Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

107 unique locations (467 components) - Page 1 of 5

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
West Marsh Road Spalding Lincolnshire PE11 3BB (13 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Spalding, Lincolnshire. Metering of output is … (3)

Storage (Duration 2h) Storage (Duration 4h) SPALDING ENERGY PARK LIMITED New Build Generating CMU SPBB18 SPBC18 +7 more PE11
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Unit 23, Cocker Avenue, Poulton Industrial Estate, FY6 8JU (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Poulton Power FY6
Active • 2025-26 (T-4)
Unit 1, Brindley Close, Cheney Manor Industrial Estate, Swindon, SN2 2YW (3 components)

12MW 24MWh battery storage located at Brindley Close in Swindon (3)

Storage (Duration 2h) Zenobe Brindley Limited New Build Generating CMU Brindley_21 Brindley_21 +1 more SN2
Active • 2025-26 (T-4), 2024-25 (T-1) ...
7.16 MW
The Manorway, Stanford-leHope, SS17 9LL (5 components)
• A gas fuelled generating station (2)
• A Battery Energy Storage System
Reciprocating engines Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) CORPOWER LIMITED New Build Generating CMU Corpower Corpower +3 more Not Prequalified SS17
Active • 2025-26 (T-4), 2024-25 (T-1)
8.21 MW
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is … (3)

Storage (Duration 2h) Open Cycle Gas Turbine (OCGT) GATEWAY ENERGY CENTRE LIMITED New Build Generating CMU Gateway Energy Centre Limited Gateway Energy Centre Limited +9 more SS17
Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
the land to the south west of Middleton Road, Middleton, Morecambe extending to approximately 3 acres (1 component) Geocoding Needed

75.00 MW of Battery Energy Storage Units with associated infrastructure.

Active • 2025-26 (T-4)
The Hollies Croft Skegness Lincolnshire PE24 4SH (1 component)

20MW-40MWh Battery Energy Storage system. Number of Inverters/skid: 6 x 3950kVA UP-XT/MVPS 4600S2 @ 25C Number of Electric combiner Box: 12 Number of battery box: 24

Storage (Duration 2h) RWE RENEWABLES UK SWINDON LIMITED New Build Generating CMU The Hollies Battery Storage Not Prequalified PE24
Active • 2025-26 (T-4)
The Common, Malmesbury, SN16 9RJ (2 components)
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Storage (Duration 1h) Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Malmesbury Malmesbury Not Prequalified SN16
Active • 2026-27 (T-4), 2025-26 (T-4)
7.08 MW
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (8 components)
• Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH. (2)
• Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH.
Storage Storage (Duration 2h) Storage (Duration 0.5h) NEVENDON ENERGY STORAGE LTD New Build Generating CMU Nevendon Battery Storage Nevendon Battery Storage +2 more SS14
Active • 2025-26 (T-4), 2024-25 (T-1) ...
0.46 MW
Speke Hall Avenue, Speke, Liverpool, L24 8DA (3 components)
• A new build, battery energy storage system (2)
• A new build, gas fueled generation station.
Reciprocating engines Storage (Duration 2h) BERYL STREET GENERATION LIMITED BAKER STREET GENERATION LIMITED New Build Generating CMU Speke BESS Speke BESS +1 more Not Prequalified L24
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.47 MW
South of Carnegie Road, Liverpool, L13 3AT (1 component)

New build battery storage

Storage (Duration 2h) LISTER BATTERY LTD New Build Generating CMU Lister L13
Active • 2025-26 (T-4)
Scawby Brook, Brigg, Lincolnshire, DN20 9LT. (3 components)

Brigg Battery 2 hour duration (3)

Storage (Duration 2h) CBS ENERGY STORAGE ASSETS UK LIMITED New Build Generating CMU 7RES31 7RES31 DN20
Active • 2028-29 (T-4), 2025-26 (T-4) ...
21.09 MW
Salisbury BESS, The Avenue, Salisbury, Wiltshire, South West England, England, SP2 0BU, United Kingdom (2 components)
• The CMU is a Battery Energy Storage System with a planned 49.5MW active power output, consisting of containerised batteries.
• The CMU is a Battery Energy Storage System with a planned 49.9MW active power output, consisting of containerised batteries.
Storage (Duration 2h) SSE BATTERY SALISBURY LIMITED New Build Generating CMU Salisbury BESS Salisbury BESS SP2
Active • 2025-26 (T-4), 2024-25 (T-1)
9.98 MW
RWE Generation UK plc, Cheshire Power Station North Road, Ellesmere Port Cheshire CH65 1AF (2 components)

The CMU will be formed of multiple battery storage units and medium voltage stations (inverter and battery transformer) connected in parallel. (2)

Storage (Duration 2h) RWE GENERATION UK PLC New Build Generating CMU CMU_CHES21 CMU_CHES21 Not Prequalified CH65
Active • 2026-27 (T-4), 2025-26 (T-4)
3.55 MW
Rusholme Grange, Drax, YO8 8PW (3 components)
• New build 35MW Battery Energy Storage System (2)
• Lithium-ion Battery Energy Storage System
Storage (Duration 2h) Storage (Duration 1.5h) HARMONY RH LTD New Build Generating CMU HRHL21 Rusholme BESS +1 more YO8
Active • 2025-26 (T-4), 2024-25 (T-1) ...
20.89 MW
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 003 LIMITED New Build Generating CMU Royle Barn Road Royle Barn Road +3 more Not Prequalified OL11
Active • 2026-27 (T-4), 2025-26 (T-1) ...
28.13 MW
Pleasance Road ? Battery, Coupar Site, Pleasance Road, Blairgowrie, PH13 9JB (5 components)

Battery storage plant (3)

Storage (Duration 1h) Storage (Duration 2h) COUPAR LIMITED New Build Generating CMU Coupar 20MW 2 hour BESS Coupar 21MW 2 hour BESS +3 more PH13
Active • 2025-26 (T-4), 2024-25 (T-1) ...
15.04 MW
Philip Street Car Breakers, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components)

New Build CMU comprising of battery storage and associated plant (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.69 MW
Overlea Farm , New Mills, High Peak, Stockport SK22 4QJ (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Overlea Not Prequalified SK22
Active • 2025-26 (T-4)
Ordsall Lane, Ordsall, Salford Quays, Salford, M5 3NB (2 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) WESSEX ENERGY STORAGE LTD New Build Generating CMU Not Prequalified M5
Active • 2025-26 (T-4)
North of Hull Rd, Osbaldwick, York,YO10 3JA (2 components)

New build battery storage.

Storage (Duration 2h) MONETS GARDEN BATTERY LTD New Build Generating CMU Monets Monets Phase 2 YO10
Active • 2025-26 (T-4)
Northmead Lane, Iron Acton, Rangeworthy, BS37 7LT (6 components)
• New build one-hour duration storage
• New build two-hour duration battery storage
Active • 2026-27 (T-4), 2025-26 (T-4)
6.29 MW
Netherton Farm, Keith AB55 5PE (14 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
• Lithium ion battery storage plant
Storage (Duration 2h) Storage (Duration 4h) ZENOBE BLACKHILLOCK LIMITED New Build Generating CMU Blackhillock Blackhillock +2 more AB55
Active • 2026-27 (T-4), 2025-26 (T-1) ...
169.83 MW
Mill Hill Farm, Woodend Road, Poynton, SK12 1EG (2 components)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Hazel Grove Poynton Battery Rejected SK12
Active • 2025-26 (T-4)
Loading map...
Showing 25 locations