Storage (Duration 1h)

218 unique locations (1932 components) - Page 6 of 9

Land at Burnley Road Simonstone BB12 7ND (16 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive •
Land at Boscar Grange Farm, Thirsk Road, Easingwold, York, YO61 3NQ (6 components)
• A 20MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
• A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer and DNO HV switch gear, Energy Management Systems and Monitoring systems. Refer to covering letter for further details.
Inactive •
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ (19 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive •
land adj West Melton Electricity substation Elsecar Road Brampton Bierlow, S63 6AG (6 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive •
Land Adj To Electricity Sub Station Hillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (4 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive •
Land Adj To Electricity Sub Station Hiillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (6 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive •
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (18 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive •
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (24 components)
• New build battery storage unit
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection
• battery storage unit
Active • 2023-24 (T-1), 2023-24 (T-4) ...
15.21 MW
Land adjacent to electricity sub station, Stonehill, Charlton, Wiltshire, SN16 9RP (18 components)
• Battery Energy Storage System located at Minety
• Battery Energy Storge System located at Minety, providing Capacity Market alongside other grid and power services.
Inactive •
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (7 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Inactive •
Land Adjacent to Electricity Sub Station, Stonehill, Charlton, Malmesbury, Wiltshire, SN16 9DX (16 components)
• 49.900MW Battery Energy Storage System
• 49.9MW Battery Energy Storage System located in Malmesbury, Wiltshire
Inactive •
Junction 3 Business Park, Balby carr bank, Doncaster DN4 8DE (13 components)

10MW of Battery Energy Storage Systems to be built. (3)

Inactive •
Johnson Street, Leigh, M46 0RB (5 components)

A Battery Energy Storage System

Inactive •
J3 Business Park Balby Carr End Doncaster DN4 8DE (8 components)
• 10 MW Storage facility
• 10 MW Storage facility located at Balby, Doncaster.
Inactive •
Ipswich Road, Cardiff, CF23 9AQ (10 components)
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2025-26 (T-4), 2026-27 (T-4) ...
41.79 MW
Indian Queens Substation, St Dennis, St Austell, PL26 8BY (1 component)

49.9 MW of Lithium Ion battery storage and power conversion system on a compound at Indian Queens Substation.

Inactive •
Hungerford Farm, Winchfield, Hook, RG27 8SW (3 components)

Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU …

Active • 2028-29 (T-4)
0.11 MW
Hulley Road Macclesfield Cheshire SK10 2LP (1 component)

20.000 MW of battery storage located at Macclesfield

Inactive •
High Flatworth, North Shields, Tyne and Wear, NE29 7SW (4 components)

New build one-hour duration storage to replace diesel plant

Inactive •
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (4 components)

Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU …

Active • 2026-27 (T-4), 2027-28 (T-4) ...
0.20 MW