Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

176 unique locations (682 components) - Page 1 of 8

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated land within a compound at Hyde
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2.5 Hour Battery Storage Plant.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
30.65 MW
A89, Deans, West Lothian, Scotland, EH54 8TB, United Kingdom (2 components)

29.9MW/29.9MWh one hour battery (2)

Active • 2026-27 (T-4), 2024-25 (T-1)
10.31 MW
adjacent to Kilmarnock South Substation KA1 3TN (2 components)
• 200MW battery storage located near to the SPT Kilmarnock South substation, split into two BMU's
• 200MW battery storage located near to theSPT Kilmarnock South substation, split into two BMU's
Storage (Duration 2h) ZENOBE KILMARNOCK SOUTH LIMITED New Build Generating CMU Kilmarnock South Not Prequalified KA1
Active • 2026-27 (T-4)
47.26 MW
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
• 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
• 75MW battery storage located near to the National Grid Stalybridge substation.
Storage (Duration 2h) Storage (Duration 4h) Zenobe Stalybridge Limited New Build Generating CMU Stalybridge Stalybridge Not Prequalified SK15
Active • 2027-28 (T-4), 2026-27 (T-4)
58.53 MW
Arran View Jameston Farm Dalry North Ayrshire KA24 4EY (1 component)

13 x 3.800MW / 7.491MWh storage units installed on designated land within a brownfield site at Jameston Farm, Dalry, North Ayrshire, KA24 4EY

Storage (Duration 2h) ARRAN VIEW STORAGE LTD New Build Generating CMU Not Prequalified KA24
Active • 2026-27 (T-4)
11.79 MW
Auchteraw Farm, Fort Augustus, PH32 4BT (4 components)
• New build battery storage CMU with CMU ID 22AUC4
• New build battery storage CMU with CMU ID 23AUC1
• New build battery storage CMU with CMU ID 24AUC1
Storage (Duration 2h) FIELD AUCHTERAW LTD. New Build Generating CMU FIELD AUCHTERAW FIELD AUCHTERAW +2 more PH32
Active • 2026-27 (T-4), 2025-26 (T-1) ...
49.76 MW
Barleylands Barleylands Road Billericay Essex CM11 2UD (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Storage (Duration 2h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU RAYLEIGH 2 Not Prequalified CM11
Active • 2026-27 (T-4)
11.67 MW
Barton Hill Way, Torquay, TQ2 8JG (6 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Storage (Duration 1h) Storage (Duration 2h) CONRAD (TORQUAY) LIMITED New Build Generating CMU Barton Hill Torquay +4 more TQ2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
21.74 MW
Bengrove Farm, Base Lane, Sandhurst, Gloucestershire, GL2 9NU (1 component)

CMU ID 22BEN4, a new build battery storage CMU

Storage (Duration 2h) BENGROVE BESS LTD New Build Generating CMU Bengrove Farm Not Prequalified GL2
Active • 2026-27 (T-4)
8.66 MW
Blandford Road, Poole, BH16 6AB (4 components)
• A 25 MW Battery Storage Site
• A 25MW Battery Storage Site
• A 25MW New Build Battery Storage Site
Storage (Duration 2h) Storage (Duration 1.5h) EQUINOR BLANDFORD ROAD LIMITED New Build Generating CMU Poise 1 Poise 1 +1 more BH16
Active • 2026-27 (T-4), 2025-26 (T-1) ...
23.04 MW
Bristol Avenue, Blackpool, FY2 0JF (7 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Battery Storage Storage (Duration 1h) Storage (Duration 2h) CONRAD (BLACKPOOL) LIMITED New Build Generating CMU Blackpool Blackpool +3 more FY2
Active • 2026-27 (T-4), 2025-26 (T-1) ...
24.11 MW
Bronze Cricket Club, Chapel Lane, Great Barr, Walsall, WS9 0QU (2 components)
• 2 hr duration Battery Energy Storage System located in England
• Energy Storage Facility
Storage (Duration 1h) Storage (Duration 2h) CHAPEL LANE ENERGY STORAGE LIMITED New Build Generating CMU Chapel Lane ES Chapel Lane ES WS9
Active • 2028-29 (T-4), 2026-27 (T-4)
14.62 MW
BSB Transport Ltd Trondheim Way, Redwood Park Estate, Stallingborough, Grimsby, North East Lincolnshire, DN41 8FD. (4 components)

