Storage (Duration 2h)

82 unique locations (256 components) - Page 1 of 4

35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
22.03 MW
Ashley Clinton Estate, Milford-on-Sea, Lymington, SO41 0LA (1 component)

A standalone 0.949MW BESS connected directly to the DNO network

Active • 2025-26 (T-1)
0.26 MW
Auchteraw Farm, Fort Augustus, PH32 4BT (4 components)
• New build battery storage CMU with CMU ID 22AUC4
• New build battery storage CMU with CMU ID 23AUC1
• New build battery storage CMU with CMU ID 24AUC1
Active • 2026-27 (T-4), 2025-26 (T-1) ...
20.54 MW
Barton Hill Way, Torquay, TQ2 8JG (6 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.72 MW
Basingstoke Energy Storage Facility, Basing Road, Old Basing, Basingstoke, Hampshire, RG24 7AL (3 components)

New Build CMU comprising of battery storage and associated plant (3)

Active • 2027-28 (T-4), 2025-26 (T-1) ...
5.29 MW
Birch Road, Colchester CO2 0EJ (2 components)

This CMU component represents the BESS system of a co-located (solar and storage) site (2)

Active • 2027-28 (T-4), 2025-26 (T-1)
10.68 MW
Blandford Road, Poole, BH16 6AB (4 components)
• A 25 MW Battery Storage Site
• A 25MW Battery Storage Site
• A 25MW New Build Battery Storage Site
Active • 2026-27 (T-4), 2025-26 (T-1) ...
9.53 MW
Bristol Avenue, Blackpool, FY2 0JF (5 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.61 MW
12.73 MW
12.73 MW
Elsecar Road, Brampton Bierlow, West Melton, Rotherham, S63 6LS (3 components)

New Build Battery Storage Facility (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
21.41 MW
Emmers Farm, Holt Road, BH21 7HJ (2 components)

2h-duration battery system (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
15.87 MW
Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (3 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
89.14 MW
Former Scrap Yard, Town Lane, Charnock Richard, Chorley, PR7 5HQ (3 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours (3)

Active • 2027-28 (T-4), 2025-26 (T-1) ...
12.15 MW
HAWK'S NEST FARM, MISLINGFORD, FAREHAM, PO17 5AR (1 component)

A standalone 2 hour BESS connecting directly to the DNO network.

Active • 2025-26 (T-1)
0.26 MW
High Flat Farm BESS, Adjacent to East Kilbride 33kV substation G74 4GY (2 components)

Standalone battery storage system connecting at 33kV to the East Killbride substation (2)

Active • 2027-28 (T-4), 2025-26 (T-1)
19.47 MW
KIMPTON WOOD SOLAR FARM, SHODDESDEN GRANGE, GREAT SHODDESDEN, ANDOVER SP11 9LP (2 components)

This CMU component represents the BESS system of a co-located (solar and storage) site (2)

Active • 2027-28 (T-4), 2025-26 (T-1)
3.32 MW
Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP (2 components)

This is a 99.9MW battery storage facility connected at 132kV. (2)

Active • 2026-27 (T-4), 2025-26 (T-1)
43.38 MW
Land 90 Metres South West Of Noahs Ark Old Gallows Road Perth PH1 1QE (2 components)
• 2 hours Lithium-In battery storage facility in Scotland connected to the distribution network with a connection capacity of 49.4MW
• 49.9 MW standalone battery energy storage project.
Active • 2027-28 (T-4), 2025-26 (T-1)
18.80 MW
LAND ADJACENT TO WORMALD GREEN SUB-STATION, STATION LANE, WORMALD GREEN, HARROGATE, HG3 3RX (3 components)
• Energy Storage Site
• New Build 33 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Active • 2026-27 (T-4), 2025-26 (T-1) ...
14.35 MW
0.26 MW
Land at Birkhill Commercial Park, Coalburn, S Lanarkshire, ML11 0FT (3 components)
• New Build Battery Storage (2)
• New build battery storage
Active • 2028-29 (T-4), 2027-28 (T-4) ...
197.67 MW
Land at Birkin Lane, Grassmoor, Chesterfield, S42 5BP (1 component)

A 2 hour BESS connected directly to the DNO network

Active • 2025-26 (T-1)
0.26 MW
Loading map...