Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
land adj West Melton Electricity substation Elsecar Road Brampton Bierlow, S63 6AG (3 components) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Storage (Duration 1h) WEST MELTON BATTERY STORAGE LIMITED New Build Generating CMU West Melton Storage West Melton Storage Conditional S63
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
24.46 MW
Land Adj To Electricity Sub Station Hillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (2 components) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage (Duration 1h) HILLHOUSE BATTERY STORAGE LIMITED New Build Generating CMU Hillhouse Storage Hillhouse Storage Rejected FY5
Inactive • 2023-24 (T-4), 2022-23 (T-3)
20.85 MW
Land Adj To Electricity Sub Station Hiillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (3 components) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Storage (Duration 1h) HILLHOUSE BATTERY STORAGE LIMITED New Build Generating CMU Hillhouse Storage Hillhouse Storage Conditional FY5
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
24.46 MW
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (6 components) Geocoding Needed

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Storage Storage (Duration 1h) SIGBAT A LIMITED New Build Generating CMU UKER28 UKER28 +2 more CH65
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
34.18 MW
Land adjacent to Nursling Substation, Station Road, Nursling, Southampton, SO16 0AH (9 components) Geocoding Needed
• New build battery storage unit
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection
• battery storage unit
Active • 2028-29 (T-4), 2025-26 (T-1) ...
38.86 MW
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (6 components)
• battery storage unit (2)
• New build battery storage unit
Storage (Duration 1h) NURSLING ENERGY TWO LIMITED Existing Generating CMU Nurse2 Nurse2 +3 more SO16
Active • 2025-26 (T-1), 2024-25 (T-1) ...
3.34 MW
Land adjacent to electricity sub station, Stonehill, Charlton, Wiltshire, SN16 9RP (5 components) Geocoding Needed
• Battery Energy Storage System located at Minety
• Battery Energy Storge System located at Minety, providing Capacity Market alongside other grid and power services.
Storage (Duration 1h) MINETY BATTERY STORAGE LIMITED New Build Generating CMU MBSS01 MBSS01 SN16
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
37.16 MW
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (3 components) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Storage (Duration 1h) MINETY BATTERY STORAGE LIMITED New Build Generating CMU Minety Storage Minety Storage Conditional SN16
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
24.46 MW
Land adjacent to electricity sub station Stonehill Charlton, Malmsbury, Wiltshire SN16 9DX (1 component) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage (Duration 1h) Lower Minety Energy Limited New Build Generating CMU Lower Minety Storage Conditional SN16
Inactive • 2022-23 (T-4)
14.67 MW
Land Adjacent to Electricity Sub Station, Stonehill, Charlton, Malmesbury, Wiltshire, SN16 9DX (5 components) Geocoding Needed
• 49.900MW Battery Energy Storage System
• 49.9MW Battery Energy Storage System located in Malmesbury, Wiltshire
Storage (Duration 1h) LOWER MINETY ENERGY LIMITED New Build Generating CMU LMES01 LMES01 SN16
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
36.60 MW
Laighpark WWTW, Abercorn St, Paisley, PA3 4DF (1 component) Geocoding Needed

50MW/50MWh BESS

Storage (Duration 1h) BLUESTONE ENERGY LTD New Build Generating CMU LAIGHPARK Not Prequalified PA3
Active • 2026-27 (T-4)
5.91 MW
Knottingley Hydropower Station, Brotherton Weir, Knottingley, West Yorkshire, WF11 8HR (3 components) Geocoding Needed

1.200 MW battery storage

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.45 MW
Knottingley Hydropower Station Brotherton Weir Knottingley West Yorkshire WF11 8HR (2 components)

1.200 MW battery storage (2)

Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU WF11
Active • 2027-28 (T-4), 2026-27 (T-4)
0.14 MW
Kirkhaw Lane, Ferrybridge, WF11 8RD (1 component) Geocoding Needed

New Build CMU comprising of battery storage and associated plant

Storage (Duration 1h) VOX ENERGY LIMITED New Build Generating CMU Ferrybridge Not Prequalified WF11
Active • 2025-26 (T-4)
4.79 MW
Junction 3 Business Park, Balby carr bank, Doncaster DN4 8DE (4 components) Geocoding Needed

10MW of Battery Energy Storage Systems to be built.

Storage (Duration 1h) DONCASTER POWER (10MW) LIMITED New Build Generating CMU DONC01 DN4
Active • 2025-26 (T-4), 2024-25 (T-1) ...
5.29 MW
Johnson Street, Leigh, M46 0RB (4 components) Geocoding Needed

A Battery Energy Storage System

Storage (Duration 1h) AVE 017 Limited New Build Generating CMU Johnson Street A Johnson Street B Not Prequalified M46
Inactive • 2023-24 (T-4), 2022-23 (T-3)
6.27 MW
J3 Business Park, Balby, Carr End, Doncaster, DN4 8DE (3 components) Geocoding Needed
• 10 MW Storage facility
• 10 MW Storage facility located at Balby, Doncaster.
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
7.26 MW
J3 Business Park Balby Carr End Doncaster DN4 8DE (2 components)
• 10 MW Storage facility
• 10 MW Storage facility located at Balby, Doncaster.
Storage Storage (Duration 1h) Limejump Virtual 5 Limited New Build Generating CMU Doncaster Balby Doncaster Balby DN4
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Ipswich Road, Cardiff, CF23 9AQ (10 components) Geocoding Needed
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2028-29 (T-4), 2026-27 (T-4) ...
33.94 MW
Inverkeithing Battery Storage Facility (aka Broomhall Battery Storage Facility), Land off the B981 (see uploaded map) just north of Burnside Industrial Estate near Inverkeithing KY11 1HT (4 components) Geocoding Needed

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
12.11 MW
Indian Queens Substation, St Dennis, St Austell, PL26 8BY (1 component) Geocoding Needed

49.9 MW of Lithium Ion battery storage and power conversion system on a compound at Indian Queens Substation.

Storage (Duration 1h) IQ ENERGY CENTRE LIMITED New Build Generating CMU Not Prequalified PL26
Inactive • 2023-24 (T-4)
10.20 MW
Hungerford Farm, Winchfield, Hook, RG27 8SW (10 components) Geocoding Needed
• 1.200MW of battery storage located at Hook.
• 1.200MW of storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW
• Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU AGABS3 Ancala (2B) +1 more RG27
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.69 MW
Hulley Road, Macclesfield, Cheshire, SK10 2LP (1 component) Geocoding Needed

20.000 MW of battery storage located at Macclesfield

Inactive • 2022-23 (T-4)
5.88 MW
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (12 components) Geocoding Needed
• Battery Storage Plant
• Gas peaking reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
168.56 MW
High Middlefield Farm, Durham Road, Thorpe Thewles, TS21 3LS. (2 components) Geocoding Needed

Battery Storage Plant

Active • 2025-26 (T-4), 2021-22 (T-4)
62.98 MW