Storage (Duration 2h)

1 unique locations (1 components)

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
High Flat Farm BESS, Adjacent to East Kilbride 33kV substation G74 4GY (1 component)

Standalone battery storage system connecting at 33kV to the East Killbride substation

Storage (Duration 2h) CATHKIN ENERGY STORAGE LIMITED New Build Generating CMU CATHKIN G74
Active β€’ 2025-26 (T-1)
12.90 MW
Loading map...
Showing 1 locations