Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

6 unique locations (34 components)

Land lying at Southfields Farm, Garsdon, Malmesbury, SN16 9PQ (5 components)

A Battery Energy Storage System.

Active • 2028-29 (T-4), 2025-26 (T-4)
158.59 MW
Land at Somerford Farm, SN16 9RN (5 components)
• A Battery Energy Storage System
• A Battery Energy Storage System.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
97.83 MW
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (10 components)

A Battery Energy Storage System.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
180.71 MW
86.61 MW
Land at Iron Acton Substation, Larks Lane, Iron Acton, BS37 9TX (4 components)
• A Battery Energy Storage System.
• A New Build Gas fuelled power plant.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
35.65 MW
Land at Coopers Lane, Knowsley, Liverpool L33 7TT (5 components)
• A New Build Gas fuelled power plant at Kirkby substation.
• A New Build Transmission Connected Battery Energy Storage System.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
32.48 MW
Loading map...
Showing 6 locations