Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

9 unique locations (126 components)

Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (9 components)
• 48 MW Battery Energy Storage facility
• 49.5 MW Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
49.62 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (92 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage).
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2324.15 MW
Land north west of Braintree Substation Braintree Road Cressing, Braintree CM77 8EZ (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
33.18 MW
Land to the North and East of Flatworth Substation, High Flatworth, North Shields, NE29 7SU (5 components)
• New Build 49.5 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.54 MW
Land to the rear of Poulson Plant Hire, Wrecclesham Hill, Farnham, GU10 4JU (5 components)
• A new build 19MW battery energy storage system
• A new build 20MW battery energy storage system
Active • 2025-26 (T-4), 2024-25 (T-4) ...
1.79 MW
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (7 components)
• Battery Project on Greenfield Site
• New Build transmission connected Battery Storage site on land Adjacent to National Grid's Rainhill Substation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
83.31 MW
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (2 components)

The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries.

Active • 2027-28 (T-4), 2026-27 (T-4)
0.29 MW
Newby Power, Unit 9, Newby Road Industrial Estate, Stockport, SK7 5DA (2 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2027-28 (T-4), 2026-27 (T-4)
3.42 MW
School Lane, Bamford, Norden, Rochdale, Greater Manchester, England, OL11 5UT, (1 component)

Standalone battery energy storage system

Active • 2026-27 (T-4)
9.93 MW
Loading map...
Showing 9 locations