Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

98 unique locations (810 components) - Page 1 of 4

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (18 components)
• 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
• 425MW of Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
Reciprocating engines Storage (Duration 2h) Storage (Duration 5h) Combined Cycle Gas Turbine (CCGT) CARRINGTON STORAGE LIMITED CARLTON ENERGY NO: 5 LIMITED New Build Generating CMU Trafford Power Battery Storage Unit 1 Trafford Power Battery Storage Unit 1 +15 more M31
Active • 2029-30 (T-4), 2027-28 (T-4) ...
488.49 MW
Adswood Road, Cheadle Hulme, Stockport, Greater Manchester, SK8 5QY (3 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Stockport BESS Stockport BESS Not Prequalified SK8
Active • 2029-30 (T-4), 2028-29 (T-4) ...
32.75 MW
Ashorne Solar, Chesterton Fields Farm, Fosse Way, Ashorne Hill, CV33 9JY (3 components)

Battery Storage

Active • 2029-30 (T-4), 2028-29 (T-4) ...
6.20 MW
Braehead Farm Riccarton Kilmarnock KA1 5LN (8 components)
Storage (Duration 2h) KILMARNOCK ENERGY CENTRE LIMITED Kilmarnock Energy Centre Limited Not Prequalified KA1
Active • 2029-30 (T-4), 2028-29 (T-4)
145.93 MW
Braehead Farm, Riccarton, Kilmarnock, KA1 5LN (8 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land, approximately 250 Metres north of Kilmarnock Substation. …

Storage (Duration 2h) KILMARNOCK ENERGY CENTRE LIMITED Kilmarnock Energy Centre Limited Not Prequalified KA1
Active • 2029-30 (T-4), 2028-29 (T-4)
145.93 MW
Burton Enterprise Park Hawkins Lane Burton upon Trent Staffordshire DE14 1QG (2 components)
• Grid scale energy storage system based on Lithium Ion tech, capable of exporting the declared capacity for the stated duration
• Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
Storage (Duration 2h) FPC ELECTRIC LAND LIMITED New Build Generating CMU BURTON086 DE14
Active • 2029-30 (T-4), 2028-29 (T-4)
9.19 MW
Burton Green Farm, Hobs Lane, Kenilworth, Warwickshire, CV8 1QB (3 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Burton Green Burton Green Not Prequalified CV8
Active • 2029-30 (T-4), 2028-29 (T-4) ...
43.21 MW
Calow Green, Calow, North East Derbyshire, S44 5XQ (9 components)

A stand alone Battery Energy Storage System.

Active • 2029-30 (T-4), 2028-29 (T-4) ...
63.35 MW
Chapelton, Fraserburgh, Aberdeenshire, Scotland, AB43 7BL (2 components)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Active • 2029-30 (T-4), 2027-28 (T-4)
10.00 MW
Chesterfield Road, Sheffield, West Yorkshire, S26 4XB (3 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Chesterfield Chesterfield Not Prequalified S26
Active • 2029-30 (T-4), 2028-29 (T-4) ...
8.57 MW
Cooklands farm, Old Snydale, Pontefract, WF7 6HA (2 components)

A 50MW Distribution Connected Battery Energy Storage System

Storage (Duration 2h) ROOT-POWER (NORTH) LIMITED New Build Generating CMU Cooklands Not Prequalified WF7
Active • 2029-30 (T-4), 2028-29 (T-4)
21.46 MW
Deep Lane BESS, Plympton, Devon, PL7 5AA (3 components)

New Build CMU comprising of battery storage and associated plant

Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Plympton Plympton PL7
Active • 2029-30 (T-4), 2028-29 (T-4) ...
6.51 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (77 components)
• BM Unit T_DINO-1 at Dinorwig Power Station
• BM Unit T_DINO-2 at Dinorwig Power Station
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Hydro)
Active • 2029-30 (T-4), 2028-29 (T-4) ...
4515.20 MW
Dunbar BESS, Dunbar, East Lothian, EH42 1RG, Scotland, UK (2 components)

Total Connection capacity of 49.99MW for Energy Storage. The component will be LFP BESS.

