Storage (Duration 2h)

85 unique locations (484 components) - Page 1 of 4

Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (4 components)
• Existing CMU comprising of battery storage and associated plant (2)
• New Build CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.31 MW
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (4 components)
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park. (2)
• New build generating CMU component - Whaddon Farm BESS
Active • 2027-28 (T-4), 2024-25 (T-1)
1.99 MW
Wellington Street, Oldham, Lancashire OL4 1SA (7 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment. (2)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
7.09 MW
Unit 1, Brindley Close, Cheney Manor Industrial Estate, Swindon, SN2 2YW (3 components)

12MW 24MWh battery storage located at Brindley Close in Swindon (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
UK Power Reserve, Traston Road, Newport, South Wales, NP19 4RQ (4 components)
• CMU ID 22NEW4, a new build battery storage CMU
• CMU ID 23NEW1, a new build battery storage CMU
• CMU ID 24NEW1, a new build battery storage CMU
Active • 2026-27 (T-4), 2025-26 (T-1) ...
8.47 MW
Titchfield Lane, Wickham, Fareham PO15 6DY (3 components)

CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System) (3)

Active • 2027-28 (T-4), 2025-26 (T-1) ...
21.23 MW
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (4 components)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. (2)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. It is …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.18 MW
The Manorway, Stanford-leHope, SS17 9LL (5 components)
• A gas fuelled generating station (2)
• A Battery Energy Storage System
Active • 2025-26 (T-4), 2024-25 (T-1)
The land South-West of the Dunoon Electrical Substation located on Ardnadam Farm, Sandbank, Dunoon, Argyll and Bute, PA23 8PN (2 components)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works. (2)

Active • 2027-28 (T-4), 2024-25 (T-1)
5.23 MW
Swindon Power Generation Plant, Unit 1, Kingsdown Lane, Swindon, Wiltshire, SN3 4FS (5 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2027-28 (T-4), 2025-26 (T-1) ...
6.67 MW
St Philips Energy Storage Facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2024-25 (T-1)
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (2 components)
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14MW, located in Buxton
Active • 2025-26 (T-1), 2024-25 (T-1)
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (9 components)

Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH. (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (6 components)
• 50MW of BESS to be installed within a future Greener Grid Park. (2)
• BESS project to be installed within a future Greener Grid Park.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
37.96 MW
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (4 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV …
Active • 2027-28 (T-4), 2026-27 (T-4) ...
4.87 MW
Scawby Brook, Brigg, Lincolnshire, DN20 9LT. (3 components)

Brigg Battery 2 hour duration (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.78 MW
Salisbury BESS, The Avenue, Salisbury, Wiltshire, South West England, England, SP2 0BU, United Kingdom (2 components)
• The CMU is a Battery Energy Storage System with a planned 49.5MW active power output, consisting of containerised batteries.
• The CMU is a Battery Energy Storage System with a planned 49.9MW active power output, consisting of containerised batteries.
Active • 2025-26 (T-4), 2024-25 (T-1)
Rusholme Grange, Drax, YO8 8PW (4 components)
• New build 35MW Battery Energy Storage System (2)
• Lithium-ion Battery Energy Storage System
Active • 2025-26 (T-4), 2024-25 (T-1) ...
12.96 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Gas CHP on South bank of river Humber providing electricity and industrial steam (4)
• Battery storage unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (7 components)
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises … (2)
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works …
Active • 2024-25 (T-4), 2024-25 (T-1) ...
7.40 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
• A New Build battery energy storage system. (2)
• An existing battery energy storage system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
20.46 MW
Pillswood Phase 1, Pillswood Farm, Dunswell Farm, Cottingham, East Riding Of Yorkshire, HU16 4JS (3 components)
• A 49.9MW battery energy storage system
• A battery energy storage system
Active • 2024-25 (T-1), 2023-24 (T-1)
18.33 MW
Loading map...
Showing 25 locations