Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

175 unique locations (798 components) - Page 1 of 7

132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Active • 2027-28 (T-4), 2025-26 (T-4) ...
93.41 MW
34 Bochum Parkway, S8 8JR (1 component)

A Distribution Connected Battery Energy Storage System

Active • 2027-28 (T-4)
3.08 MW
A981, Fraserburgh, Aberdeenshire, Scotland, AB43 7FW, United Kingdom (1 component)

A new build 45MW / 90MWh battery energy storage system

Active • 2027-28 (T-4)
4.16 MW
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
• 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
• 75MW battery storage located near to the National Grid Stalybridge substation.
Active • 2027-28 (T-4), 2026-27 (T-4)
58.53 MW
Adswood Road, Cheadle Hulme, Stockport, Greater Manchester, SK8 5QY (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
20.56 MW
Aikengall 2a Wind Farm Innerwick EH42 1SG (2 components)

New Build Battery Energy Storage System. To be connected at WesterDod 132kV substation. (2)

Active • 2027-28 (T-4), 2024-25 (T-1)
6.70 MW
Ash Lane, Bramley, Little London, Basingstoke and Deane, Hampshire, RG26 5FL, United Kingdom (1 component)

New build 49.995MW / 99.990MWh battery energy storage system.

Active • 2027-28 (T-4)
4.62 MW
Ashlett Creek, Fawley, Hampshire, SO45 1DT (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
11.08 MW
B970, Boat of Garten, Highland, Scotland, PH24 3BY, United Kingdom (1 component)

New build 49.9MW / 99.8MWh battery energy storage system

Active • 2027-28 (T-4)
4.62 MW
Basingstoke Energy Storage Facility, Basing Road, Old Basing, Basingstoke, Hampshire, RG24 7AL (3 components)

New Build CMU comprising of battery storage and associated plant (3)

Active • 2027-28 (T-4), 2025-26 (T-1) ...
5.29 MW
Bickley Solar Farm, Bickley Solar Farm, Albrighton, Wolverhampton, WV7 3AT (1 component)

This CMU component represents the BESS system of a co-located (solar and storage) site

Active • 2027-28 (T-4)
0.83 MW
Birch Road, Colchester CO2 0EJ (2 components)

This CMU component represents the BESS system of a co-located (solar and storage) site (2)

Active • 2027-28 (T-4), 2025-26 (T-1)
10.68 MW
Burton Green Farm, Hobs Lane, Kenilworth, Warwickshire, CV8 1QB (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
27.04 MW
Calow Green, Calow, North East Derbyshire, S44 5XQ (8 components)

A stand alone Battery Energy Storage System. (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
53.52 MW
Catahoula Fields, Eglantine Lane, Farningham, Kent, DA4 9JL (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
0.68 MW
Chapelton, Fraserburgh, Aberdeenshire, Scotland, AB43 7BL (1 component)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Active • 2027-28 (T-4)
4.62 MW
Chesterfield Road, Sheffield, West Yorkshire, S26 4XB (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
5.40 MW
Church Road, Chelmsford, CM2 8UN (1 component)

This CMU component represents the BESS system of a co-located (solar and storage) site

Active • 2027-28 (T-4)
3.72 MW
Claire Court, Rotherham - former Prince of Wales Power Station, Rotherham, South Yorkshire, S60 1RU (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
4.18 MW
Comhampton Lane, Stourport-on-Severn, DY13 9ST (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
3.62 MW
Coxhall Power, Coxhall Road, Tattingstone, Ipswich, IP9 2NH (2 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV …
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2027-28 (T-4), 2026-27 (T-4)
2.28 MW
DB Cargo, Toton, Nottingham, NG10 1HA (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
2.24 MW
Deep Lane BESS, Plympton, Devon, PL7 5AA (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
4.12 MW
Loading map...
Showing 25 locations