Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

218 unique locations (1932 components) - Page 9 of 9

Bolney Substation, Wineham Lane, Bolney, Haywards Heath, BN5 9AW (1 component)

49.9mw Lithium Ion batteries and power conversion system on a compound at Bolney Substation

Inactive •
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (3 components)

Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing …

Active • 2028-29 (T-4)
0.11 MW
Bilton Farm, Preston Road, Hull, HU11 4DZ (24 components)
• Battery Energy storage linked to solar farm
• Solar farm
Inactive •
Battery Storage, Keel Drive, Slough, SL1 2YA (4 components)
• A 20MW New Build Battery Storage site
• A 29.5MW New Build Battery Storage site
Inactive •
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (12 components)

Battery Energy Storage System (3)

Inactive •
Basing Road, Basingstoke, RG24 7AN (6 components)

New Build CMU comprising of battery storage and associated plant

Inactive •
Barton Hill Way, Torquay, TQ2 8JG (10 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
• New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
Inactive •
Baglan Energy Park, Briton Ferry, Port Talbot, SA11 2GA (5 components)
• New build one-hour duration storage to replace diesel plant
• One-hour duration Battery Storage Plant.
Inactive •
Back Lane, Chesterfield, S44 5XQ (14 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• A Battery Energy Storage System.
Inactive •
Ardochrig Substation, off Ardochrig Road, Whitelee Windfarm, South Lanarkshire, G75 0QN (9 components)
• 1 x 50MW Lithium-ion battery with duration of 1 hour
• 1 x 50MW Lithium-ion batteryw with duration of 1 hour
Inactive •
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (16 components)
• Battery storage plant
• Existing generating battery storage unit.
Inactive •
Albion Road, Dartford, Kent, UK, DA1 5PZ (9 components)
• A 2.5MW New Build Battery Storage System
• A New Build 2.5MW Generation Battery Site
• A New Build Generation Battery Site
Inactive •
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH (20 components)

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Inactive •
60-70 Reach Road Burwell CB25 0AH (5 components)
• 10MW of onshore wind generation
• 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
• 49.900MW storage installation
Inactive •
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (10 components)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 … (3)

Active • 2022-23 (T-3), 2022-23 (T-4) ...
12.68 MW
Loading map...
Showing 18 locations