26 (T-1), 2024-25 (T-1) ...
12.03 MW
Land next to Capenhurst substation, Ledsham, Ellesmere Port, CH66 2HD (1 component)

49.9MW Battery Storage facility located at Capenhurst GSP

Storage (Duration 1h) Zenobe Capenhurst Limited New Build Generating CMU Capenhurst CH66
Active • 2024-25 (T-4)
12.36 MW
Land East of Maldon Hall Farm, Maldon, Essex CM9 6HD (3 components)

40 MW/40MWh BESS

Storage (Duration 1h) MALDON BESS LIMITED New Build Generating CMU MALDON MALDON +1 more CM9
Active • 2025-26 (T-4), 2024-25 (T-1) ...
19.96 MW
Land at West Road, Trafford Park, M41 7SW (7 components)
• 3 x 2MW gas gen sets
• 8 x 2MW gas gen sets at West Road
• Battery Storage Station
Storage (Duration 1h) Storage (Duration 1.5h) ALKANE ENERGY UK LIMITED New Build Generating CMU Taylor Road Storage Taylor Road Storage +2 more M41
Active • 2026-27 (T-4), 2025-26 (T-4) ...
36.82 MW
Land at Weirs Drove, Cambridge, CB25 0BP (5 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.900MW each.
Storage (Duration 1h) CARE POWER (BURWELL 1) LIMITED New Build Generating CMU BURWB1 Burwell Battery Storage Facility CB25
Active • 2025-26 (T-4), 2024-25 (T-1) ...
36.65 MW
Land at Traston Road, Newport, NP19 4PW (1 component)

Grid-scale energy storage system based on Lithium Ion, capable of exporting 20MW for a 1 hour duration installed on designated land within a compound at Newport

Storage (Duration 1h) EL ASSET CO. 1 LIMITED New Build Generating CMU Newport Not Prequalified NP19
Active • 2025-26 (T-4)
3.99 MW
Land at Tollgate Farm, Welham Green, Hertfordshire, AL4 0NY (4 components)

The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.

Storage (Duration 1h) TOLLGATE ENERGY STORAGE LIMITED New Build Generating CMU TOL001 TOL001 AL4
Active • 2026-27 (T-4), 2025-26 (T-4) ...
24.14 MW
Land at Thames Water Treatment Works, Amersham Road, Denham SL9 7AW (4 components)
• CMU ID 22GER4, a new build battery storage CMU
• CMU ID 23GER1, a new build battery storage CMU
• Existing generating storage battery asset with CMU ID 24GER1
Storage (Duration 1h) FIELD GERRARDS CROSS LTD New Build Generating CMU Field Gerrards Cross Field Gerrards Cross +2 more SL9
Active • 2026-27 (T-4), 2025-26 (T-1) ...
9.65 MW
Land at Sterte Avenue West, Poole, BH15 2AL (12 components)
• A 7.5MW Tesla Battery Energy Storage System
• A 7MW Battery Energy Storage System
• Tesla Battery Energy Storage System
Storage Storage (Duration 1h) Storage (Duration 2h) HARMONY HB LIMITED Existing Generating CMU HOLES BAY HOLESBAY +4 more BH15
Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.69 MW
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (5 components)
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated land within a compound at Westhoughton
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Storage (Duration 1h) Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Bolton0077 Bolton0078 +3 more Not Prequalified BL5
Active • 2027-28 (T-4), 2026-27 (T-4) ...
20.00 MW
Land at Rhyd y Groes, Rhosgoch, Anglesey, Wales, LL66 0AT (7 components)
• 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales.
• 1 x 49.99 MW distribution connected photovoltaic plant located on agricultural land on the island of Anglesey, north Wales.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
52.32 MW
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, Scotland, ML2 0EF, United Kingdom (2 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Storage (Duration 1h) Zenobe Wishaw Limited New Build Generating CMU Wishaw Wishaw Not Prequalified ML2
Active • 2024-25 (T-4)
12.36 MW
Land at Hall Farm, Northwold, Thetford, IP26 5LQ (2 components)

7.5MW, 1-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with.

Storage (Duration 1h) NORTHWOLD SOLAR FARM LIMITED New Build Generating CMU Northwold Solar Farm BESS IP26
Active • 2028-29 (T-4), 2025-26 (T-1)
1.81 MW
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD (7 components)

CMU comprising of battery storage and associated plant

Storage (Duration 1h) CONRAD (FLITWICK) LIMITED Existing Generating CMU Flitwick Flitwick +3 more MK45
Active • 2028-29 (T-4), 2027-28 (T-4) ...
30.94 MW
Land at former East Midlands Electricity Depot, Hawkins Lane, Burton upon Trent, DE14 1DB (1 component)

Grid-scale energy storage system based on Lithium Ion, capable of exporting 25MW for a 1 hour duration installed on designated land within a compound at Burton upon trent

Storage (Duration 1h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Burton Not Prequalified DE14
Active • 2025-26 (T-4)
4.99 MW
Land at Enderby Substation, Beggars Lane, Leicester, LE19 4AD (3 components)

A Battery Energy Storage System.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
41.91 MW
LAND AT, DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB. (Nearest postcode to grid reference: SS11 8UA). (7 components)
• Battery Storage Plant
• Battery storage plant
• Gas Peaking Reciprocating Engine
Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines Dollymans Power Limited New Build Generating CMU Dollymans Power 016 Dollymans Power 039 +3 more SS11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
191.99 MW
LAND AT DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB (Nearest Postcode: SS11 8UA). (9 components)

Battery Storage Plant

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 3h) DOLLYMANS STORAGE LIMITED New Build Generating CMU Dollymans Storage Dollymans Storage +4 more SS11
Active • 2025-26 (T-4), 2024-25 (T-4) ...
162.73 MW
Land adjacent to Nursling Substation, Station Road, Nursling, Southampton, SO16 0AH (9 components)
• New build battery storage unit
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection
• battery storage unit
Active • 2028-29 (T-4), 2025-26 (T-1) ...
38.86 MW
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (6 components)
• battery storage unit (2)
• New build battery storage unit
Storage (Duration 1h) NURSLING ENERGY TWO LIMITED Existing Generating CMU Nurse2 Nurse2 +3 more SO16
Active • 2025-26 (T-1), 2024-25 (T-1) ...
3.34 MW
Laighpark WWTW, Abercorn St, Paisley, PA3 4DF (1 component)

50MW/50MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU LAIGHPARK Not Prequalified PA3
Active • 2026-27 (T-4)
5.91 MW
Knottingley Hydropower Station Brotherton Weir Knottingley West Yorkshire WF11 8HR (2 components)

1.200 MW battery storage (2)

Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU WF11
Active • 2027-28 (T-4), 2026-27 (T-4)
0.14 MW
Loading map...
Showing 25 locations