Storage (Duration 2h)

116 unique locations (755 components) - Page 1 of 5

132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Active • 2027-28 (T-4), 2025-26 (T-4) ...
93.41 MW
135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2025-26 (T-4)
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
22.03 MW
Abbey Home Farm, Burford Road, Cirencester, GL7 5HF (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
Arbroath Battery, East Muirlands Road, Arbroath, DD11 2QH (8 components)
• Battery storage plant (2)
• Existing generating battery storage unit.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
6.14 MW
Barton Hill Way, Torquay, TQ2 8JG (6 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.72 MW
Beeston Park Farm, Ridge End Fold, Marple, Stockport, SK6 7EX (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
Boot Lane, Sandbach, Cheshire CW11 3PY (2 components)
• 20MW of Battery Energy Storage Systems
• 26.000MW of Reciprocating Engines
Active • 2025-26 (T-4)
Bristol Avenue, Blackpool, FY2 0JF (5 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.61 MW
Catridge Farm, Wick Lane, Lacock, Chippenham, SN15 2LU (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (7 components)

49.5 MW Battery Energy Storage facility (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Chinley House Farm, Dolly Lane, High Peak, Stockport, SK23 7NP (1 component)

A Battery Energy Storage System

Active • 2025-26 (T-4)
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (10 components)

A new build 49.5MW battery energy storage system (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Clay Tye Road, Upminister, RM14 3PL (7 components)

49.5MW Battery Energy Storage facility connected to 132kv network (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (80 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS to be installed within a Greener Grid Park
Active • 2028-29 (T-4), 2026-27 (T-4) ...
39.02 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2549.84 MW
Felindre Pumping Station Substation, Pant Lasau Road, Llangyfelach, Morriston, SA5 7PA (1 component)

16MW/32MWh BESS on a future Greener Grid Park.

Active • 2025-26 (T-4)
former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (6 components)

CMU to comprise multiple individual storage units metered and despatched centrally (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
34.03 MW
Former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (1 component)

CMU to comprise multiple individual storage units metered and despatched centrally

Active • 2025-26 (T-4)
Gerard Hall Battery Site, Mill Lane, Nursling SO16 0YE (2 components)

New Battery Storage Site comprising brand new batteries & inverters

Active • 2025-26 (T-4)
Goyt Hall Farm, Dark Lane, Romiley, Stockport SK6 3LH (2 components)
• A Battery Energy Storage System
• A distribution connected Battery Energy Storage System
Active • 2028-29 (T-4), 2025-26 (T-4)
8.38 MW
Great Elm Farm, Pond Lane, Charlton, Wiltshire, SN16 9DS (2 components)

A Battery Energy Storage System (2)

Active • 2026-27 (T-4), 2025-26 (T-4)
11.22 MW
Loading map...
Showing 25 locations