Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

5 unique locations (8 components)

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Farburn?Place, Dyce, Aberdeen, AB21 7GP (2 components)

Battery Storage 2 hour duration (2)

Active • 2026-27 (T-4), 2024-25 (T-1)
13.89 MW
Greenfield site, Stainton, Rotherham, S66 7RQ (1 component)

Battery Storage 2 hour duration

Storage (Duration 2h) CBS ENERGY STORAGE ASSETS UK LIMITED New Build Generating CMU Not Prequalified S66
Active • 2026-27 (T-4)
18.90 MW
Malton Road, Malton YO17 8JF (1 component)

A 40MW new build of battery storage unit.

Active • 2027-28 (T-4)
6.16 MW
Newburth, Perth, Scotland, KY14 6EW (1 component)

Storage battery 2h duration

Storage (Duration 2h) CBS ENERGY STORAGE ASSETS UK LIMITED New Build Generating CMU Not Prequalified KY14
Active • 2028-29 (T-4)
13.61 MW
Scawby Brook, Brigg, Lincolnshire, DN20 9LT. (3 components)

Brigg Battery 2 hour duration (3)

Storage (Duration 2h) CBS ENERGY STORAGE ASSETS UK LIMITED New Build Generating CMU 7RES31 7RES31 DN20
Active • 2028-29 (T-4), 2025-26 (T-4) ...
21.09 MW
Loading map...
Showing 5 locations