Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Loading...
Loading...

Storage (Duration 2h)

175 unique locations (798 components) - Page 1 of 7

Worset Lane, Whelley Hill Farm, Hart, Hartlepool, TS27 3BH. (1 component)

The CMU component consist of Li-ion (or equivalent) Battery Storage and Inverter units to be installed on designated land at Worset Lane, Whelley Hill Farm, Hart, Hartlepool, TS27 3BH.

Active • 2027-28 (T-4)
5.54 MW
Wolverhampton West, Land North of Langley Road, Castlecroft, Wolverhampton, NEAREST POSTCODE WV4 4XX (3 components)
• Two hour duration battery storage (2)
• Two duration battery storage
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.56 MW
Wise Warren Farm, Warren Lane, Tadcaster, LS24 9NU (1 component)

A new-build energy storage site

Active • 2027-28 (T-4)
4.31 MW
Widow Hill, Balderstone Lane, Burnley, BB10 2TA (1 component)

70MW BESS installation made up of 38 units of 4MW batteries - resulting in a storage capacity of >2 hours.

Active • 2027-28 (T-4)
10.77 MW
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (4 components)
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park. (2)
• New build generating CMU component - Whaddon Farm BESS
Active • 2027-28 (T-4), 2024-25 (T-1)
1.99 MW
Wansborough Paper Mill, Watchet, Somerset, TA23 0AY (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
1.64 MW
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (3 components)
• New build 49.995MW / 99.990 MWh battery energy storage system. (2)
• New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared …
Active • 2027-28 (T-4), 2025-26 (T-1)
14.67 MW
Tyne Tunnel Industrial Estate, North Shields, Tyne & Wear, NE29 7SE (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
5.34 MW
3.46 MW
Todrig Farm Coldstream TD12 4JA (5 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land to the west of Eccles Substation and … (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
148.15 MW
Titchfield Lane, Wickham, Fareham PO15 6DY (3 components)

CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System) (3)

Active • 2027-28 (T-4), 2025-26 (T-1) ...
21.23 MW
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (4 components)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. (2)
• Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm. It is …
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.18 MW
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (2 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

Active • 2027-28 (T-4)
86.18 MW
The Manorway, Stanford-le-Hope, SS17 9LL (3 components)
• A Battery Energy Storage System (2)
• Reciprocating engines of 6 mW.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.74 MW
The land South-West of the Dunoon Electrical Substation located on Ardnadam Farm, Sandbank, Dunoon, Argyll and Bute, PA23 8PN (2 components)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works. (2)

Active • 2027-28 (T-4), 2024-25 (T-1)
5.23 MW
The land at Rownall Hall Farm, Rownall Road, Wetley Rocks, Stoke-on-Trent, ST9 0BS (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 300MW, located in Stoke.

Active • 2027-28 (T-4)
31.54 MW
Swindon Power Generation Plant, Unit 1, Kingsdown Lane, Swindon, Wiltshire, SN3 4FS (5 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2027-28 (T-4), 2025-26 (T-1) ...
6.67 MW
Surteco UK Ltd, Widow Hill Road, Burnley, BB10 2TB (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2027-28 (T-4)
2.63 MW
St Philips energy storage facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
1.84 MW
Staythorpe BESS, Staythorpe Road, Nottinghamshire, NG23 5RE (1 component)

The CMU is a Battery Energy Storage System with a planned 437MW active power output, consisting of containerised batteries.

Active • 2027-28 (T-4)
36.01 MW
Station Road, Southfleet, Dartford, Kent, England, DA13 9PA, United Kingdom (1 component)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

Active • 2027-28 (T-4)
46.02 MW
Stammery Hill, Sector, Axminster, East Devon, Devon, England, EX13 5UH, United Kingdom (1 component)

The proposed power plant would consist of a number new highly efficient lithium-ion battery units plus ancillary equipment. Each genset is based on advanced battery technology.

Active • 2027-28 (T-4)
22.93 MW
Speke Hall Avenue, Speke, Liverpool, L24 8DA (3 components)
• A new build, battery energy storage system (2)
• A new build, gas fueled generation station.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.47 MW
Slack Lane, Bolton, Greater Manchester, BL5 3LJ (2 components)

New Build CMU comprising of battery storage and associated plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
4.01 MW
Loading map...
Showing 25 locations