Johnson Street, Leigh, M46 0RB (5 components)

A Battery Energy Storage System

Inactive •
J3 Business Park Balby Carr End Doncaster DN4 8DE (8 components)
• 10 MW Storage facility
• 10 MW Storage facility located at Balby, Doncaster.
Inactive •
Ipswich Road, Cardiff, CF23 9AQ (10 components)
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2025-26 (T-4), 2026-27 (T-4) ...
41.79 MW
Inverkeithing Battery Storage Facility (aka Broomhall Battery Storage Facility) Land off the B981 (see uploaded map) just north of Burnside Industrial Estate near Inverkeithing KY11 1HT (7 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive •
Indian Queens Substation, St Dennis, St Austell, PL26 8BY (1 component)

49.9 MW of Lithium Ion battery storage and power conversion system on a compound at Indian Queens Substation.

Inactive •
Hungerford Farm, Winchfield, Hook, RG27 8SW (3 components)

Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU …

Active • 2028-29 (T-4)
0.11 MW
Hulley Road Macclesfield Cheshire SK10 2LP (1 component)

20.000 MW of battery storage located at Macclesfield

Inactive •
High Flatworth, North Shields, Tyne and Wear, NE29 7SW (4 components)

New build one-hour duration storage to replace diesel plant

Inactive •
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (4 components)

Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU …

Active • 2026-27 (T-4), 2027-28 (T-4) ...
0.20 MW
Heatherywood Road, Kirkcaldy, KY1 3NW (1 component)

1hr Duration battery storage project.

Inactive •
Heatherywood Road, Kirkcaldy KY1 3NW (5 components)

1hr duration battery storage project.

Inactive •
Green Ln, Thurcroft, Wickersley, Rotherham, UK, S66 9JD (18 components)
• A new Build Generating Storage CMU
• Existing Generating Storage CMU
Inactive •
Greenfield Road, Westoning, Bedford, MK45 5JD (10 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for 40mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System.
Inactive •
Great Field Lane, Somerden Road, Hull, HU9 5QJ (1 component)

New build one-hour duration storage to replace diesel plant

Inactive •
Goosehall Farm, Factory Road, Burwell, CB25 0BN (5 components)

A 5MW/5MWh Storage: minimum 1.0 hour duration battery facility sharing an existing connection with an existing solar farm but electrically separate with its own independent Import and Export metering system …

Inactive •
Gipsy Lane, A664, Rochdale, OL11 3HA (8 components)

A Battery Energy Storage System

Inactive •
Gipsy Lane, A664, Rochdale, OL11 3AE (4 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for 18mw which is split between CMUs - further detail in covering letter
• 8 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for 18mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System
Inactive •
Gatwick Electric Forecourt Buckingham Gate Gatwick RH6 0NT (13 components)

A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt

Active • 2022-23 (T-1), 2023-24 (T-1) ...
7.93 MW
Gateway Crescent, Oldham Broadway Park, Oldham, Lancashire OL9 9XB (4 components)

The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system …

Inactive •