Storage (Duration 1h)

240 unique locations (1122 components) - Page 7 of 10

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
Maidenhead Road, Windsor, SL4 5GD (8 components) Geocoding Needed
• Battery Storage
• Battery storage
• Battery strorage unit
Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.57 MW
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (4 components) Geocoding Needed
• New build one-hour duration storage to replace diesel plant
• New build two-hour duration storage to replace diesel plant
Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.97 MW
Meadowcroft Farm, Gretton Fields, Gretton, GL54 5HJ (5 components) Geocoding Needed

The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 …

Storage Storage (Duration 1h) GHEB2 C1 Limited New Build Generating CMU Meadowcroft Farm Meadowcroft Farm +1 more Not Prequalified GL54
Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.19 MW
Middleton Road, Middleton, Lancashire, Near LA3 2SD (1 component)

49.900 Storage unit

Storage (Duration 1h) LANCASTER POWER LIMITED New Build Generating CMU Not Prequalified LA3
Active • 2024-25 (T-4)
12.36 MW
Mill Farm, Caythorpe, Heath Ln, Grantham, NG32 3ER (13 components) Geocoding Needed
• 7 MW of Battery Storage loacated at Grantham.
• 7 MW of Battery Storage located at Grantham.
• Battery Storage located at Grantham.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.33 MW
Millstream, Maidenhead Road, Windsor, SL45GD (2 components)

Battery storage unit (2)

Active • 2024-25 (T-4), 2021-22 (T-1)
Millstream, Maidenhead Road, Windsor, SL4 5GD (2 components) Geocoding Needed

Battery storage unit

Active • 2024-25 (T-4), 2021-22 (T-1)
0.21 MW
Near 10 Granny Barbours Road Nairn IV12 5HX (1 component)

30.000 MW standalone BESS

Active • 2026-27 (T-4)
3.54 MW
Near 10 Granny Barbours Road, Nairn, IV12 5HX (1 component) Geocoding Needed

30.000 MW standalone BESS

Active • 2026-27 (T-4)
3.54 MW
Near Clayfords Farm Strichen Buchan Aberdeenshire AB43 6RH (1 component)

30.000MW standalone battery energy storage project.

Active • 2026-27 (T-4)
3.54 MW
Near Clayfords Farm, Strichen, Buchan, Aberdeenshire, AB43 6RH (1 component) Geocoding Needed

30.000MW standalone battery energy storage project.

Active • 2026-27 (T-4)
3.54 MW
Newchurch Road, Bacup, Lancashire, OL13 0BL (4 components) Geocoding Needed

Battery Storage

Storage (Duration 1h) BOOM BACUP STORAGE LIMITED New Build Generating CMU BACUP STORAGE BACUP STORAGE OL13
Active • 2026-27 (T-4), 2025-26 (T-1) ...
4.43 MW
Newlands Farm, Tanners Lane, Fareham, PO14 2HT (5 components) Geocoding Needed
• 10MW Storage
• 15MW of Battery Energy Storage Systems
• 20MW of Battery Energy Storage Systems
DSR Storage (Duration 1h) FAREHAM ENERGY RESERVE 2 LIMITED LIMEJUMP LTD Unproven DSR CMU New Build Generating CMU FAR226 PO14
Active • 2025-26 (T-4), 2024-25 (T-1) ...
17.26 MW
Norrington Gate Farm, Norrington Gate, Broughton Gifford, Melksham, SN12 8LW (3 components) Geocoding Needed

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 004 LIMITED New Build Generating CMU Norrington Gate Farm Norrington Gate Farm +1 more Rejected SN12
Active • 2026-27 (T-4)
79.82 MW
Northmead Lane, Iron Acton, Rangeworthy, BS37 7LT (6 components) Geocoding Needed
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2026-27 (T-4), 2025-26 (T-4)
11.60 MW
North Tawton, Sampford Courtenay, West Devon, Devon, England, EX20 2DA, United Kingdom (3 components) Geocoding Needed

30MW/30MWh one hour battery

Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.49 MW
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (4 components)

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt (3)

Storage (Duration 1h) NORWICH EAST ELECTRIC FORECOURT LTD New Build Generating CMU Norwich East Electric Forecourt Norwich East Electric Forecourt +2 more NR13
Active • 2025-26 (T-1), 2024-25 (T-1) ...
2.57 MW
Norwich East Electric Forecourt, Broadland Gate, Norwich, NR13 5HB (6 components) Geocoding Needed

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt

Active • 2026-27 (T-4), 2025-26 (T-1) ...
5.49 MW
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT (5 components) Geocoding Needed
• A 40MW New Build Battery Storage site
• A 45MWh New Build Battery Storage site
Storage (Duration 1h) Storage (Duration 1.5h) STAIRFOOT GENERATION LTD New Build Generating CMU Stairfoot 1 Stairfoot 1 +3 more S71
Active • 2025-26 (T-4), 2024-25 (T-4) ...
39.72 MW
Off Luss Road, Helensburgh, G84 9EQ (1 component) Geocoding Needed

39.9MW/39.9MWh greenfield BESS located on land north east of Blackhill Amenity Site, just off Luss Road in Helensburgh

Storage (Duration 1h) EKU ENERGY PROJECTS (UK) LIMITED New Build Generating CMU HELENSBURGH G84
Active • 2025-26 (T-4)
7.96 MW
Old Church Lane, Mountnessing, Hutton, Brentwood, Essex, England, CM13 1UN, United Kingdom (4 components) Geocoding Needed
• 50MW/50MWh one hour battery
• 50MW/50MWh one hour battery storage
Active • 2026-27 (T-4), 2025-26 (T-1) ...
27.52 MW
Orchardbank 1 Limited Battery Storage Site, Orchard Loan, Oilfield Machinery Ltd, Orchard Bank Industrial Estate, Forfar, DD8 1TD (1 component) Geocoding Needed

9.999MW/9.999MWh BESS located to the rear of Dean Park Orchard Loan in Orchardbank Industrial Estate

Storage (Duration 1h) EKU ENERGY PROJECTS (UK) LIMITED New Build Generating CMU ORCHARD BANK DD8
Active • 2025-26 (T-4)
2.00 MW
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD (3 components) Geocoding Needed
• This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
• This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
Active • 2027-28 (T-4), 2025-26 (T-1) ...
4.51 MW
Ordsall Lane, Ordsall, Salford Quays, Salford, M5 3NB (2 components) Geocoding Needed

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) WESSEX ENERGY STORAGE LTD New Build Generating CMU Not Prequalified M5
Active • 2025-26 (T-4)
2.99 MW
Loading map...