Storage (Duration 2h)

2 unique locations (10 components)

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Bristol Avenue, Blackpool, FY2 0JF (7 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Battery Storage Storage (Duration 1h) Storage (Duration 2h) CONRAD (BLACKPOOL) LIMITED New Build Generating CMU Blackpool Blackpool +3 more FY2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
24.11 MW
The Manorway, Stanford-le-Hope, SS17 9LL (3 components)
• A Battery Energy Storage System (2)
• Reciprocating engines of 6 mW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.74 MW