Storage (Duration 2h)

73 unique locations (307 components) - Page 1 of 3

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (10 components)

Battery Storage Plant (3)

Storage Storage (Duration 1h) Storage (Duration 2h) MINETY SOUTH STORAGE 2 LTD New Build Generating CMU Minety North Storage Minety North Storage 009 +6 more SN16
Active • 2025-26 (T-4), 2024-25 (T-1) ...
22.86 MW
A89, Deans, West Lothian, Scotland, EH54 8TB, United Kingdom (2 components)

29.9MW/29.9MWh one hour battery (2)

Active • 2026-27 (T-4), 2024-25 (T-1)
10.31 MW
Aikengall 2a Wind Farm Innerwick EH42 1SG (1 component)

New Build Battery Energy Storage System. To be connected at WesterDod 132kV substation.

Storage (Duration 2h) AIK2A SUSTAINABLE ENERGY LTD New Build Generating CMU Aikengall IIA BESS Yr 1 Not Prequalified EH42
Active • 2024-25 (T-1)
11.34 MW
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (7 components)
• Battery storage plant (2)
• Existing generating battery storage unit.
Storage (Duration 1h) Storage (Duration 2h) ARBROATH LIMITED New Build Generating CMU Arbroath 17.5MW 2hour BESS Arbroath 17.5MW 2hour BESS +4 more DD11
Active • 2025-26 (T-4), 2024-25 (T-1) ...
15.89 MW
Auchteraw Farm, Fort Augustus, PH32 4BT (4 components)
• New build battery storage CMU with CMU ID 22AUC4
• New build battery storage CMU with CMU ID 23AUC1
• New build battery storage CMU with CMU ID 24AUC1
Storage (Duration 2h) FIELD AUCHTERAW LTD. New Build Generating CMU FIELD AUCHTERAW FIELD AUCHTERAW +2 more PH32
Active • 2026-27 (T-4), 2025-26 (T-1) ...
49.76 MW
Basingstoke Energy Storage Facility, Basing Road, Old Basing, Basingstoke, Hampshire, RG24 7AL (3 components)

New Build CMU comprising of battery storage and associated plant (3)

Storage (Duration 2h) CONRAD (BASINGSTOKE) LIMITED New Build Generating CMU Basingstoke Basingstoke +1 more RG24
Active • 2027-28 (T-4), 2025-26 (T-1) ...
8.71 MW
Blandford Road, Poole, BH16 6AB (4 components)
• A 25 MW Battery Storage Site
• A 25MW Battery Storage Site
• A 25MW New Build Battery Storage Site
Storage (Duration 2h) Storage (Duration 1.5h) EQUINOR BLANDFORD ROAD LIMITED New Build Generating CMU Poise 1 Poise 1 +1 more BH16
Active • 2026-27 (T-4), 2025-26 (T-1) ...
23.04 MW
BSB Transport Ltd Trondheim Way, Redwood Park Estate, Stallingborough, Grimsby, North East Lincolnshire, DN41 8FD. (4 components)

A Battery Energy Storage System. (3)

Storage (Duration 2h) KXP IMMINGHAM LIMITED New Build Generating CMU Immingham Immingham +2 more Not Prequalified DN41
Active • 2026-27 (T-4), 2025-26 (T-1) ...
77.66 MW
Bumpers 2 BESS, Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (1 component)

A new build battery energy storage system

Storage (Duration 2h) HEIT BF LIMITED New Build Generating CMU Bumpers 2 ESS HP27
Active • 2024-25 (T-1)
11.11 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (6 components)

49.5 MW Battery Energy Storage facility (3)

Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CF LIMITED New Build Generating CMU CHAPELFARM CHAPELFARM +3 more LU4
Active • 2025-26 (T-4), 2024-25 (T-1) ...
29.21 MW
Craigton Interchange, Linburn, Bishopton, Renfrewshire, Scotland, PA7 5NT, United Kingdom (3 components)

