Storage (Duration 2h)
175 unique locations (798 components) - Page 1 of 7
Worset Lane, Whelley Hill Farm, Hart, Hartlepool, TS27 3BH. (1 component)
The CMU component consist of Li-ion (or equivalent) Battery Storage and Inverter units to be installed on designated land at Worset Lane, Whelley Hill Farm, Hart, Hartlepool, TS27 3BH.
Wolverhampton West, Land North of Langley Road, Castlecroft, Wolverhampton, NEAREST POSTCODE WV4 4XX (3 components)
Wise Warren Farm, Warren Lane, Tadcaster, LS24 9NU (1 component)
A new-build energy storage site
Widow Hill, Balderstone Lane, Burnley, BB10 2TA (1 component)
70MW BESS installation made up of 38 units of 4MW batteries - resulting in a storage capacity of >2 hours.
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (4 components)
Wansborough Paper Mill, Watchet, Somerset, TA23 0AY (1 component)
New Build CMU comprising of battery storage and associated plant
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (3 components)
Tyne Tunnel Industrial Estate, North Shields, Tyne & Wear, NE29 7SE (1 component)
New Build CMU comprising of battery storage and associated plant
Tredington Fields Farm, Claydon Solar B, Tredington, Tewkesbury, GL20 7BS (2 components)
Battery Storage (2)
Todrig Farm Coldstream TD12 4JA (5 components)
A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land to the west of Eccles Substation and … (2)
Titchfield Lane, Wickham, Fareham PO15 6DY (3 components)
CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System) (3)
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (4 components)
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (2 components)
New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
The Manorway, Stanford-le-Hope, SS17 9LL (3 components)
The land South-West of the Dunoon Electrical Substation located on Ardnadam Farm, Sandbank, Dunoon, Argyll and Bute, PA23 8PN (2 components)
Battery energy storage system, together with associated equipment, infrastructure and ancillary works. (2)
The land at Rownall Hall Farm, Rownall Road, Wetley Rocks, Stoke-on-Trent, ST9 0BS (1 component)
Battery energy storage facility with a 2 hour duration and a maximum capacity of 300MW, located in Stoke.
Swindon Power Generation Plant, Unit 1, Kingsdown Lane, Swindon, Wiltshire, SN3 4FS (5 components)
Surteco UK Ltd, Widow Hill Road, Burnley, BB10 2TB (1 component)
New Build CMU comprising of battery storage and associated plant
St Philips energy storage facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA (2 components)
New Build CMU comprising of battery storage and associated plant (2)
Staythorpe BESS, Staythorpe Road, Nottinghamshire, NG23 5RE (1 component)
The CMU is a Battery Energy Storage System with a planned 437MW active power output, consisting of containerised batteries.
Station Road, Southfleet, Dartford, Kent, England, DA13 9PA, United Kingdom (1 component)
The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.
Star Inn Farm, Land off the Main Street, Invergowrie, Perth and Kinross, Scotland, DD2 5EG, United Kingdom (1 component)
2 hour Battery Energy Storage System
Stammery Hill, Sector, Axminster, East Devon, Devon, England, EX13 5UH, United Kingdom (1 component)
The proposed power plant would consist of a number new highly efficient lithium-ion battery units plus ancillary equipment. Each genset is based on advanced battery technology.
Speke Hall Avenue, Speke, Liverpool, L24 8DA (3 components)
Slack Lane, Bolton, Greater Manchester, BL5 3LJ (2 components)
New Build CMU comprising of battery storage and associated plant (2)