Storage (Duration 2h)

107 unique locations (467 components) - Page 1 of 5

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Reciprocating engines Storage (Duration 2h) Storage (Duration 5h) Combined Cycle Gas Turbine (CCGT) CARRINGTON STORAGE LIMITED CARLTON ENERGY NO: 5 LIMITED New Build Generating CMU Trafford Power Battery Storage Unit 1 Trafford Power Battery Storage Unit 1 +15 more Not Prequalified M31
Active • 2027-28 (T-4), 2025-26 (T-4) ...
93.41 MW
135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Glowhouse Power PR26
Active • 2025-26 (T-4)
1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (10 components)

Battery Storage Plant (3)

Storage Storage (Duration 1h) Storage (Duration 2h) MINETY SOUTH STORAGE 2 LTD New Build Generating CMU Minety North Storage Minety North Storage 009 +6 more SN16
Active • 2025-26 (T-4), 2024-25 (T-1) ...
22.86 MW
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated land within a compound at Hyde
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
30.65 MW
Abbey Home Farm, Burford Road, Cirencester, GL7 5HF (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Abbey Not Prequalified GL7
Active • 2025-26 (T-4)
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (7 components)
• Battery storage plant (2)
• Existing generating battery storage unit.
Storage (Duration 1h) Storage (Duration 2h) ARBROATH LIMITED New Build Generating CMU Arbroath 17.5MW 2hour BESS Arbroath 17.5MW 2hour BESS +4 more DD11
Active • 2025-26 (T-4), 2024-25 (T-1) ...
15.89 MW
Barton Hill Way, Torquay, TQ2 8JG (6 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Storage (Duration 1h) Storage (Duration 2h) CONRAD (TORQUAY) LIMITED New Build Generating CMU Barton Hill Torquay +4 more TQ2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
21.74 MW
Beeston Park Farm, Ridge End Fold, Marple, Stockport, SK6 7EX (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Beeston Not Prequalified SK6
Active • 2025-26 (T-4)
Boot Lane, Sandbach, Cheshire CW11 3PY (2 components)
• 20MW of Battery Energy Storage Systems
• 26.000MW of Reciprocating Engines
Active • 2025-26 (T-4)
Catridge Farm, Wick Lane, Lacock, Chippenham, SN15 2LU (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Cartridge Not Prequalified SN15
Active • 2025-26 (T-4)
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (6 components)

49.5 MW Battery Energy Storage facility (3)

Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CF LIMITED New Build Generating CMU CHAPELFARM CHAPELFARM +3 more LU4
Active • 2025-26 (T-4), 2024-25 (T-1) ...
29.21 MW
Chinley House Farm, Dolly Lane, High Peak, Stockport, SK23 7NP (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Chinley Farm Not Prequalified SK23
Active • 2025-26 (T-4)
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (8 components)

A new build 49.5MW battery energy storage system (3)

Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF LIMITED New Build Generating CMU CLAY TYE FARM CLAY TYE FARM +4 more Not Prequalified RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Clay Tye Road, Upminister, RM14 3PL (6 components)

49.5MW Battery Energy Storage facility connected to 132kv network (3)

Storage (Duration 2h) Storage (Duration 1.5h) HARMONY CTF 2 LIMITED New Build Generating CMU CLAY TYE FARM 2 CLAYTYE2 +2 more Not Prequalified RM14
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS to be installed within a Greener Grid Park
Active • 2028-29 (T-4), 2026-27 (T-4) ...
39.02 MW
Felindre Pumping Station Substation, Pant Lasau Road, Llangyfelach, Morriston, SA5 7PA (1 component)

16MW/32MWh BESS on a future Greener Grid Park.

Storage (Duration 2h) STATKRAFT UK LTD New Build Generating CMU Rejected SA5
Active • 2025-26 (T-4)
former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (6 components)

CMU to comprise multiple individual storage units metered and despatched centrally (3)

Storage (Duration 2h) Sembcorp Utilities (UK) Limited New Build Generating CMU S25BS3 Not Prequalified TS6
Active • 2026-27 (T-4), 2025-26 (T-4) ...
66.67 MW
Former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (1 component)

CMU to comprise multiple individual storage units metered and despatched centrally

Active • 2025-26 (T-4)
Gerard Hall Battery Site, Mill Lane, Nursling SO16 0YE (2 components)

New Battery Storage Site comprising brand new batteries & inverters

Active • 2025-26 (T-4)
Goyt Hall Farm, Dark Lane, Romiley, Stockport SK6 3LH (2 components)
• A Battery Energy Storage System
• A distribution connected Battery Energy Storage System
Storage (Duration 2h) GOYT HALL PROJECT COMPANY LTD ETP-QQR ENERGY LIMITED New Build Generating CMU Goyt Farm Goyt Hall SK6
Active • 2028-29 (T-4), 2025-26 (T-4)
8.38 MW
Great Elm Farm, Pond Lane, Charlton, Wiltshire, SN16 9DS (2 components)

A Battery Energy Storage System (2)

Storage (Duration 2h) HD381GRE LTD New Build Generating CMU Minety 4 Minety 4 Not Prequalified SN16
Active • 2026-27 (T-4), 2025-26 (T-4)
11.22 MW
Haigh Park Road, Stourton, Rothwell, Leeds, West Yorkshire. LS10 1RT (2 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) WESSEX ENERGY STORAGE LTD New Build Generating CMU WES001 WES001 Not Prequalified LS10
Active • 2025-26 (T-4)
Hamble Lane, Old Netley, Southampton, SO31 5FT (2 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Hamble Hamble2 Not Prequalified SO31
Active • 2025-26 (T-4)
Harrop Lane, Hare Croft, Wilsden, Bradford, West Yorkshire,BD15 0BZ (3 components)

New build battery storage. (3)

Storage (Duration 2h) UK BATTERY STORAGE LTD New Build Generating CMU Bradford Bradford +1 more BD15
Active • 2025-26 (T-4), 2024-25 (T-1) ...
45.36 MW
Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (2 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Dellsome Power AL4
Active • 2026-27 (T-4), 2025-26 (T-4)
1.20 MW
Loading map...
Showing 25 locations