Storage (Duration 2h)

178 unique locations (798 components) - Page 1 of 8

Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (4 components)
• Existing CMU comprising of battery storage and associated plant (2)
• New Build CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.31 MW
West of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4)
8.03 MW
West of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4)
8.98 MW
Welwyn Power, Tewin Road, Welwyn Garden City, AL7 1BH (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2026-27 (T-4)
1.18 MW
Wellington Street, Oldham, Lancashire OL4 1SA (7 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment. (2)
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
7.09 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
• Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
16.07 MW
UK Power Reserve, Traston Road, Newport, South Wales, NP19 4RQ (4 components)
• CMU ID 22NEW4, a new build battery storage CMU
• CMU ID 23NEW1, a new build battery storage CMU
• CMU ID 24NEW1, a new build battery storage CMU
Active • 2026-27 (T-4), 2025-26 (T-1) ...
8.47 MW
The Manorway, Stanford-le-Hope, SS17 9LL (3 components)
• A Battery Energy Storage System (2)
• Reciprocating engines of 6 mW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.74 MW
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is … (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
The Common, Malmesbury, SN16 9RJ (2 components)
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Active • 2026-27 (T-4), 2025-26 (T-4)
7.08 MW
Tees Dock Road Redcar and Cleveland Tees Valley England TS6 7AB (1 component)

A new build 100MW/200MWh battery storage facility connected to the Transmission network, located in Teesworks, Redcar

Active • 2026-27 (T-4)
23.04 MW
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JP (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.

Active • 2026-27 (T-4)
2.20 MW
14.18 MW
Steam Lane, Avonmouth industrial Estate, Bristol, BS11 0YT (2 components)

20 x 1.1MWh battery modules connected to provide 10MW max instantaneous output and 20MWh energy output per day. All batteries are class [XX]. (2)

Active • 2026-27 (T-4), 2023-24 (T-1)
2.36 MW
Stanely WWTW, Gleniffer Rd, Paisley, PA2 8UE (1 component)

60MW/120MWh BESS

Active • 2026-27 (T-4)
14.18 MW
South West side of the A444, Castle Gresley, DE11 9ES (1 component)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Active • 2026-27 (T-4)
3.13 MW
SOUTH OF NATIONAL GRID IVER SUBSTATION, SLOUGH ROAD, IVER HEATH UB8 2FX (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4)
7.56 MW
Southmoor Lane, Havant, Hampshire, PO9 1JW (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
7.09 MW
South Fambridge Hall Solar Farm Fambridge Road, South Fambridge, Rochford, SS4 3LS (1 component)

20MW/40MWh of Lithium Iron Battery Electric Storage System, comprising 6 storage containers, and associated metering, switchgear and electrical infrastructure. the Battery will be its own BMU and will be co-located …

Active • 2026-27 (T-4)
4.61 MW
South East of Norwich Substation, Ipswich Road, Stoke Holy Cross, South Norfolk, Norfolk, England, NR14 8PQ (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4)
8.98 MW
Smithyard Lane, Williton, TA4 4NN (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2026-27 (T-4), 2023-24 (T-1)
2.18 MW
Slack Lane, Westhoughton, BL5 3QH (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
4.25 MW
Slack Lane, Westhoughton, BL5 3LB (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
2.13 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (6 components)
• 50MW of BESS to be installed within a future Greener Grid Park. (2)
• BESS project to be installed within a future Greener Grid Park.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
37.96 MW
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (4 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV …
Active • 2027-28 (T-4), 2026-27 (T-4) ...
4.87 MW
Loading map...
Showing 25 locations