Storage (Duration 2h)

2 unique locations (55 components)

G78 (52 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
58.10 MW
BIRDWOOD GROVE FAREHAM HAMPSHIRE PO16 (3 components)
• Load curtailment
• New Build Battery Energy Storage system
Active • 2028-29 (T-4), 2025-26 (T-4) ...
7.75 MW