Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

1 unique locations (4 components)

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Colton Farm Lochead Dunfermline Fife, KY 10. This address and pincode was used for grid correspondence. However, the site`s own post-code is yet to be identified. We will notify the DB as soon as it is available. Please see the cover letter for more det (4 components) Geocoding Needed
β€’ BESS generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
β€’ Solar generation scheme connected to the distribution network (33kV). The generating station has got 29.9MW export and 29.9MW import.
Active β€’ 2026-27 (T-4)
32.89 MW
Loading map...
Showing 1 locations