Storage (Duration 2h) Storage (Duration 4h) FRV POWERTEK LIMITED New Build Generating CMU FPL Dunbar BESS EH42
Active • 2029-30 (T-4), 2028-29 (T-4)
11.46 MW
East Tarelgin Farm, Ayr, KA6 6NF (6 components)
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS project to be installed within a Greener Grids Park
Active • 2029-30 (T-4), 2028-29 (T-4) ...
85.72 MW
Farburn?Place, Dyce, Aberdeen, AB21 7GP (3 components)
• 30 MW, 2 hour duration battery storage systems is to be installed. Capacity reduced to 28MW to allow for degradation in DY 28/29 for Extended Performance Test. Please see a cover letter for more details.
• Battery Storage 2 hour duration
Active • 2029-30 (T-4), 2026-27 (T-4) ...
20.04 MW
Felindre Pumping Station Substation, Pant Lasau Road, Llangyfelach, Morriston, SA5 7PA (3 components)
• 16MW/32MWh BESS on a future Greener Grid Park.
• Battery in Greener Grid Park
• Swansea Greener Grid Park is a pioneering BESS project to the west of Rhydypandy Road, Morriston that will help achieve zero carbon emissions in Wales by increasing the stability of the electricity grid and the amount of renewable energy being delivered to the grid network.
Active • 2029-30 (T-4), 2025-26 (T-4)
39.23 MW
Former Sanmex Site, Land at Dalmarnock Road, Rutherglen, South Lanarkshire, G73 1NY (4 components)
• New Build Battery Storage
• New build battery Storage
Active • 2029-30 (T-4), 2028-29 (T-4) ...
39.12 MW
Gladstone St, Blackburn, BB1 3ES (4 components)
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of battery storage and associated plant.
Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Blackburn B Blackburn B +1 more BB1
Active • 2029-30 (T-4), 2028-29 (T-4) ...
13.13 MW
Greenfields Farm Worcester Road Upton Warren Bromsgrove B61 7JD (18 components)

Battery energy storage unit

Storage (Duration 2h) FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Greenfields Farm Greenfields Farm B61
Active • 2029-30 (T-4), 2028-29 (T-4) ...
18.25 MW
Grendon Lakes, Main Road, Grendon, Northampton, Northamptonshire NN7 1JW. (5 components)

Battery Storage Plant

Storage (Duration 1h) Storage (Duration 2h) GRENDON LAKES STORAGE LIMITED New Build Generating CMU Grendon Lakes Storage Limited Grendon Lakes Storage Limited +2 more NN7
Active • 2029-30 (T-4), 2028-29 (T-4) ...
31.19 MW
Higglers Farm, Titchfield Lane, Wickham, Hampshire, PO17 5PQ (3 components)
• New Build CMU comprising of Solar PV and associated plant
• New Build CMU comprising of battery storage and associated plant
Solar Photovoltaic Storage (Duration 2h) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Wickham Wickham Not Prequalified PO17
Active • 2029-30 (T-4), 2028-29 (T-4) ...
11.45 MW
Jameston Farm, Dalry, North Ayrshire, KA24 4EY (2 components)
• 8 x 5.000MWh storage units installed on designated land within a brownfield site at Jameston Farm, Dalry, North Ayrshire, KA24 4EY.
• 9 x 2.222MW/4.874MWh storage units installed on designated land within a brownfield site at Jameston Farm, Dalry, North Ayrshire, KA24 4EY.
Storage (Duration 2h) ARRAN VIEW STORAGE LTD New Build Generating CMU Rejected KA24
Active • 2029-30 (T-4), 2025-26 (T-4)
4.40 MW
Loading map...
Showing 25 locations