35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated land within a compound at Hyde
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
30.65 MW
Ashley Clinton Estate, Milford-on-Sea, Lymington, SO41 0LA (1 component)

A standalone 0.949MW BESS connected directly to the DNO network

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 2 Rejected SO41
Active • 2025-26 (T-1)
0.26 MW
Auchteraw Farm, Fort Augustus, PH32 4BT (4 components)
• New build battery storage CMU with CMU ID 22AUC4
• New build battery storage CMU with CMU ID 23AUC1
• New build battery storage CMU with CMU ID 24AUC1
Storage (Duration 2h) FIELD AUCHTERAW LTD. New Build Generating CMU FIELD AUCHTERAW FIELD AUCHTERAW +2 more PH32
Active • 2026-27 (T-4), 2025-26 (T-1) ...
49.76 MW
Barton Hill Way, Torquay, TQ2 8JG (6 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Storage (Duration 1h) Storage (Duration 2h) CONRAD (TORQUAY) LIMITED New Build Generating CMU Barton Hill Torquay +4 more TQ2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
21.74 MW
Basingstoke Energy Storage Facility, Basing Road, Old Basing, Basingstoke, Hampshire, RG24 7AL (3 components)

New Build CMU comprising of battery storage and associated plant (3)

Storage (Duration 2h) CONRAD (BASINGSTOKE) LIMITED New Build Generating CMU Basingstoke Basingstoke +1 more RG24
Active • 2027-28 (T-4), 2025-26 (T-1) ...
8.71 MW
Birch Road, Colchester CO2 0EJ (2 components)

This CMU component represents the BESS system of a co-located (solar and storage) site (2)

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Layer 2 BESS Layer 2 BESS CO2
Active • 2027-28 (T-4), 2025-26 (T-1)
10.68 MW
Blandford Road, Poole, BH16 6AB (4 components)
• A 25 MW Battery Storage Site
• A 25MW Battery Storage Site
• A 25MW New Build Battery Storage Site
Storage (Duration 2h) Storage (Duration 1.5h) EQUINOR BLANDFORD ROAD LIMITED New Build Generating CMU Poise 1 Poise 1 +1 more BH16
Active • 2026-27 (T-4), 2025-26 (T-1) ...
23.04 MW
Bristol Avenue, Blackpool, FY2 0JF (7 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Battery Storage Storage (Duration 1h) Storage (Duration 2h) CONRAD (BLACKPOOL) LIMITED New Build Generating CMU Blackpool Blackpool +3 more FY2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
24.11 MW
BSB Transport Ltd Trondheim Way, Redwood Park Estate, Stallingborough, Grimsby, North East Lincolnshire, DN41 8FD. (4 components)

A Battery Energy Storage System. (3)

Storage (Duration 2h) KXP IMMINGHAM LIMITED New Build Generating CMU Immingham Immingham +2 more Not Prequalified DN41
Active • 2026-27 (T-4), 2025-26 (T-1) ...
77.66 MW
Bumpers 1 BESS, Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (1 component)

A battery energy storage system

Storage (Duration 2h) HEIT BF LIMITED Existing Generating CMU Bumpers 1 HP27
Active • 2025-26 (T-1)
12.73 MW
Bumpers 2 BESS, Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (1 component)

A battery energy storage system

Storage (Duration 2h) HEIT BF LIMITED Existing Generating CMU Bumpers 2 HP27
Active • 2025-26 (T-1)
12.73 MW
CMU-01 is located on previously developed land south of Bridge Road North, Wrexham Industrial Estate at nearest Grid Reference SJ 381495 and NGR 338124,349551 and closest identifiable Post Code of LL13 9RD. Post Code reference has also been taken as LL13 (2 components)

CMU-01 is for a 5MW-2 hour battery energy storage system, exporting at 11KV to the distribution system of Scottish Power Energy Networks (2)

Storage (Duration 2h) CLEAN BATTERY POWER UK 1 LIMITED New Build Generating CMU BRN Ash Road LL13
Active • 2028-29 (T-4), 2025-26 (T-1)
2.41 MW
CMU-02 is located on previously developed land south of Bridge Road North, Wrexham Industrial Estate at grid reference 381124,349551 and at Post Code LL13 9RD. An alternative less accurate Post Code has also been used LL13 9PS. CMU-02 is located on the (2 components)

CMU-02 is a 5 MW - 2hour battery energy storage system connected at 11 KV to the distribution network of Scottish Power Energy Networks (2)

