Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

334 unique locations (1426 components) - Page 6 of 14

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Lebanon Farm, Lower Dunton Road, Dunton, Brentwood, RM14 3TD (1 component)

40MW/40MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU LEBANON FARM Not Prequalified RM14
Active • 2026-27 (T-4)
4.72 MW
Leafield Battery Site, Monks Lane, Corsham SN13 9PH (4 components)

electricity storage site comprising brand new batteries, inverters and associated connection plant

Active • 2026-27 (T-4), 2025-26 (T-4)
19.03 MW
Lascar Works, Tanpits Road, Bury, BL9 5BY (12 components)
• 20.000MW of battery storage located at Lascar Works
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
• Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU ADSLS2 ADSLS2 +2 more BL9
Active • 2028-29 (T-4), 2027-28 (T-4) ...
35.80 MW
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (11 components)
• 19.500 MW of battery storage located at Hereford.
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGLAR2 AGLAR2 +1 more HR1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.15 MW
Land West Of Mossbank Cottages, Drumcross, Bathgate, EH48 1JX (4 components)
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building.
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; equipment, metering room, SCADA room and 33kV switching room.
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; equipment, metering room, SCADA room and 33kV switching room.
Storage (Duration 1h) DRUMCROSS ENERGY STORAGE LIMITED New Build Generating CMU Drumcross Drumcross Energy Storage EH48
Active • 2025-26 (T-4), 2022-23 (T-4) ...
16.36 MW
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET NEAREST (4 components)

Battery storage 40.000MW/40.000MWh one duration battery new build

Storage (Duration 1h) CARE POWER (BARNSLEY) LIMITED New Build Generating CMU BARNB1 S70
Active • 2025-26 (T-4), 2024-25 (T-1) ...
17.60 MW
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET (1 component)

Frequency response 60 minute Battery Storage

Storage (Duration 1h) ADD RENEWABLES NO.3 LIMITED New Build Generating CMU Hunn1 Conditional S70
Inactive • 2022-23 (T-4)
10.29 MW
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) EQUINOR WELKIN MILL LIMITED New Build Generating CMU Welkin Mill 1 Welkin Mill 1 +5 more SK6
Active • 2025-26 (T-4), 2024-25 (T-4) ...
46.27 MW
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (3 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each.

Storage Storage (Duration 1h) RNK Holding Ltd New Build Generating CMU Ipsley Battery Storage Facility Ipsley Battery Storage Facility Conditional B98
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
2.73 MW
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (13 components)
• 17.315 MW installed capacity Battery Storage facility
• 17.615 MW installed capacity Battery Storage facility
• 19.791 MW installed capacity Battery Storage facility
DSR Storage (Duration 1h) SUSI EELPOWER ROCK FARM LIMITED Existing Generating CMU ROCK18 ROCK18 +7 more SY8
Active • 2028-29 (T-4), 2027-28 (T-4) ...
96.46 MW
Land To The South Of Kemsley Substation, Ypres Drive, Sittingbourne, Kent, ME10 2FB (9 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
50.26 MW
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 1h) PIVOTED POWER LLP New Build Generating CMU Pivot Power 1 ME10
Inactive • 2020-21 (T-1)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 1h) PIVOTED POWER LLP New Build Generating CMU Pivot Power 1 ME10
Inactive • 2021-22 (T-1)
Land to the North of Great Wheatley Road, Rayleigh, SS6 7AR (3 components)

The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each.

Storage Storage (Duration 1h) SOUTH EAST GRID STORAGE TWO LTD New Build Generating CMU Rayleigh Battery Storage Facility Rayleigh Battery Storage Facility SS6
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
7.37 MW
Land to the North of Bransholme Rd, Hull HU7 4YP, UK (2 components)
• The CMU component at the Bransholme Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
• The CMU component at the Bransholme Facility will be a capacity market and load balancing facility comprised of gas turbines and will have export capacity of 20.000MW.
Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Gas) NORTH EAST GRID STORAGE TWO LTD New Build Generating CMU Bransholme Battery Storage Facility Bransholme Facility Conditional HU7
Inactive • 2022-23 (T-4), 2021-22 (T-4)
24.84 MW
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (6 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
24.42 MW
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (6 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (3)

Storage Storage (Duration 1h) GRIDRESERVE LTD New Build Generating CMU Byers Brae Battery Storage Facility Byers Brae Battery Storage Facility +1 more EH54
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE (16 components)

4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs

Storage (Duration 1h) Zenobe Capenhurst Limited New Build Generating CMU Capenhurst Capenhurst +1 more CH1
Active • 2025-26 (T-4), 2024-25 (T-1) ...
52.86 MW
Land South of National Grid Electricity Substation, Capenhurst Lane, Capenhurst, Chester, CH66 2HD (4 components)

Standalone Battery Storage Asset

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) NATIVE RIVER LTD New Build Generating CMU Native River Native River +1 more CH66
Active • 2026-27 (T-4), 2025-26 (T-4) ...
49.35 MW
Land South of Main Road, Bilton, Hull, HU11 4DZ (2 components)
• New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details.
• New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details.
Inactive • 2022-23 (T-4), 2019-20 (T-1)
6.68 MW
Land South of Main Road, Bilton, Hull, HU11 4DZ (1 component)

New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details.

Storage (Duration 1h) ENERGY STORE 4 LTD New Build Generating CMU Hull Energy Centre Conditional HU11
Inactive • 2019-20 (T-1)
Land south of Halesfield 13, Telford, TF7 4PL (2 components)

5MW of Lithium Ion battery storage and power conversion systems.

Storage (Duration 1h) HALESFIELD ENERGY CENTER LTD New Build Generating CMU Not Prequalified TF7
Inactive • 2023-24 (T-4), 2022-23 (T-3)
1.05 MW
Land on the West Side of Blandford Road, Poole, BH16 6AB (2 components)

A 25MW New Build Battery Storage site

Storage (Duration 1h) Noriker Bond Ltd New Build Generating CMU Blandford 1 BH16
Inactive • 2023-24 (T-4), 2022-23 (T-3)
5.22 MW
Loading map...
Showing 25 locations