Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

15 unique locations (189 components)

The Power House Commercial Road Wolverhampton WV1 3QS (6 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• New build battery storage CMU with CMU ID 23AUC1
• To be confirmed once CMU components are known
Active • 2024-25 (T-1), 2022-23 (T-3) ...
10.75 MW
Pillswood Phase 1, Pillswood Farm, Dunswell Farm, Cottingham, East Riding Of Yorkshire, HU16 4JS (5 components)
• A 49.9MW battery energy storage system
• Paper Mill carrying out DSR using load turn-down.
Inactive • 2023-24 (T-1), 2020-21 (T-4)
73.01 MW
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD (7 components)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in NGED's South West region.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
• To be confirmed once CMU components are known
Active • 2025-26 (T-1), 2024-25 (T-1) ...
18.69 MW
Maentwrog Power Station Magnox Ltd Maentwrog nr Blaenau Ffestiniog Gwynedd LL414HY UK (15 components)
• Battery energy storage unit
• Gas CHP engines in commercial horticultural environment with no auxilliary load
• Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd Reservoir. The plant is restricted to the quantity of water it can use as minimum water levels must be maintained in the resevoir. The plant has a connection capacity of 35300kVA and an associated power factor of 0.85.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
80.39 MW
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG. (12 components)
• A gas engine CHP site providing hot water to a local district heating network
• Battery Storage Plant
• Flour & semolina milling business
Active • 2025-26 (T-4), 2024-25 (T-1) ...
59.60 MW
Land To East Of Balsillie Avenue And To The South Of The Limekilns, Glenrothes, Fife, KY6 3ET (3 components)
• Sixteen POSGUs (standby diesel generators).
• This is a 49.99MW battery storage facility connected at 33kV.
• to be provided once CMU Components are known
Active • 2025-26 (T-1), 2020-21 (T-4)
13.16 MW
Land off Mansfield Road, Little Morton Farm, Little Morton, Retford, DN22 8HE (17 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Battery energy storage unit
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.20 MW
Land off, Little Morton Farm, Little Morton, Retford, DN22 8BE (4 components)
• Battery energy storage unit
• Generating Unit 1
• To be confirmed once CMU components are known
Active • 2025-26 (T-4), 2022-23 (T-4)
19.60 MW
Land Off Grey Friars Way, Stafford, ST16 2PE (10 components)
• Battery energy storage unit
• Distribution Centre with behind the meter back-up generation.
• N/A
Active • 2028-29 (T-4), 2023-24 (T-4) ...
10.46 MW
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (10 components)
• Existing CMU comprising of battery storage and associated plant
• Load reduction upon instruction
• New Build CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-1) ...
13.88 MW
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (6 components)
• A Battery Energy Storage System.
• to be confirmed once the CMU components are known
Active • 2028-29 (T-4), 2026-27 (T-4) ...
140.24 MW
Fiddlers Ferry BESS, Widnes Rd, Warrington WA5 2UT (2 components)
• The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries.
• To be confirmed once CMU components are known
Active • 2026-27 (T-4), 2022-23 (T-4)
35.45 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (73 components)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
Craigton Interchange, Linburn, Bishopton, Renfrewshire, Scotland, PA7 5NT, United Kingdom (4 components)
• 30MW/30MWh one hour battery
• bus depot site
• to be provided once CMU Components are known
Active • 2027-28 (T-4), 2025-26 (T-1) ...
19.83 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (15 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
• To be confirmed once CMU components are known
Active • 2025-26 (T-4), 2024-25 (T-4) ...
91.05 MW
Loading map...
Showing 15 locations