Storage (Duration 2h) CLEAN BATTERY POWER UK 1 LIMITED New Build Generating CMU BRN - Marchweil LL13
Active • 2028-29 (T-4), 2025-26 (T-1)
2.41 MW
Craigton Interchange, Linburn, Bishopton, Renfrewshire, Scotland, PA7 5NT, United Kingdom (3 components)

30MW/30MWh one hour battery (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.49 MW
Elsecar Road, Brampton Bierlow, West Melton, Rotherham, S63 6LS (2 components)

New Build Battery Storage Facility (2)

Storage (Duration 2h) SWANGATE ENERGY STORAGE LIMITED New Build Generating CMU SWANBT SWANBT S63
Active • 2025-26 (T-1), 2023-24 (T-1)
31.02 MW
Emmers Farm, Holt Road, BH21 7HJ (2 components)

2h-duration battery system (2)

Storage (Duration 2h) MANNINGTON ENERGY CENTRE LIMITED New Build Generating CMU Rejected BH21
Active • 2028-29 (T-4), 2025-26 (T-1)
15.87 MW
Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (3 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (3)

Storage (Duration 2h) SSE FERRYBRIDGE BATTERY LIMITED SSE UTILITY SOLUTIONS LIMITED New Build Generating CMU Ferrybridge BESS Ferrybridge BESS +1 more WF11
Active • 2027-28 (T-4), 2026-27 (T-4) ...
89.14 MW
Former Scrap Yard, Town Lane, Charnock Richard, Chorley, PR7 5HQ (3 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours (3)

Storage (Duration 2h) PULSE CLEAN ENERGY SPV ANNING LIMITED New Build Generating CMU TL2023 Town Lane PR7
Active • 2027-28 (T-4), 2025-26 (T-1) ...
18.72 MW
HAWK'S NEST FARM, MISLINGFORD, FAREHAM, PO17 5AR (1 component)

A standalone 2 hour BESS connecting directly to the DNO network.

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 2 Rejected PO17
Active • 2025-26 (T-1)
0.26 MW
High Flat Farm BESS, Adjacent to East Kilbride 33kV substation G74 4GY (1 component)

Standalone battery storage system connecting at 33kV to the East Killbride substation

Storage (Duration 2h) CATHKIN ENERGY STORAGE LIMITED New Build Generating CMU CATHKIN G74
Active • 2025-26 (T-1)
12.90 MW
KIMPTON WOOD SOLAR FARM, SHODDESDEN GRANGE, GREAT SHODDESDEN, ANDOVER SP11 9LP (2 components)

This CMU component represents the BESS system of a co-located (solar and storage) site (2)

Storage (Duration 2h) LOW CARBON UK SOLAR OPERATIONS LIMITED New Build Generating CMU Kimpton BESS Kimpton BESS SP11
Active • 2027-28 (T-4), 2025-26 (T-1)
3.32 MW
Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP (3 components)

This is a 99.9MW battery storage facility connected at 132kV. (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
69.01 MW
LAND ADJACENT TO WORMALD GREEN SUB-STATION, STATION LANE, WORMALD GREEN, HARROGATE, HG3 3RX (4 components)
• Battery Energy Storage System
• Energy Storage Site
• New Build 33 MW Battery Energy Storage system
Storage (Duration 2h) Storage (Duration 1.5h) HEIT WG LIMITED New Build Generating CMU Wormald Green BESS Wormald Green ESS +1 more HG3
Active • 2026-27 (T-4), 2025-26 (T-1) ...
30.43 MW
Land and buildings lying to the East and West of Swinderby Road, Eagle and Swinethorpe being part of the Eagle Hall Estates, LN6 9JA (1 component)

A 2 hour BESS connected directly to the DNO network

Storage (Duration 2h) GRIDSOURCE LIMITED New Build Generating CMU Power Pod 5 Not Prequalified LN6
Active • 2025-26 (T-1)
0.26 MW
Land at Birkhill Commercial Park, Coalburn, S Lanarkshire, ML11 0FT (3 components)
• New Build Battery Storage (2)
• New build battery storage
Storage (Duration 2h) ALCEMI STORAGE DEVELOPMENTS 4 LIMITED New Build Generating CMU COALB1 COALB1 +1 more ML11
Active • 2028-29 (T-4), 2027-28 (T-4) ...
197.67 MW
Loading map...
Showing 25 locations