25 unique locations (408 components)

Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (19 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Active • 2024-25 (T-4), 2023-24 (T-1) ...
37.76 MW
Swindon Power Generation Plant, Unit 1, Kingsdown Lane, Swindon, Wiltshire, SN3 4FS (6 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2027-28 (T-4), 2025-26 (T-1) ...
8.73 MW
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (13 components)

Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (14 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S19GT2 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.40 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (9 components)
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
Active • 2024-25 (T-4), 2024-25 (T-1) ...
22.21 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (13 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, cabling and other equipment as necessary for the operation of an energy storage system. It will be connected to the distribution network.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
48.30 MW
Plot 10 Dunnikier Business Park Midfield Drive Mitchelston Industrial Estate Kirkcaldy Fife KY1 3LW (2 components)

BATTERY STORAGE UNIT WITH 13.5 MWh energy supply and 20 MW power capacity

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land to the rear of Poulson Plant Hire, Wrecclesham Hill, Farnham, GU10 4JU (5 components)
• A new build 19MW battery energy storage system
• A new build 20MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (5 components)
• A 48MW battery energy storage system
• A 49.5MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
• A new build 29MW battery energy storage system
• A new build 30MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land at Sterte Avenue West, Poole, BH15 2AL (20 components)
• A 7 MW Battery Energy Storage System
• A 7.5MW Battery Energy Storage System
• A 7.5MW Tesla Battery Energy Storage System
• ... and 2 more unique descriptions
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.10 MW
Land at Fulwood Rd North, Sutton-in-Ashfield, NG17 2NB (25 components)
• Battery storage unit
• New reciprocating gensets in acoustic enclosure
• Reciprocating genset in acoustic enclosure
• ... and 1 more unique description
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (16 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
• A new build battery energy storage system
Active • 2026-27 (T-4), 2025-26 (T-4) ...
90.89 MW
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (8 components)
• A new build 10MW battery storage system
• A new build 11MW battery storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
7.70 MW
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (16 components)
• Battery Storage Plant
• Gas peaking reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
25.67 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (61 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1820.10 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (92 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage).
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1495.53 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (14 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
54.98 MW
Chesterfield Road, Swallownest, Sheffield, S26 4SX (2 components)
• Gas fired reciprocating engines
• New Build Generating CMU comprising of battery storage and associated plant.
Active • 2026-27 (T-4), 2021-22 (T-4)
2.84 MW