30MW/30MWh one hour battery (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.49 MW
Farburn?Place, Dyce, Aberdeen, AB21 7GP (2 components)

Battery Storage 2 hour duration (2)

Active • 2026-27 (T-4), 2024-25 (T-1)
13.89 MW
Former Scrap Yard, Town Lane, Charnock Richard, Chorley, PR7 5HQ (3 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours (3)

Storage (Duration 2h) PULSE CLEAN ENERGY SPV ANNING LIMITED New Build Generating CMU TL2023 Town Lane PR7
Active • 2027-28 (T-4), 2025-26 (T-1) ...
18.72 MW
former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (6 components)

CMU to comprise multiple individual storage units metered and despatched centrally (3)

Storage (Duration 2h) Sembcorp Utilities (UK) Limited New Build Generating CMU S25BS3 Not Prequalified TS6
Active • 2026-27 (T-4), 2025-26 (T-4) ...
66.67 MW
Harrop Lane, Hare Croft, Wilsden, Bradford, West Yorkshire,BD15 0BZ (3 components)

New build battery storage. (3)

Storage (Duration 2h) UK BATTERY STORAGE LTD New Build Generating CMU Bradford Bradford +1 more BD15
Active • 2025-26 (T-4), 2024-25 (T-1) ...
45.36 MW
10.20 MW
18.76 MW
Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP (3 components)

This is a 99.9MW battery storage facility connected at 132kV. (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
69.01 MW
LAND ADJACENT TO WORMALD GREEN SUB-STATION, STATION LANE, WORMALD GREEN, HARROGATE, HG3 3RX (4 components)
• Battery Energy Storage System
• Energy Storage Site
• New Build 33 MW Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HEIT WG LIMITED New Build Generating CMU Wormald Green BESS Wormald Green ESS +1 more HG3
Active • 2026-27 (T-4), 2025-26 (T-1) ...
30.43 MW
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (12 components)

A new build 49.5MW battery energy storage system (3)

Storage Storage (Duration 2h) Storage (Duration 1.5h) HEIT BF LIMITED New Build Generating CMU BUMPERS BUMPERS +7 more HP27
Active • 2026-27 (T-4), 2025-26 (T-4) ...
65.35 MW
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (5 components)
• A New Build Battery Energy Storage System (2)
• A New Build Gas fuelled power plant at Capenhurst substation
Reciprocating engines Storage (Duration 2h) HD888CAP LIMITED New Build Generating CMU CAPENHURST CAPENHURST +2 more CH66
Active • 2025-26 (T-4), 2024-25 (T-1) ...
12.92 MW
LAND AT DOLLYMANS FARM DOUBLEGATE LANE, RAWRETH, WICKFORD, SS11 8UB (Nearest Postcode: SS11 8UA). (9 components)

Battery Storage Plant (3)

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 3h) DOLLYMANS STORAGE LIMITED New Build Generating CMU Dollymans Storage Dollymans Storage +4 more SS11
Active • 2025-26 (T-4), 2024-25 (T-1) ...
28.86 MW
Land at Enderby Substation, Beggars Lane, Leicester, LE19 4AD (3 components)

A Battery Energy Storage System. (2)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.46 MW
Land at Harrow Lane, Bulphan, Thurrock, Essex RM14 3RE (2 components)

Lithium-based battery energy storage system. (2)

Storage (Duration 2h) WARLEY GREEN LIMITED New Build Generating CMU WARLEY RM14
Active • 2025-26 (T-1), 2024-25 (T-1)
24.91 MW
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP, (4 components)

This is a 20MW battery storage facility connected at 33kV. (3)

Storage (Duration 2h) Storage (Duration 1.5h) HAWKERS HILL ENERGY PARK LIMITED New Build Generating CMU Hawkers Hill Hawkers Hill +2 more SP7
Active • 2025-26 (T-4), 2024-25 (T-1) ...
11.71 MW
Loading map...
Showing 25 locations