Storage (Duration 2h)

2 unique locations (2 components)

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Aikengall 2a Wind Farm Innerwick EH42 1SG (1 component)

New Build Battery Energy Storage System. To be connected at WesterDod 132kV substation.

Storage (Duration 2h) AIK2A SUSTAINABLE ENERGY LTD New Build Generating CMU Aikengall IIA BESS Yr 1 Not Prequalified EH42
Active • 2024-25 (T-1)
11.34 MW
Aikengall 2a Wind Farm Innerwick EH42 1SG (1 component)

New Build Battery Energy Storage System. To be connected at WesterDod 132kV substation.

Active • 2027-28 (T-4)
6.70 MW
Loading map...
Showing 2 locations