Storage (Duration 2h)

2 unique locations (10 components)

Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, ML2 0EF (6 components)
• 49.95MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.
• 49.95MW Battery Storage site at Wishaw. Connected via 33kV substation directly to Transmission network.
• 49.9MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
36.98 MW
Unit 1, Brindley Close, Cheney Manor Industrial Estate, Swindon, SN2 2YW (4 components)

12MW 24MWh battery storage located at Brindley Close in Swindon

Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.44 MW
Loading map...
Showing 2 locations