A Battery Energy Storage System. (3)

Storage (Duration 2h) KXP IMMINGHAM LIMITED New Build Generating CMU Immingham Immingham +2 more Not Prequalified DN41
Active • 2026-27 (T-4), 2025-26 (T-1) ...
77.66 MW
Calow Green, Calow, S44 5XQ (3 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h) ADV 005 LIMITED New Build Generating CMU Calow Green Calow Green +1 more Not Prequalified S44
Active • 2026-27 (T-4)
53.16 MW
Carnegie Road, Stoneycroft, Liverpool, Merseyside, Liverpool City Region, L13 7GD (1 component)

Standalone battery energy storage system

Storage (Duration 2h) CARNEGIE (BES) LTD New Build Generating CMU QENER1_CANERGIE L13
Active • 2026-27 (T-4)
9.93 MW
Causeway Power, The Causeway Industrial Site, Maldon, CM9 4GG (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Storage (Duration 2h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Causeway Power Not Prequalified CM9
Active • 2026-27 (T-4)
1.18 MW
Chesterfield Road, Swallownest, Sheffield, S26 4SX (2 components)
• Gas fired reciprocating engines
• New Build Generating CMU comprising of battery storage and associated plant.
Storage (Duration 2h) OCGT and Reciprocating Engines (Fuel Type - Gas) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Chesterfield Chesterfield Road Not Prequalified S26
Active • 2026-27 (T-4), 2021-22 (T-4)
2.84 MW
Cleve Hill, Seasalter Road, Graveney with Goodnestone, Swale, Kent CT5 4BP (1 component)

A new build 230MW/460MWh battery storage facility connected to the National Grid Transmission network at 132kV, located at Cleve Hill.

Storage (Duration 2h) CLEVE HILL SOLAR PARK LIMITED New Build Generating CMU Uskmouth BESS CT5
Active • 2026-27 (T-4)
53.17 MW
Colton Farm Lochead Dunfermline Fife, KY 10. This address and pincode was used for grid correspondence. However, the site`s own post-code is yet to be identified. We will notify the DB as soon as it is available. Please see the cover letter for more det (4 components) Geocoding Needed
• BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
• Solar generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
Active • 2026-27 (T-4)
32.89 MW
Coxhall Power, Coxhall Road, Tattingstone, Ipswich, IP9 2NH (2 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Storage (Duration 2h) Storage (Duration 3h) URBAN RESERVE STORAGE LIMITED New Build Generating CMU Coxhall Power Coxhall Power IP9
Active • 2027-28 (T-4), 2026-27 (T-4)
2.28 MW
Craigton Interchange, Linburn, Bishopton, Renfrewshire, Scotland, PA7 5NT, United Kingdom (3 components)

30MW/30MWh one hour battery (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
18.49 MW
Denmead Farm Edneys Lane Denmead Waterlooville Hampshire PO7 6JN (1 component)

A 49.400 MW / 98.800 MWh battery energy storage system

Storage (Duration 2h) ENSO GREEN HOLDINGS LIMITED New Build Generating CMU LOVEDEAN Not Prequalified PO7
Active • 2026-27 (T-4)
11.67 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (60 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS to be installed within a Greener Grid Park
Active • 2028-29 (T-4), 2026-27 (T-4) ...
39.02 MW
Eccles Birgham Farm TD12 4LU (9 components)
• 50MW battery storage located near to the SPT Eccles substation
• 50MW battery storage located near to the SPT Eccles substation.
• Lithium ion battery storage plant.
Storage (Duration 2h) Storage (Duration 4h) ZENOBE ECCLES LIMITED New Build Generating CMU Blackhillock extension Eccles +4 more TD12
Active • 2027-28 (T-4), 2026-27 (T-4)
171.47 MW
Loading map...
Showing 25 locations