Storage (Duration 2h)

2 unique locations (6 components)

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Land north west of Braintree Substation Braintree Road Cressing, Braintree CM77 8EZ (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 2h) Storage (Duration 9h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Braintree Pivot Power Braintree +1 more CM77
Active • 2027-28 (T-4), 2026-27 (T-4) ...
16.89 MW
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 2h) Storage (Duration 9h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Bredbury Pivot Power Bredbury +1 more SK6
Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.07 MW
Loading map...
Showing 2 locations