Storage (Duration 2h)

2 unique locations (7 components)

Active MW: 19772.39 MW
Inactive MW: 213.61 MW
Pillswood Phase 1, Pillswood Farm, Dunswell Farm, Cottingham, East Riding Of Yorkshire, HU16 4JS (2 components)
• A 49.9MW battery energy storage system
• A battery energy storage system
Storage (Duration 2h) HARMONY (PW) LIMITED Existing Generating CMU PILLSWOOD PILLSWOOD HU16
Active • 2024-25 (T-1), 2023-24 (T-1)
29.21 MW
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (5 components)
• A 49.5MW battery energy storage system (2)
• A 48MW battery energy storage system
Storage Storage (Duration 2h) Storage (Duration 1.5h) HARMONY (PW) LIMITED New Build Generating CMU PILLSWOOD PILLSWOOD +2 more HU16
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 2 locations