52 unique locations (524 components) - Page 1 of 3

132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Active • 2027-28 (T-4), 2025-26 (T-4) ...
93.41 MW
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (4 components)
• CMU consisting of multiple reciprocating engines and alternators (2)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (7 components)

49.5 MW Battery Energy Storage facility (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (10 components)

A new build 49.5MW battery energy storage system (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Clay Tye Road, Upminister, RM14 3PL (7 components)

49.5MW Battery Energy Storage facility connected to 132kv network (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Cleve Hill Solar Park, Seasalter Road, Graveney with Goodnestone, Swale, Kent CT5 4BP (3 components)
• A transmission connected battery storage unit
• A transmission connected solar park.
Active • 2024-25 (T-4)
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (80 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2549.84 MW
Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS (5 components)
• 49.5MW Battery Energy Storage facility (2)
• 49.9MW Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Land adjacent to Salisbury Substation, Salisbury, SP2 0BL (1 component)

49.5MW Battery Energy Storage System

Active • 2024-25 (T-4)
LAND ADJOINING BATES ROAD QUAYSIDE INDUSTRIAL ESTATE MALDON CM9 5FA (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2024-25 (T-4)
LAND AND BUILDINGS ON THE SOUTH EAST SIDE AND ON THE NORTH WEST SIDE OF CRANBORNE ROAD POTTERS BAR EN6 3JF (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2024-25 (T-4)
Land at Axminster Substation, Pound Road, Axminster, Devon, EX13 5RX (4 components)

A Battery Energy Storage System (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
19.47 MW
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (6 components)

A new build 11MW battery storage system (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (12 components)

A new build 49.5MW battery energy storage system (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
17.59 MW
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (5 components)
• A New Build Battery Energy Storage System (2)
• A New Build Gas fuelled power plant at Capenhurst substation
Active • 2025-26 (T-4), 2024-25 (T-4) ...
LAND AT DUNHAMS LANE LETCHWORTH GARDEN CITY SG6 1JH (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2024-25 (T-4)
Land at Enderby Substation, Beggars Lane, Leicester, LE19 4AD (3 components)

A Battery Energy Storage System. (2)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land at Iron Acton Substation, Larks Lane, Iron Acton, BS37 9TX (4 components)

A Battery Energy Storage System. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
35.65 MW
Land at Legacy Substation, Bronwylfa Road, Legacy, Wrexham, LL14 4HY (3 components)
• A Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
28.95 MW
46.96 MW
Loading map...