Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

Storage (Duration 2h)

47 unique locations (264 components) - Page 1 of 2

Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (8 components)
• Battery storage plant (2)
• Existing generating battery storage unit.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.14 MW
Auchteraw Farm, Fort Augustus, PH32 4BT (4 components)
• New build battery storage CMU with CMU ID 22AUC4
• New build battery storage CMU with CMU ID 23AUC1
• New build battery storage CMU with CMU ID 24AUC1
Active • 2026-27 (T-4), 2025-26 (T-1) ...
20.54 MW
Barton Hill Way, Torquay, TQ2 8JG (6 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.72 MW
Blandford Road, Poole, BH16 6AB (4 components)
• A 25 MW Battery Storage Site
• A 25MW Battery Storage Site
• A 25MW New Build Battery Storage Site
Active • 2026-27 (T-4), 2025-26 (T-1) ...
9.53 MW
Bristol Avenue, Blackpool, FY2 0JF (5 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.61 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (7 components)

49.5 MW Battery Energy Storage facility (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (10 components)

A new build 49.5MW battery energy storage system (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Clay Tye Road, Upminister, RM14 3PL (7 components)

49.5MW Battery Energy Storage facility connected to 132kv network (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Elsecar Road, Brampton Bierlow, West Melton, Rotherham, S63 6LS (3 components)

New Build Battery Storage Facility (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
21.41 MW
Farnham Battery Storage, Wrecclesham Hill, Farnham, GU10 4JU (2 components)

A new build 20MW battery energy storage system

Inactive • 2023-24 (T-1)
7.40 MW
Harrop Lane, Hare Croft, Wilsden, Bradford, West Yorkshire,BD15 0BZ (3 components)

New build battery storage. (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS (5 components)
• 49.5MW Battery Energy Storage facility (2)
• 49.9MW Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (6 components)

A new build 11MW battery storage system (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP, (4 components)

This is a 20MW battery storage facility connected at 33kV. (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, ML2 0EF (4 components)
• 49.95MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly …
• 49.95MW Battery Storage site at Wishaw. Connected via 33kV substation directly to Transmission network.
• 49.9MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly …
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Land at Sterte Avenue West, Poole, BH15 2AL (12 components)
• A 7.5MW Tesla Battery Energy Storage System (2)
• Tesla Battery Energy Storage System
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.54 MW
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
Land east of A981, Fraserburgh, Aberdeenshire (2 components)

12 x 3.800MW / 7.491MWh storage units installed on land adjacent to A981, Fraserburgh (2)

Active • 2026-27 (T-4), 2023-24 (T-1)
10.63 MW
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (5 components)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and … (2)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, …
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.28 MW
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (5 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
2.33 MW
Loading map...
Showing 25 locations